Archives 14
Facilities Planning Department
Building File, 1946-1972
The Facilties Planning Department Building File was transferred to the University Archives, Washington State in 1962, 1964, 1968, yearly from 1970 to 1974, and in August 1977 (UA 77-23) in accordance with the approved records schedule. The records were described by Patricia M. Gourd in September 1979. A new, more-detailed finding aid was compiled in February, 2000, by Jennifer Ross.
ORGANIZATIONAL HISTORY
In 1967 the University Architect's Office of Washington State University, separately established in 1948, became the Facilities Planning Department. The department oversees the planning and construction or remodeling of all facilities connected with Washington State University.
For earlier records, refer to Archives 239. Later records are located multiple locations.
ARRANGEMENT AND DESCRIPTION
The collection consists of correspondence, reports, budgets, bids, contracts and other papers relative to the design and construction of buildings at Washington State University from approximately 1946-1972. The Facilities Planning Department Building File is arranged numerically using the building numbers assigned by the Facilities Planning Department.
CONTAINER LIST
| Box | Folder | Description |
| Bldg #1 - Administration Building (Thompson Hall) | ||
| 1 | 1 | General remodeling, 1955-1958 |
| 2 | 1946-1954 | |
| 3 | Remodeling, 1955-1956, Otis Elevator Company, Otis Elevator Company Contract 1647 | |
| 4 | Graduate School office remodeling 1961 | |
| 5 | Remodeling bids from other contractors, 1955 | |
| 6 | Remodeling - Purvis Construction Company, 1955-1956, Contract 1704 | |
| 7 | Furnishings, 1956 | |
| 8 | Remodeling, 1955-1956, Purvis Construction Company, general | |
| Bldg #2 - Bryan Hall | ||
| 9 | July, 1951-1952 | |
| 10 | Commerical Builders Inc., 1952 (1/24/52) | |
| 11 | 1946-1957 | |
| 12 | 1956 | |
| 13 | Auditorium chairs, general, 1957-1959 | |
| 14 | Seating bids, July 1958 | |
| 15 | Auditorium chairs, North School Supply, co-contractor, 1958-1959 | |
| Bldg #3 - Fulmer Hall (principally Addition of 1959) | ||
| 2 | 1 | 1945-1957 |
| 2 | Remodeling contract, 1958, Sceva | |
| 3 | Agricultural chemistry building program | |
| 4 | Building program, 1959 | |
| 5 | General correspondence, 1956-1959 | |
| 6 | General correspondence, 1960 | |
| 7 | Harmon, Pray and Detrich, 1961 | |
| 8 | Harmon, Pray, and Detrich, General correspondence, 1960 | |
| 9 | Harmon, Pray, and Detrich, correspondence, 03/1958-12/1959 | |
| 10 | Harmon, Pray, and Detrich, contract and change orders, 1959 | |
| 11 | Dames and Moore correspondence, contract, 1959 | |
| 12 | Weekly progress reports | |
| 3 | 1 | Purvis Construction Company 1961 |
| 2 | Purvis Construction Company, correspondence, 1959 | |
| 3 | Purvis Construction Company, contract and hange orders | |
| 4 | Concrete cylinder tests, U of I | |
| 5 | W.R. O'Rourke Co., Inc. correspondenc (1959) | |
| 6 | Electric Smith, Inc., correspondence (1959 | |
| 7 | Electric Smith, Inc., contract and change orders | |
| 8 | Equipment, general correspondence, 1959 | |
| 4 | 1 | Metalab Equipment company, 1961- |
| 2 | Metalab, contract and change orders | |
| 3 | Metalab (F.T. Crowe Col, Inc), correspondence, 1959-1960 | |
| 4 | Rejected bids (general) | |
| 5 | Rejected bids (mechanical) | |
| 6 | Rejected bids (electrical) | |
| 7 | Rejected bids (equipment) | |
| 8 | Weekly statements of compliance, W.R. O'Rourke Co., 1959 | |
| 9 | Weekly statements of compliance, Metalab Equipment Company | |
| 10 | Weekly statements of compliance, Electric Smith, 1959 | |
| 5 | 1 | Weekly statements of compliance, Purvis Construction Company, 1959 |
| 2 | Budget | |
| 3 | "Building Program" sent to B.A.R., August 16, 1967 | |
| 4 | Ventilation addition, Harmon, Pray, and Detrich | |
| 5 | Ventilation remodeling, Harmon, Pray, and Detrich, contract and change orders | |
| 6 | Ventilation correction, Jaros, Baum, and Bolles, engineers, contract and change orders 1965 | |
| 7 | Ventilation correction, Hall and Campbell-Corres and Contract and Company, consulting engineers, 1966 | |
| 8 | Ventilation remodeling, general correspondence, 1959 | |
| 9 | Ventilation remodeling , Warren, Little, and Lund, Inc., general correspondence, 1960 | |
| 10 | Ventilation remodeling, Warren, Little, and Lund, Inc., change orders and contract | |
| 11 | Rejected bids, ventilation remodeling | |
| 12 | Technical assistance to measure air delivery, 1965 | |
| 13 | Ventilation correction | |
| 6 | 1 | Ventilation problem, general correspondence, 1960, 1961, and 1962 |
| 2 | Ventilation correction, general correspondence, 1963-1967 | |
| 3 | Ventilation correction, Jaros, Baum, and Bolles, engineers, correspondence, 1965-1966 | |
| 4 | Ventilation correction, Jaros, Baum, and Bolles, engineers, correspondence, 1963-1964 | |
| 5 | W.R. O'Rourke Col, Inc., contract and change orders | |
| 6 | Report on ventilating systems | |
| 7 | Report on noise reduction | |
| Bldg #4 - College Hall | ||
| 7 | 1 | H. Halvorson, contract and correspondence, 1949-1950 |
| 2 | 1947-1957 | |
| 3 | Remodeling for English Department, 1961- | |
| 4 | Remodeling, Office of International Programs, general correspondence and budget, 1964- | |
| 5 | Remodling, Office of International Programs, C & S Buildings, Inc., correspondence, 1964- | |
| 6 | Remodeling, Ofice of International Programs, C & S Buildings, Inc., contract and change orders, 1964 | |
| 7 | Remodeling of Office of International Programs, rejected bids, 1964- | |
| 8 | Addition for pharmacy, budget | |
| 9 | Program of requirements for College of Pharmacy, research facilties remodeling | |
| 10 | Remodeling for Pharmacy, N.I.H. submission and carres, 1966, regard to application changes | |
| 11 | General correspondence, 1968 | |
| 12 | General correspondence, 1966 to 1968 (and before) | |
| 13 | Remodeling, Warren, Little, and Lund, contract and change orders | |
| 14 | Remodel, Carlson and James Architects, correspondence, 1967 | |
| 15 | Remodeling, Warren, Little, and Lund, correspondence | |
| 16 | Alterations, rejected bids | |
| 17 | Alterations | |
| Bldg #5 - Commons | ||
| 8 | 1 | Contract |
| 2 | 1946-1953 | |
| 3 | Food service renovations, general correspondence, 1963 | |
| 4 | Renovations, Durkoop and Boyington, agreement and correspondence, 1963 | |
| 5 | Renovations, Sceva Construction Company; and Murphy P.E. correspondence, 1963-1964 | |
| 6 | Renovations, Sceva Construction Company, contract and change orders | |
| 7 | Food service renovations, 1963 | |
| Community Hall and alterations | ||
| 8 | Addition to head residents' apartments, 1964, general correspondence | |
| 9 | Addition to head residents' apartments, Walter M. Varnum, correspondence, 1964 | |
| 10 | Addition to head residents's apartments, Community Hall, Duncan Dunn, Stevens Hall, Walter M. Varnum, contract and change orders, 1964 | |
| 11 | Addition to head residents' apartments, Community Hall Duncan Dunn, Stevens Hall, rejected bids, 1964 | |
| Bldg #8 - Ferry Hall | ||
| 12 | 1956 | |
| 13 | 1962 | |
| 14 | Entrance, general correspondence, 1963 | |
| 15 | Entrance, C & S Builders, Inc., contract, change orders and correspondence | |
| 16 | Rejected bids, entrance, 1963 | |
| Bldg # 9 - Hollingberry Field House | ||
| 9 | 1 | 1945-1952 |
| Bldg #10 - Research Greenhouse | ||
| 2 | 1947-1954 | |
| 3 | B.M. Veltman contracts, evergreenhouse, 1949-1952 | |
| 4 | Science Hall greenhouse | |
| 5 | Entomology | |
| Bldg #11 - Bohler Gymnasium | ||
| 6 | 1948-1953 | |
| 7 | Old gymnasium, 1946-1948 | |
| 8 | Remodeling, general, 1959 | |
| 9 | Remodeling, Lyle Cambell, correspondence, contract, and c.o., 1959 | |
| 10 | Remodeling, C & S Building, general correspondence, 1959 | |
| 11 | Remodeling, C & S Building, contract and change orders, 1959 | |
| 12 | Remodeling, rejected bids, 1959 | |
| 13 | A gymnasium and armory for the State College of Washington, a thesis by Stanley Smith | |
| Bldg #12 - Smith Gymnasium | ||
| 14 | Women's gymnasium | |
| 15 | Women's gym, dance floor, 1945-1946 | |
| Bldg #14 - White Hall | ||
| 10 | 1 | Home economics, 1946-1956 |
| 2 | Home economics, sewing labs, 1952 | |
| 3 | Remodeling for small animal lab budget | |
| 4 | Affidavit of wages paid, remodeling for small animal lab, S.G. Morin and Son, 1965 | |
| 5 | General correspondence, 1960- | |
| 6 | Remodeling for small animal lab, general correspondence, 1964 | |
| 7 | Remodeling for small animal lab, S.G. Morin and Son, and subcontractors, correspondence, 1964-1965 | |
| 8 | Remodeling for small animal laboratory, S.G. Morin and son, contract and change orders, 1964-1965 | |
| 9 | Rejected bids, remodeling for small animal lab, 1964 | |
| 10 | Budget, basement remodeling | |
| 11 | Building program | |
| 12 | West basement, general correspondence, 1966-1968 | |
| 13 | Remodel west basement | |
| 14 | Aylor-Mauser, architects, correspondence, 1966, remodeling, west basement | |
| 15 | Aylor-Mauser, architects, remodel, west basement, contract and change orders, 1966 | |
| 16 | Remodeling, west basement, conference notes, Aylor-Mauser, architets, 1966 | |
| 17 | Remodel, Commercial Builders, Inc., correspondence, 1967-1968 | |
| 18 | Remodel, Commercial Builders, Inc., contract and change orders, 1967 | |
| 19 | Basement remodel, Pittsburgh testing lab concretetesting | |
| 20 | Rejected bids | |
| Bldg #15 - Finch Memorial Hospital | ||
| 11 | 1 | 1947-1950 |
| Bldg #17 - Student Health Service Clinic | ||
| 2 | Budget | |
| 3 | Program statement | |
| 4 | General correspondence, 1965 | |
| 5 | Adkison, architect (9/66), correspondence, 1965 | |
| 6 | Adkison, arhcitect (9/66), contracts and change orders | |
| 7 | Conference notes, Adkison | |
| Bldg #19 - McCroskey Hall | ||
| 8 | 1946-1950 | |
| 9 | Alterations to McCroskey, Stevens, Scott, and Coman Residence Halls, general correspondence, 1965 | |
| 10 | Alterations to McCroskey, Stevens, Scott, and Coman Halls, affadavit of wages paid, S.G. Morin and Son | |
| 11 | Alterations to McCroskey, Stevens, Scott, and Coman Halls, S.G. Morin and Son, correspondence, 1965 | |
| 12 | Alterations to McCroskey, Stevens, Scott, and Coman Halls, S.G. Morin and Son, contract and change orders | |
| 13 | Alterations to McCroskey, Stevens, Scott and Coman Hall, rejected bids, 1965 | |
| Bldg #20 - Carpenter Hall | ||
| 14 | General correspondence, 1961-1962 | |
| 15 | Elevator, Otis Elevator Company, correspondence, contract, change orders, 1960 | |
| 16 | 1949-1955 | |
| 17 | Elevator shaft, Sceva Construction Company, correspondence and contract, 1960 | |
| 18 | Elevator shaft, rejected bids | |
| 19 | Elevator, general, 1959, E. Lyle Campbell, correspondence and contract | |
| Bldg #21 - Old Maintenance Building | ||
| 12 | 1 | Fire station, 1949-1952 |
| Bldg #24 - Morrill Hall | ||
| 2 | Morrill Hall | |
| 3 | 1954, accounting | |
| 4 | 1954-1955 | |
| 5 | 1954-1955 | |
| Bldg #25 - Kimbrough Music Building | ||
| 13 | 1 | Ralf E. Decker, architects, correspondence, 1965-1966 |
| 2 | Ralf E. Decker, architects, correspondence, 1964 | |
| 3 | Ralf E. Decker, architects, correspondence, 1962-1963 | |
| 4 | Acoustical performance of two music buildings, Robin M. Towne and Associates, Inc. | |
| 5 | Ralf E. Decker, A.I.A. Architects, contracts and change orders | |
| 6 | Miss Millwork-budget | |
| 7 | Preliminary presentation | |
| 8 | Affadavit of wages paid, Johnson's Lumber and Millwork Company | |
| 9 | Affadavit of wages paid, Kehne-Crabtree Electric Company, Inc. | |
| 10 | Affadavit of wages paid, Stanek's Nursery, Inc. | |
| 11 | HHFA, 1963 | |
| 12 | Program statement | |
| 13 | General correspondence, 1962-1965 | |
| 14 | Ceramic tile floor problem, general correspondence | |
| 14 | 1 | Hazen and Clark, Inc., correspondence, 1964 |
| 2 | Ralf E. Decker, architect, progress notes | |
| 3 | Lyle E. Marquee and Associates, correspondence, 1963-1964 | |
| 4 | Joseph M. Doyle and Associates, correspondence, 1963-1964 | |
| 5 | Hazen and Clark, Inc., correspondence, 1965 | |
| 6 | Finsh hardware | |
| 7 | Miscellaneous millwork, Johnson Lumber and Millwork Company, correspondence, 1965 | |
| 8 | Miscellaneous millwork, general correspondence, 1965 | |
| 9 | Hazen and Clark, Inc., contract change orders | |
| 10 | Miscellaneous millwork, Johnson Lumber and Millwork Company, contract and change orders | |
| 11 | Testing soil, Washington Testing Laboratories | |
| 12 | Testing, concrete cylinders, University of Idaho, 1964 | |
| 13 | Testing, concrete cylinders, Washington Testing Lab | |
| 14.1 | 1 | Warren, Little and Lund, Inc., correspondence, 1964 |
| 2 | Warren, Little and Lund, Inc., contract and change order | |
| 3 | Kehne-Crabtree Electric Company, correspondence, 1964 | |
| 4 | Kehne-Crabtree Electric Company, contract and change orders | |
| 5 | Interior furnishings, general correspondence, 1962 | |
| 6 | Landscape design, Woerner, general correspondence | |
| 7 | Robert L. Woerner, landscape architect, contract and change orders | |
| 8 | Landscape and sprinkler system, Stanek's Nurseries, Inc. general correspondence, 1965 | |
| 9 | Landscaping and sprinkler system, Stanek's Nurseries, Inc. contract and change orders | |
| 10 | Rejected bids, 1964 | |
| 11 | Rejected bids, mech, 1964 | |
| 12 | Rejected bids, 1964 | |
| 13 | Rejected bids, miscellaneous millwork | |
| 14 | Rejected bids, landscape and sprinkler system, 1965 | |
| Bldg #27 - Boiler Plant | ||
| 15 | 1 | Addition, 1955-1958 |
| 2 | H.W. Beecher, January 1946-August 1946 | |
| 3 | H.W. Beecher III | |
| 4 | H.W. Beecher, 1945 | |
| 5 | Halvorson, Inc. | |
| 6 | Wing, 1948-1949 | |
| 7 | Commercial Building, Inc., 1955-1956 | |
| 8 | Johnson-Busboom-Rauh, 1959 | |
| 9 | General correspondence, 1959 | |
| 10 | Johnson-Busboom-Rauh, 1959 | |
| 11 | Rejected bids, 1959 | |
| Bldg #28 - Home Management House | ||
| 16 | 1 | 1945-1953 |
| Bldg #29 - KWSC Radio Station | ||
| 2 | Arts hall transmitter, 1948-1951 | |
| 3 | Radio booth, Bohler Gym, 1949-1950 | |
| Bldg #30 - Wilmer-Davis Residence Halls | ||
| 4 | Food service renovations, Wilmer-Davis and Duncan-Dunn, general correspondence, 1964, and budget | |
| 5 | Food service renovations, Wilmer-Davis and Duncan-Dunn, C & S Builders Inc., correspondence, 1964 | |
| 6 | Food service renovations at Wilmer-Davis and Duncan-Dunn, C & Builders, Inc., contract, and correspondence, 1964 | |
| 7 | Food service renovations at Wilmer-Davis and Duncan-Dunn, C & S Builders, Inc., contract and change orders | |
| 8 | Rejected bids, food service rennovations at Wilmer-Davis and Duncan-Dunn dining | |
| Bldg #32 - Science Hall | ||
| 9 | 1948-1953 | |
| 10 | 1956 | |
| 11 | Jurgena & Egelkrout, 1949-1950 | |
| 12 | Access improvements, Sceva Construction Company, contract and change orders | |
| 13 | Access improvement, general correspondence, 1962 | |
| 14 | Access improvements, Sceva Construction Company, correspondence, 1962 | |
| Bldg #34 - Stevens Hall | ||
| 15 | General correspondence, 1959- | |
| 16 | 1946-1952 | |
| Bldg #36 - Troy Hall | ||
| 17 | 1945-1949 | |
| 18 | Creamery, 1947-1949 | |
| 19 | 1956, E.O. Johnson contract, #1805 | |
| Bldg #37 - Van Doren Hall | ||
| 20 | 1951-1952 | |
| Bldg #38 - Administration Building Annex | ||
| 21 | Miscellaneous, 1948, College Architect's Office | |
| 22 | Services building, 1953-1957 | |
| 23 | Central switchboard, services building, 1957-1959 | |
| 24 | General correspondence, 1963 | |
| Bldg #39 - Waller Hall | ||
| 24 | 1953 | |
| Bldg #40 - Wilson Hall | ||
| 25 | 1951 | |
| 26 | 1947-1956 | |
| Bldg #44 - McCoy Hall | ||
| 17 | 1 | Large animal convalescent ward, 1948 |
| 2 | Veterinary clinic, 1953-1954 | |
| 3 | X-ray room addition, 1954-1955 | |
| 4 | Weekly statements of compliance, George and Dunham, March 1960- | |
| 5 | Veterinary clinic building, weekly statement of compliance, George & Dunham, August 1959 to February 1960 | |
| 6 | Veterinary clinic building, weekly statements of compliance Warren, Little, and Lund, August 1959 | |
| 7 | Veterinary clinic building, weekly statement of compliance Electric Smith, August 1959 | |
| 8 | Addition building program | |
| 9 | Addition, general correspondence, July 1957-July 1959 | |
| 10 | Addition, general correspondence, August 1959 | |
| 18 | 1 | Veterinary clinic addition, Culler, Gale, Martell, and Norrie, general correspondence, April 1955 to December 1957 |
| 2 | Veterinary clinic addition, Culler, Gale, Martell, and Norrie, general correspondence, January 1958 to July 1959 | |
| 3 | Veterinary clinic addition, Culler, Gale, Martell, and Norrie general correspondence, August 1959 | |
| 4 | Veterinary clinic addition, Culler, Gale, Martell, and Norrie, contract and change orders | |
| 5 | Veterinary clinic addition, H. George and Sons and Dunham Brothers, contract and change orders | |
| 6 | Veterinary clinic addition, H. George and Sons and Dunham Brothers, general correspondence | |
| 7 | Veterinary clinic addition, concrete cylinder tests (University of Idaho) | |
| 19 | 1 | Veterinary clinic addition, Warren, Little, and Lund, Inc., general correspondence |
| 2 | Veterinary clinic addition, Warren, Little, and Lund, Inc, contract and change orders | |
| 3 | Veterinary clinic addition, Electric Smith, Inc., general correspondence | |
| 4 | Veterinary clinic addition, Electric Smith, Inc., contract and change orders | |
| 5 | Electric Smith, Inc., vet clinic, miscellaneous wiring, section c, contract and correspondendence, 1960 | |
| 6 | Veterinary clinic addition, equipment general | |
| 7 | Veterinary clinic addition, rejected bids, general, mechanical and electrical | |
| 8 | Oxygen pipeline system for the veterinary clinic | |
| 9 | Photos of the addition | |
| 10 | Isolation facility | |
| Bldg #45 - Wegner Hall | ||
| 20 | 1 | Program for a new veterinary medical library |
| 2 | Library addition | |
| 3 | Vet classroom, 1948-1956 | |
| 4 | Library addition, budget | |
| 5 | Vet library addition, HHFA Materials, 1962- | |
| 6 | Vet library addition, general correspondence, 1962-1964 | |
| 7 | Vet library addition, J. Kimball Barnard, architect, correspondence, 1962-1964 | |
| 8 | Vet library addition, J.. Kimball Barnard, architect, contracts and change orders | |
| 9 | Library addition, Hazen and Clark, Inc., contract and change orders | |
| 10 | Library addition, Hazen and Clark, Inc., correspondence, 1963 | |
| 11 | Library addition, hardware schedule | |
| 12 | University of Idaho testing lab, library addition, concrete tests, 1963 | |
| 13 | Library addition, furnishings, general correspondence | |
| 14 | Library addition, rejected bids | |
| 15 | Veterinary medicine, library addition, grant application | |
| Bldg #46 - Engineering Laboratory Building | ||
| 16 | 1946-1948 | |
| 17 | Rigg-Architects, 1946-1948 | |
| 18 | Ludberg, 1946-1948 | |
| 19 | Ludberg contracts, 1946-1948 | |
| Bldg #47 - Endoparasite Vector Laboratory--EWS and N House | ||
| Bldg #48 - South House | ||
| Bldg #49 - Sherwood Hall | ||
| 21 | 1 | Nettleton-Baldwin, 1946-1947 |
| 2 | Contracts | |
| 3 | Hudson, Columbia, and cafeteria | |
| 4 | Miscellaneous | |
| Bldg #54 - Smith Agricultural Engineering Laboratory | ||
| 22 | 1 | L.J. Smith Agricultural Engineering Laboratory |
| 2 | Ludberry, 1946-1947 | |
| 3 | Contracts, 1946-1948 | |
| 4 | Ag-engineering building budget | |
| 5 | Ag-engineering building, H.U.D. correspondence | |
| 6 | Ag-engineering building, H.E.F.A. correspondence | |
| 7 | Lab program | |
| 8 | General correspondence, 1966 | |
| 9 | Evanoff and Kabush, architects, correspondence, 1968 | |
| 23 | 1 | Evanoff and Kabush, architects, correspondence, 1966-1967 |
| 2 | Evanoff and Kabush, architects, contract and change orders | |
| 3 | Industrial Builders, Inc., correspondence | |
| 4 | Industrial Builders, Inc., contract and change orders general correspondence | |
| 5 | Warren, Little, and Lund, correspondence | |
| 6 | Warren, Little, and Lund, contract and change orders mechanical construction | |
| 7 | Frost Electric Company, correspondence | |
| 8 | Frost Electric Company, contract and change orders, electrical construction | |
| 9 | Rejected bids, general, 1967 | |
| 10 | Rejected bids, mechanical, 1967 | |
| 11 | Rejected bids, electrical, 1967 | |
| Bldg #55 - Todd Hall | ||
| 24 | 1 | Classroom building, 1946-1947 |
| 2 | Nettleton and Baldwin, 1947-1949 | |
| 3 | Todd contracts, 1947-1949 | |
| 4 | Maloney, 1946-1950 | |
| 5 | Progress reports (classroom) | |
| 6 | 1955-1957 | |
| 7 | Classroom building, general, 1948-1954 | |
| 8 | Guarantees classroom, 1949 | |
| 9 | Equipment preliminary | |
| 10 | Equipment, 1949-1950 | |
| Bldg #56 - Dana Hall | ||
| 25 | 1 | Technology Building, 1945, Whitehouse and Price |
| 2 | Miscellaneous, 1945-1958 | |
| 3 | Tech. and metals annex | |
| 4 | Whitehouse and Price, 1946-1947 | |
| 5 | Whitehouse and price, 1947-1949 | |
| 6 | Contracts, 1946-1949, Whitehouse and Price | |
| 7 | Henry George and Sons, 1947-1949 | |
| 8 | Henry George and Sons, contracts, 1946-1949, tech | |
| 9 | Technology building-equipment | |
| 26 | 1 | January 16, 1947-July 19, 1961 |
| 2 | Specifications for the construction of Institute of Technology Building and Institute and Technology Annex Building | |
| 3 | Third floor remodeling, Technology Building weekly statement of compliance, Purvis Construction Company | |
| 4 | Technology building, third floor remodeling, general correspondence, (1960-) | |
| 5 | Third floor remodeling, Purvis Construction Company, correspondence, and change orders | |
| 6 | Technology building, third floor remodeling, rejected bids, August 23, 1960 | |
| 7 | Third floor completion, general, 1961 | |
| 8 | Third floor completion, Wood and Landerholdm, contract and correspondence, 1961 | |
| 9 | Third floor completion, Vern Johnson and Sons, correspondence, 1961 | |
| 10 | Vern Johnson and Sons, third floor completion, contract and change orders | |
| 11 | Third floor completion, rejected bids, August 10, 1961 | |
| Bldg #57 - Mining Experiment Station and Wood Products Laboratory | ||
| 27 | 1 | Addition, 1954 |
| 2 | Addition, Laboratory, 1958-1959 | |
| Bldg #58 - Old Education Building | ||
| 3 | 1947-1948 | |
| 4 | Basement, 1947-1948 | |
| Bldg #59 - Spillman Hall | ||
| 5 | 1946-1948 | |
| 6 | E.O. Johnson Contractor, 1947 | |
| 7 | Basement, 1948-1949 | |
| Bldg #61 - Stadium Commons | ||
| 8 | Cafeteria, kitchen, 1947 | |
| 9 | Cafeteria, 1948-1949 | |
| Bldg #62 - Holland Library | ||
| 28 | 1 | Miscellaneous |
| 2 | Miscellaneous | |
| 3 | General | |
| 4 | 1956- | |
| 5 | Progress report | |
| 6 | Maloney--library | |
| 7 | Henry George and Sons | |
| 8 | Contracts | |
| 10 | Contracts | |
| 29 | 1 | Contracts |
| 2 | Rigg - Library | |
| 3 | Library | |
| 4 | Detweiler and Detweiler | |
| 5 | Excavation | |
| 6 | Contracts | |
| 7 | Subcontract guarantees | |
| 8 | Equipment | |
| 9 | Library sculpturing, D. Pratt | |
| 10 | Special millwork | |
| Bldg #63 - Wilson Compton Union Building | ||
| 30 | 1 | Building program for the Washington State College Union |
| 2 | Working committee | |
| 3 | Concrete test reports | |
| 4 | Union general | |
| 5 | Progress report | |
| 6 | Union, preliminary | |
| 7 | Correspondence, 1948-1949 | |
| 8 | Correspondence | |
| 9 | Correspondence | |
| 31 | 1 | Construction cost information |
| 2 | Planning for the operation | |
| 3 | General, 1955 | |
| 4 | Union | |
| 5 | Maloney, 1948-1950 | |
| 6 | Maloney, 1951 | |
| 7 | Maloney, 1952-1955 | |
| 8 | Contracts | |
| 9 | Henry George and Sons | |
| 32 | 1 | Sub contracts |
| 2 | Contracts | |
| 3 | Excavating, Stinson and Levold | |
| 4 | Henry George and Sons, 1950-1951 | |
| 5 | Sub contracts, purchase orders | |
| 6 | Equipment purchased | |
| 7 | Interior decoration, 1952 | |
| 33 | 1 | Interior decoration, 1951, (Harrell) |
| 2 | Harrell, furniture list | |
| 3 | Tech-crafting | |
| 4 | Bid proposals, furniture, carpet, draperies | |
| 5 | Carpet and draperies | |
| 6 | Furniture | |
| 7 | Frederick and Nelson (furniture) | |
| 8 | Bon Marche | |
| 9 | Northern School Supply Co. (sound system) | |
| 10 | Contracts and purchases | |
| 11 | Completion contracts and purchases | |
| 12 | Extra copies, furniture list, 1952, including modifications and changes from basic specifications | |
| 34 | 1 | Fountain addition, general |
| 2 | 1956-1957, general correspondence | |
| 3 | John W. Maloney, architect, general | |
| 4 | John W. Maloney, architect, contract | |
| 5 | Sceva Construction Company, addition, general | |
| 6 | Sceva Construction Company, contract | |
| 7 | Brodie National, contract, booths, fountain addition | |
| 8 | Selden's of Kennewick, rubber tile flooring, WCUB, room 101-101A | |
| 9 | Bulletin board, class of 1959, coming events sign, 1959 | |
| 10 | Cafeteria line remodeling, Krueger Sheet Metal Company, correspondence, contract, and c.o.'s, 1960 | |
| 11 | South terrace, Domit Construction Company, contract and change orders and correspondence | |
| 12 | South terrace at P.O. Entrance, rejected bids, 1962 | |
| 13 | Cafeteria line remodeling, general correspondence, 1960 | |
| 14 | South terrace at P.O. entrance, general correspondence, 1962 | |
| 15 | Ceiling completion, room 1, not B- 1, general correspondence, October 1961 | |
| 16 | Ceiling completion, room 1, noise control of Spokane, Inc., contract and correspondence | |
| 17 | Butch's Den, room B-1 | |
| 18 | Completion of room B-1, C & S Builders, Inc., contract, change orders, correspondence, 1962 | |
| 19 | Completion of room B-1, rejected bids, 1962 | |
| 20 | Alteration to entrance, general correspondence, 1963- | |
| 21 | Alterations to entrances, Sceva Construction Co., Inc., correspondence | |
| 22 | Alterations to entrances, Sceva Construction Co., Inc., contract and change orders | |
| 23 | Alterations to entrances, rejected bids, 1963 | |
| 24 | Addition, DHUD project summary, (ch-Wash-87 (s)) | |
| 25 | Department of Housing and Urban Development, addition correspondence, 1966-1967 | |
| 35 | 1 | Building addition, construction inspection and progress report, Maloney Herrington, et al. |
| 2 | Building addition, conference notes, Maloney, Herrington, et al., 1968 | |
| 3 | Preliminary building program, addition and remodeling | |
| 4 | Color schedule | |
| 5 | Maloney, Herrington, Freesz, and Lund, Architects, correspondence, 1965-1966 | |
| 6 | Maloney, Herrington, Freesz, and Lund, Architects, correspondence, 1967 | |
| 7 | Maloney, Herrington, Freesz, and Lund, Architects, contracts and change orders, 1965-1967 | |
| 8 | Maloney, Herrington, Freesz, and Lund, Architects, correspondence, 1968-1970 | |
| 36 | 1 | Addition, building program |
| 2 | Programming | |
| 3 | Addition, general correspondence, 1965-1966 | |
| 4 | Addition, general correspondence, 1967 | |
| 5 | Addition, general correspondence, 1968-1970 | |
| 6 | Addition, budget | |
| 7 | Addition, conference notes, Maloney, Herrington, Freesz, and Lund, 1965-1967 | |
| 37 | 1 | Addition, Max J. Kuney Company, correspondence, 1967 |
| 2 | Finish hardware | |
| 3 | Addition, Pittsburgh Testing Lab, concrete testing | |
| 4 | Keying schedule | |
| 5 | W.R. O'Rourke Co., Inc., correspondence, 1967 | |
| 6 | Report on foundation investigation additions | |
| 7 | Addition, W. R. O'Rourke Co., Inc., contract and change orders, mechanical, 1967 | |
| 8 | Addition, Power City Electric, Inc., contracts and change orders, Electric, 1967 | |
| 9 | Addition, Power City Electric, Inc., correspondence, 1967 | |
| 10 | Addition, John R. Carlson Associates, Ltd., correspondence, consultants, 1966 | |
| 11 | Addition, Max J. Kuney Company, contract and change orders, general correspondence, 1967 | |
| 38 | 1 | Addition, McKesson and Robbins, Inc., contract and change orders, food service equipment, 1967 |
| 2 | Addition, McKesson and Robbins, Inc., correspondence, 1967 | |
| 3 | Furnishings Maloney, Herrington, F and L correspondence | |
| 4 | Furnishings, Spokane Dry Goods, correspondence, 1968 | |
| 5 | Spokane Dry Goods Co., contract and change orders | |
| 6 | Addition, Stanek's Inc., correspondence, 1967 | |
| 7 | Addition, Stanek's, Inc., contract and change orders landscaping, 1967 | |
| 8 | Addition, 1967, combined rejected bids | |
| 9 | Rejected bids, furnishing | |
| Bldg #64 - Student Book Corporation | ||
| 39 | 1 | Study for locatiion |
| 2 | General | |
| 3 | White | |
| 4 | Contracts | |
| 5 | K. Wood | |
| 6 | S.G. Morin and Sons | |
| 7 | Contracts | |
| 8 | Stillwell heating | |
| 9 | Contracts | |
| 10 | Maxwell's, Inc. | |
| 11 | Contract | |
| 12 | Behren's Furniture Company | |
| 40 | 1 | Contracts |
| 2 | Display fixture bids | |
| 3 | Fixtures, 1955 | |
| 4 | Union Sash and Door Co., contract, display fixtures | |
| 5 | Miscellaneous small contracts | |
| 6 | Bids, other contractors | |
| 7 | Remodel, general correspondence, 1962-1966 | |
| 8 | Remodel, Trogdon and Smith, architects, correspondence, 1964 | |
| 9 | Remodel, Trogdon and Smith, architects, correspondence, 1962-1963 | |
| 10 | Addition, Hazen and Clark, Inc., contract and change orders | |
| 11 | Remodel, Trogdon and Smith, contracts and change orders, 1962 | |
| 12 | Remodel, Henry Berry Associates, Inc. fixture design consultant, 1962 | |
| 13 | Addition, construction reports | |
| 14 | Addition, Hazen and Clark, Inc., correspondence, 1963 | |
| 15 | Addition, finish hardware, 1963 | |
| 16 | University of Idaho Testing Lab, addition, 1963 | |
| 41 | 1 | Addition, Powell Plumbing and Heating, contract and change orders |
| 2 | Addition, Powell Plumbing and Heating, correspondence, 1963, Rice and Strecker | |
| 3 | Addition, Electric Smith Construction and Equipment Co., correspondence, 1963 | |
| 4 | Addition, Electric Smith Construction and Equipment Co., contract and change orders | |
| 5 | Addition, casework remodeling, general correspondene, 1964 | |
| 6 | Addition existing casework, remodeling, Johnson's Lumber and Millwork Co., correspondence, 1964 | |
| 7 | Addition existing casework, remodeling, John's Lumber and Millwork, contract and change orders | |
| 8 | Addition, store fixtures, Kop Cabinet Shop, correspondence | |
| 9 | Addition, store fixtures, Kop Cabinet Shop, contract and change orders | |
| 10 | Addition, landscape work and sprinker system, general correspondence, 1964 | |
| 11 | Addition, L. Keith Hellstrom, landscape architect, correspondence | |
| 12 | Addition, landscape architect, L. Keith Hellstrom, ASLA, contracts and orders | |
| 13 | Landscape, work and sprinker system, Stanek's Nurseries, Inc., correspondence, 1964 | |
| 14 | Landscape, contracts and change orders, work and sprinkler systems,, Stanek's Nurseries, Inc. | |
| 15 | Landscape, affidavit of wages paid, Stanek's Nurseries, Inc. | |
| 16 | Addition, rejected bids, general, 1963 | |
| 17 | Addition, rejected bids, mechanical, 1963 | |
| 18 | Addition, rejected bids, electrical, 1963 | |
| 19 | Addition, rejected bids, store fixtures, 1963 | |
| 20 | Addition, existing casework remodeling, rejected bids | |
| 21 | Rejected bids, landscape work and sprinkler system, 1964 | |
| Bldg #65 - Regents Hill | ||
| 42 | 1 | Women's dormitory, general |
| 2 | Thiry, construction, 1950 | |
| 3 | Contracts, constructions | |
| 4 | Thiry, construction, 1952 | |
| 5 | Thiry, construction, 1951 | |
| 6 | Construction, preliminary, general | |
| 7 | Sound Construction, 1952 | |
| 8 | Women's dormitory, 1950 | |
| 9 | Progress reports, construction, 1952 | |
| 10 | 1957 | |
| 11 | Progress reports, 1950-1951 | |
| 12 | Construction, concrete test reports | |
| 43 | 1 | Contracts, construction |
| 2 | Sound Construction, 1950-1951 | |
| 3 | H.D. Powell, 1950-1951, construction | |
| 4 | H.D. Powell, 1952, construction | |
| 5 | Contract, construction | |
| 6 | Lighthouse, Baldwin Briggs, construction | |
| 7 | Contracts, construction | |
| 8 | Equipment, construction | |
| 9 | Furnishings, Bon Marche | |
| 10 | Furnishings, constructions | |
| 44 | 1 | Glossy prints |
| 2 | Prints, interior sketches | |
| 3 | Negative photographs, floor plan | |
| 4 | Prints | |
| 5 | Briggs vs. W.S.C. | |
| 6 | Alterations and addition to serving counters, Regents Dining, 1964, Krueger Sheet Metal Company, contract, orders, general correspondence | |
| 7 | Addition | |
| 8 | General correspondence, 1962, 1964, 1966 | |
| Bldg #66A - Physical Plant Garage | ||
| 45 | 1 | Budget |
| 2 | General correspondence, 1963 | |
| 3 | Sceva Construction Company, correspondence, 1963-1964 | |
| 4 | Sceva Construction Company, contract and change orders | |
| 5 | Rejected bids, 1963 | |
| 6 | Automotive service garage, II, completion of interior spaces, general correspondence, 1964 | |
| 7 | Automotive service garage, phase 2, Walter M. Varnum, correspondence, 1964 | |
| 8 | Automotive service garage, II, Walter M. Varnum, contract and change orders | |
| 9 | Rejected bids, phase 2 | |
| Bldg #67 - Jewett Observatory | ||
| 10 | Jewett Observatory | |
| 11 | Purchase orders | |
| 12 | Halvorson, 1951-1953 | |
| 13 | Contracts | |
| 14 | Timber structures, 1951 | |
| 15 | General machinery, 1951-1952 | |
| Bldg #68 - Cattle Disease Building | ||
| 16 | 1953-1954 | |
| 17 | Chain link fence, 1954 | |
| Bldg #69A - Charles E. McAllister Hall | ||
| Bldg #69B - William c. Kruegal Hall | ||
| Bldg #70 - Thomas Neill Hall | ||
| 46 | 1 | Men's dormitory, general |
| 2 | Jones, general, 1954 | |
| 3 | Jones, general, 1955-1960 | |
| 4 | Jones, contract, 1 | |
| 5 | General construction, James I. Barnes Construction Company | |
| 47 | 1 | Contract 1590, James I. Barnes Construction Company, general |
| 2 | James I. Barnes, paving walks and streets, contract 1591 | |
| 3 | James I. Barnes, tunnel, general construction, contract1592 | |
| 4 | Mechanical, James Smyth Plumbing and Heating | |
| 5 | Mechanical contract, James Smyth Plumbing and Heating, 1598 | |
| 6 | Mechanical contract, James Smyth Plumbing and Heating, 1599 | |
| 7 | Miscellaneous bids, residence hall for men, electrical, mechanical and general construction, bonds returned | |
| 8 | Electric Smith, residence halls for men | |
| 9 | Contracts, Electric Smith, residence hall, 1596 | |
| 48 | 1 | Contracts, Electric Smith, residence halls, #1597 |
| 2 | Build-in, furniture, Roy Hilliard and Associates, general | |
| 3 | Contract, built-in-furniture, Roy Hilliard and Associates, No. 1594 | |
| 4 | Furniture, Roy Hilliard and Associates, general | |
| 5 | Contract, furniture, Roy Hilliard and Associates, 1638, professional services | |
| 6 | Rough draft specifications, interior furnishings, 1956 | |
| 7 | Interior furnishings, the Bon Marche | |
| 8 | Interior furnishings, the Bon Marche, contract #1767 | |
| 9 | Interior furnishings, typical student rooms, wing "B" and ramp "B" | |
| 10 | Interior furnishings, typical student rooms, wing "A" and ramp "A" | |
| 11 | Interior furnishings, typical student rooms, wing "C" and ramp "C" | |
| 12 | Furnishing, small contracts, drapery rods, Brown Furniture | |
| 13 | Walk contract-insulation, men's dorms | |
| 14 | Inter-communicatiions system | |
| Bldg #71 - Albrook Hydraulics Laboratory | ||
| 49 | 1 | New hydraulics laboratory site, 1954-1957 |
| 2 | Addition, Hansen and Parr, 1956-1957 | |
| 3 | Addition, B and C Construction, 1956 | |
| 4 | West addition, E. O. Johnson, 1957 | |
| 5 | Phase II and I, south addition, budget | |
| 6 | General correspondence, 1960-November 1965 | |
| 7 | Addition, general correspondence, 1962, phase I, March 1962-September 1963 | |
| 8 | Addition, phase I, Benjamin K. Ruehl, correspondence, 1962, south addition | |
| 9 | Addition, phase I, Commercial Builders, Inc., correspondence, 1962 | |
| 10 | Office and computer area, addition, phase II, general correspondence, 1962-November 1962 | |
| 11 | Addition, Commerical Builders, Inc., contract, 1962 phase I, south addition | |
| 12 | Addition, phase II (office and computer area), Benjamin K. Ruehl, correspondence, 1962 | |
| 13 | Alterations, Benjamin K. Ruehl, contract, 1962, phase 1 and 2 | |
| 14 | Office and computer area, phase II, additon, C & S Builders, correspondence, 1962 | |
| 15 | Office and computer area, phase II, 1962, C & S Builders, contract and change orders | |
| 16 | Rejected bids, phase I and II, 1962 | |
| 17 | Concrete flume, Domit Construction Company, contract and change orders, correspondence, 1961 | |
| 18 | Concrete flume, rejected bids, July 14, 1961 | |
| 50 | 1 | Water Research Building, September 1965-April 1967 |
| 2 | Water Research Building, Higher Eduction Facilities Act, correspondence, 1966-March 1967 | |
| 3 | Water Research Builders, general correspondence, March 1964-1965, 1966-1969 | |
| 4 | Water Research Building, Carlson and James, architects, general correspondence, September 1965-July 1967 | |
| 5 | Water Research Building, Carlson and James, architects, contracts and change orders, 1965, September 1965-June 1967 | |
| 6 | Water Research Center, C and S Builders, Inc., correspondence, April 1966-November 1966 | |
| 7 | Water Research Center, April 1966-June 1967, C and S Builders, Inc., contract and change orders, 1967 | |
| 8 | Water Research Building, finish hardware, November 1966 | |
| 9 | Water Research Center, Washington Testing Lab, Inc., concrete testing, September 1966 | |
| 10 | Water Research Center, rejected bids, May 1966 | |
| Bldg #72 - Coman Hall | ||
| Bldg #73 - Scott Hall (also Bldg #419) | ||
| 51 | 1 | Paul Thiry, contract, November 1955-March 1999 |
| 2 | Halvorson contracts, September 1956-October 1958 | |
| 3 | Change orders, H. Halvorson, Nc., general, women's residence buildings, February 1957-September 1958 | |
| 4 | Finish hardware, women's residence halls, January 1957-March 1957 | |
| 5 | Revised hardware schedule, women's dorms, March 1957 | |
| 6 | Senna Mechanical, general, September 1956-December 1958 | |
| 7 | Senna Mechanical contract, September 1958 | |
| 8 | Change orders, Senna Service, Inc., mechanical, women's residence buildings, December 1959-June 1958 | |
| 9 | Electric Smith, general, September 1956-January 1959 | |
| 10 | Electric Smith, contract, June 1965-September 1958 | |
| 11 | Change orders, Electric Smith, Inc., January 1957- April 1958 | |
| 52 | 1 | Neill Furniture, contract and correspondence, stock furniture items, May 1958-October 1958 |
| 2 | House of Carpets, contract and correspondence, May 1958-October 1958 | |
| 3 | Furnishings, general, May 1958-November 1958 | |
| 4 | Furniture, hardwood analysis, June 1958-September 1958 | |
| 5 | Spokane Dry Goods, custom furniture, carpets, and draperies, May 1958-April 1959 | |
| 6 | Rejected bids, furnishings, May 1958 | |
| 7 | Steps and walks, October 1958-November 1959 | |
| 8 | Extra copies of material submission, to Regents etc., women's dorms | |
| 9 | Women's dorms, conc. cycls., lab reports, October 1956- October 1957 | |
| 10 | Bids | |
| 11 | Acoustic tile ceiling, correspondence, 1964 | |
| 12 | Acoustic tile ceiling, Noise Control of Spokane contract change orders and correspondence, July and August 1964 | |
| 13 | Acoustic tile ceiling, Clyde Stricker, Inc., contract change orders and correspondence, 1964 | |
| 14 | General correspondence, 1966 | |
| 15 | Rejected bids | |
| Bldg #74 - Nuclear Radiation Center | ||
| 53 | 1 | General, January 1955-October 1960 |
| 2 | L.C. Campbell, consulting engineer, January 1957-December 1958 | |
| 3 | Sceva Construction, general, July 1957-February 1959 | |
| 4 | Sceva Construction contract, July 1957-December 1958 | |
| 5 | Smyth Plumbing and Heating, general, July 1957-July 1959 | |
| 6 | Smyth contract, July 1957-April 1959 | |
| 7 | Electric Smith, general, September 1957-December 1958 | |
| 8 | Electric Smith contracts, July 1957-February 1959 | |
| 9 | Kendall M. Wood, engineering services, February 1957- November 1958 | |
| 10 | Kendall M. Wood, contract, nuclear reactor, March 1957- February 1959 | |
| 11 | Reactor building, concrete test lab reports, University of Idaho, September 1957-August 1958 | |
| 12 | High density concrete, Shielding, June 1958-March 1959 | |
| 13 | Rejected bids, July 1957 | |
| 14 | Pool lining, August 1958-December 1958 | |
| 54 | 1 | General correspondence, 1963-1969 |
| 2 | Rejected bids, metal storage building | |
| 3 | Metal storage building, general correspondence, 1964 | |
| 4 | Hahn and Campbell, structural engineer, correspondence, 1964 | |
| 5 | Hahn and Campbell, consulting engineering contract | |
| 6 | Metal storage building, Northwestern Construction, correspondence, 1964 | |
| 7 | Metal storage building, Northwestern Construction, contract and change orders | |
| 8 | Budget | |
| 9 | Proposal for Science Facilities Grant, nuclear reactor lab | |
| 10 | Addition, N.S.F. correspondence, 1968 | |
| 11 | Addition, general correspondence, 1969 | |
| 12 | Addition, general correspondence, 1966-1968 | |
| 13 | Addition, Miller and Fiedler, architects, correspondence, July 1968 | |
| 55 | 1 | Additions, Miller and Fiedler, architects, contract and change orders, 1966 |
| 2 | Addition, diary inspection report, 1969, 1970 | |
| 3 | Addition, R. Redding Construction Company, correspondence, 1969 | |
| 4 | Addition, R. Redding Construction Company, contract,, payments, c.o.'s | |
| 5 | Addition, Warren, Lund, and Lund, Inc., correspondence | |
| 6 | Addition, Warren, Lund, and Lund, Inc., contract and change orders | |
| 7 | Addition, Spence Electric, correspondence | |
| 8 | Addition, Spence Electric, contract and change orders | |
| 9 | Addition, Kewaunee Technical Furniture Company, correspondence | |
| 10 | Addition, Kewaunee Technical Furniture Company, contract and change orders | |
| 11 | Additon, Miller and Fiedler, architects, correspondence, 1966 | |
| 12 | Cooling tower addition, C & S Builders, Inc., correspondence, 1966 | |
| 13 | Addition, Pittsburgh Testing Laboratory, concrete testing 1967 | |
| 14 | Cooling tower addition, C & S Builders, Inc., contracts and company, 1966 | |
| 15 | Rector building, 1962 | |
| 16 | Rejected bids, mechanical, addition | |
| 17 | Rejected bids, electrical, | |
| 18 | Rejected bids, general,addition | |
| 19 | Cooling tower addition, rejected bids, 1966 | |
| 20 | Addition, Industrial Builders, Inc., correspondence | |
| 56 | 1 | Addition, Industrial Builders, Inc., contract and change orders |
| 2 | Proposal for a Science Facilities Grant, 1967 | |
| 3 | Addition, cooling system, 1966 | |
| 4 | Addition | |
| Bldg #76 - Johnson Hall and Addition | ||
| 57 | 1 | Concrete test cylinders, WSU |
| 2 | Weekly statements of compliance, Warren, Little and Lund, 1959 | |
| 3 | Weekly statements of compliance, Johnson-Busboom-Rauh, 1959 | |
| 4 | Weekly statements of compliance, Electric Smith, 1959 | |
| 5 | Weekly statements of compliance, Metalab Equipment Co. | |
| 58 | 1 | Notes, problem areas, 1961 |
| 2 | T & M, 1960-1961 | |
| 3 | Computer center, January 1960-August 1960 | |
| 4 | General correspondence, 1955-1958 | |
| 5 | General correspondence, 1959-1963 | |
| 6 | General correspondence, Jones, Lovegren, Helms, and Jones, 1956-1957 | |
| 7 | General correspondence, Jones, Lovegren, Helms, and Jones, 1958-1959 | |
| 8 | General correspondence, Jones, Lovegren, Helms, and Jones, 1960-1962 | |
| 59 | 1 | Work progress reports (reports by Ross), Jones, Lovegren, Helms, and Jones, September 1959-June 1960 |
| 2 | Check list, 1960 | |
| 3 | Jones, Lovegren, Helms, and Jones, contract and change orders, 1951-1961 | |
| 4 | Johnson-Busboom-Rauh, general correspondence, 1958/1962 | |
| 5 | Plant Science Building | |
| 6 | Warren, Little, and Lund, Inc., general correspondence 1958/1962 | |
| 60 | 1 | Warren, Little, and Lund, Inc., contract and change orders, 1958/1961 |
| 2 | Warren, Little, and Lund, Inc., (site, sewer, and water), correspondence, contract, and c.o., 1958/1959 | |
| 3 | Electric Smith, Inc., general correspondence, 1958/1961 | |
| 4 | Electric Smith, Inc., contract and change orders, 1958/1961 | |
| 5 | Laboratory equipment, general correspondence, 1960-1961 | |
| 6 | Laboratory equipment, general correspondence, 1957-1959 | |
| 7 | Chairs and stools, 1960/1961 | |
| 8 | Jones, Lovegren, Helms, and Jones, general correspondence (lab equipment), 1958/1960 | |
| 61 | 1 | Jones, Lovegren, Helms, and Jones, (lab equipment), contract and change orders, 1957/1961 |
| 2 | B.F. Shearer Company (lab equipment-tablet arm chairs), contract and change orders, 1959/1961 | |
| 3 | Northern School Supply (lab equipment-tables), contract and change orders, 1959 | |
| 4 | Metalab Equipment Company (lab equipment and built-in equipment), contract and change orders, 1959/1961 | |
| 5 | B.F. Shearer Company (lab equipment-tablet arm chairs), 1959/1961 | |
| 6 | Northern School Supply Company (lab equipment tables), general correspondence, 1959/1960 | |
| 7 | Movable equipment, general correspondence, 1958 | |
| 8 | Metalab Equipment Comapny (lab equipment, built-in- equipment), general correspondence, 1959/1961 | |
| 9 | Ewen Construction Company (earth moving), correspondence, contract and c.o., 1958 | |
| 10 | Rejected bids, general, mechanical, and electrical, 1958 | |
| 11 | Rejected bids, laboratory equipment, 1958 | |
| 12 | Rejected bids, earth moving, 1958 | |
| 62 | 1 | Addition, budget |
| 2 | Addition, NSF application, 1965-1967 | |
| 3 | Addition, program statement, 1965 | |
| 4 | Addition, 1965-1967 | |
| 5 | Gayne L. Jones and Associates, corresondence, 1967 | |
| 6 | Gayne L. Jones and Associates, correspondence, 1965-1966 | |
| 7 | Gayne L. Jones and Associates, contract and change orders 1965 | |
| 8 | Gayne L. Jones and Associates, construction visit report | |
| 9 | Addition, R. Redding Construction Company, correspondence, 1967 | |
| 10 | Addition, R. Redding Construction Company, contract and change orders | |
| 11 | Concrete testing, addition | |
| 12 | Addition, rejected bids | |
| Bldg #77 - Incinerator Building | ||
| 63 | 1 | 1956-1958 |
| 2 | Kenneth W. Brooks, 1957-1958 | |
| 3 | Kenneth W. Brooks, contract, 1958-1959 | |
| 4 | Ruud Construction Company, contract, 1958 | |
| 5 | Ruud Construction, change orders, 1958 | |
| 6 | Goder, 1957-1958 | |
| 7 | Concrete testing, 1958 | |
| 8 | Bids, 1958 | |
| Bldg #78 - R.D. Sloan Hall | ||
| 64 | 1 | Budget, 1962-1963 |
| 2 | Engineering addition to Technology Building, proposed job file, 1958 | |
| 3 | Engineering addition, building program, 1957 | |
| 4 | Engineering addition, Culler, Gale, Martell, and Norrie, general correspondence, 1958-1959 | |
| 5 | Engineering addition to Technology Building, Culler, Gale, Martel, and Norrie, general correspondence, 1960 | |
| 6 | Culler, Gale, Martell, Norrie, and Davis, 1961-1964 | |
| 7 | Engineering addition, general correspondence, 1958-1959 | |
| 8 | Progress reports, 1960-1962 | |
| 9 | Completion, general correspondence, 1964 | |
| 10 | Culler, Gale, Martell, et. al., correspondence, 1964-1966 | |
| 11 | Engineering addition, Culler, Gale, Martell, and Norrie, contract and change orders, 1959/1962 | |
| 64 | 1 | Engineering addition, Purvis Construction Company, contract and change orders, 1960 |
| 2 | Engineering addition, Purvis Construction Company, general correspondence, 1960 | |
| 3 | Concrete cylinder testing, University of Idaho, engineering lab, 1960 | |
| 4 | Engineering addition, W.R. O'Rourke Co., Inc., general correspondence, 1960 | |
| 5 | Engineering addition, W.R. O'Rourke Co., Inc., contract and change orders, 1960 | |
| 6 | Engineering addition, Kehne-Crabtree, general correspondence, 1960 | |
| 7 | Engineering addition, Kehne-Crabtree, contract and change orders, 1960 | |
| 8 | Engineering addition, laboratory casework and equipment, general correspondence, 1960 | |
| 9 | Engineering addition, Hamilton Manufacturing Co., general correspondence, 1960 | |
| 10 | Engineering addition, Hamilton Manufacturing Co., contract and change orders, 1960 | |
| 11 | Rejected bids file and weekly statements of compliance are in top shelf of supply cabinet in print room ? | |
| 12 | Finish hardware schedule and key schedule | |
| 66 | 1 | Addition, budget |
| 2 | Building completion, HHFA, correspondence | |
| 3 | General correspondence, 1968 | |
| 4 | Engineering addition, general correspondence, 1960-1963 | |
| 5 | Addition, Culler, Gale, Martell, et. al., correspondence, 1966-1967 | |
| 6 | Building completion, Culler, Gale, Martell, et. al., contract and change orders | |
| 7 | Addition, C & S Builders, Inc., correspondence, 1966 | |
| 8 | Addition, C & S Builders, Inc., contract and change orders | |
| 9 | Addition, hardware file | |
| 10 | Addition, Bingham Mechanical and Metal Products, correspondence, 1966 | |
| 11 | Addition, Bingham Mechanical and Metal Products, contract and change orders | |
| 12 | Addition, Dillon Electric, correspondence, 1966 | |
| 13 | Addition, Washington Testing Laboratories, Inc., concrete testing and carres, 1966 | |
| 14 | Addition, Dillon Electric, contract and change orders | |
| 15 | Addition, furniture | |
| 16 | Addition, rejected bids, general construction, 1966 | |
| 17 | Addition, rejected bids, mechanical construction, 1966 | |
| 18 | Addition, rejected bids, electrical construction | |
| Bldg #79 - Gannon and Goldsworthy Halls | ||
| 67 | 1 | Hall rotunda, budget |
| 2 | HHFA material, 1961 | |
| 3 | HHFA materials, 1959 | |
| 4 | General correspondence, 1960 | |
| 5 | General correspondence, 1958-1959 | |
| 6 | Lea, Pearson, and Richards, 1961-1963 | |
| 7 | Lea, Pearson, and Richards, general correspondence, 1960 | |
| 68 | 1 | Lea, Pearson, and Richards, general correspondence, 1958-1959 |
| 2 | Lea, Pearson, and Richards, contract and change orders | |
| 3 | Washington Testing Labs, tests and correspondence, 1961 | |
| 4 | Washington Testing Lab, correspondence and contract and tests, 1959-1960 | |
| 5 | H. Halvorson, Inc., 1962 and 1964 | |
| 6 | H. Halvorson, Inc., 1961 | |
| 7 | H. Halvorson, Inc., general correspondence, general construction, 1960 | |
| 69 | 1 | H. Halvorson, Inc., "print approval" forms file, 1960 |
| 2 | H. Halvorson, Inc., contract and change orders, 1960 | |
| 3 | Landscaping, H. Halvorson, Inc., contract, change orders, and correspondence, 1961 | |
| 4 | Nelson Landscape Service contract, 1962 | |
| 5 | Finish hardware schedule, 1961 | |
| 6 | Soils and foundation investigation | |
| 7 | University of Idaho, cylinder tests, 1961 | |
| 8 | Concrete cylinder tests, University of Idaho Engineering Lab, 1960 | |
| 9 | Lent's Inc., general correspondence, 1960, mechanical | |
| 10 | Lent's Inc., contract and change orders, 1960 | |
| 70 | 1 | Electric Smith, Inc., general correspondence, electrical, 1960 |
| 2 | Electric Smith, Inc., contract and change orders, 1960 | |
| 3 | Kitchen and kitchen equipment general, 1959-1963 | |
| 4 | Atlas Sheet Metal Works, general correspondence, kitchen equipment, 1960-1962 | |
| 5 | Atlas Sheet Metal works, contract and change orders, 1960-1961 | |
| 6 | Built-in-furniture, general correspondence, 1960 | |
| 7 | Hilliard and Associates, Inc., general correspondence, built-in-furniture, 1960 | |
| 8 | Refrigeration section, Lea, Pearson, and Richards, A.I.A. | |
| 9 | Educators Manufacturing Company, general correspondence, built-in-furniture, 1960 | |
| 10 | Drapery track installation, general, 1961 | |
| 71 | 1 | Hilliard and Associates, Inc., interior furnishings, contract and change orders, 1960 |
| 2 | Educators Manufacturing Co., built-in-furniture, contract and change orders, 1960 | |
| 3 | Brown's furniture, contract and correspondence, 1961 | |
| 4 | Mattresses, general | |
| 5 | Sound Mattress and Felt Company, contract and correspondence, 1961 | |
| 6 | Interior furniture and furnishings, general, 1961 | |
| 7 | Spokane Dry Goods Company, contract and correspondence, 1961 | |
| 8 | Pictures, 1962 | |
| 9 | Rejected bids, general, 1960 | |
| 10 | Rejected bids, mechanical, 1960 | |
| 11 | Rejected bids, electrical, 1960 | |
| 12 | Rejected bids, kitchen equipment, 1960 | |
| 13 | Rejected bids, built-in-furniture, 1960 | |
| 14 | Rejected bids for interior furniture | |
| Bldg #81 - Streit-Perham Halls | ||
| 72 | 1 | Budget |
| 2 | HHFA material, 1961 | |
| 3 | HHFA material, 1959-1960 | |
| 4 | Walker, McGough, and Trogdon, general correspondence, 1958-1959 | |
| 5 | Walker, McGough, and Trogdon, general correspondence, 1960 | |
| 6 | General correspondence, 1959-1962-1964-1965-1966 | |
| 7 | Walker, McGough, and Trogdon, contract and change orders | |
| 8 | Walker and McGough, architects 1963 | |
| 9 | Inspector's progress reports, 1960 | |
| 10 | Walker and McGough, AIA, architects, 1961-1962 | |
| 73 | 1 | Balcony floor seal painting, general correspondence, 1963 |
| 2 | Johnson-Busboom-Rauh, correspondence, 1960 | |
| 3 | Warren, Little, and Lund, Inc., and Marque, correspondence, 1960 | |
| 4 | Pioneer Masonry Restoration Co., balcony floor seal painting, contract, change orders, and correspondence, 1963 | |
| 5 | Johnson-Busboom-Rauh, contract and change orders, 1960 | |
| 6 | Hardware schedule | |
| 7 | Washington Testing Laboratories | |
| 8 | Concrete cylinder testing, University of Idaho | |
| 9 | Warren, Little, and Lund, Inc., contract and change orders, 1960 | |
| 10 | Electric Smith, Inc. and Joe Doyle, correspondence, 1960 | |
| 74 | 1 | Electric Smith, Inc., contract and change orders, 1960 |
| 2 | Food Service Equipment, general, Walker, McGough, and Trogdon, general correspondence, 1960 | |
| 3 | Losli Sheet Metal Works, correspondence, 1960 | |
| 4 | Losli Sheet Metal Works, contract and change orders, 1960 | |
| 5 | Interior furnishing, general correspondence, 1960 | |
| 6 | Interior furnishings, Walker, McGough, and Trogdon, general correspondence, 1960 | |
| 7 | Interior furnishings, Walker, McGough, and Trogdon, 1960 | |
| 8 | Barclay and Brown, Inc., interior furnishings, contract and correspondence, 1962 | |
| 9 | Sound Mattress and Felt Co., contract and correspondence, 1962 | |
| 10 | Spokane Dry Goods Co., contract and correspondence, 1962 | |
| 11 | Frederich and Nelson, contract and correspondence, 1962 | |
| 12 | Rejected bids, 1960, general | |
| 13 | Rejected bids, mechanical, 1960 | |
| 14 | Rejected bids, electrical, 1960 | |
| 15 | Rejected bids, interior furnishings, 1962 | |
| 16 | Rejected bids, balcony floor seal painting, 1963 | |
| 17 | Rejected bids, 1960, food service equipment | |
| Bldg # 82 - Heald Hall | ||
| 75 | 1 | Budget |
| 2 | Building program and building committee | |
| 3 | General correspondence, 1962-1964 | |
| 4 | Growth rooms, general information, 1960 | |
| 5 | Hammel and Green, contract and correspondence, 1960 (growth room) | |
| 6 | General correspondence, 1960-1961 | |
| 7 | General correspondence, 1958-1959 | |
| 8 | High-light intensity cabinets, general correspondence, 1960 | |
| 9 | Work progress report, 1960 | |
| 76 | 1 | Longview Plumbing and Heating Company, general correspondence, 1960 |
| 2 | Longview Plumbing and Heating Company, contract and change orders | |
| 3 | Kehne-Crabtree Electric Company, Inc., general correspondence, 1960 | |
| 4 | Kehne-Crabtree Electric Company, Inc., contract and change orders | |
| 5 | Casework, general correspondence, lab equipment, 1960 | |
| 6 | Lab equipment, Decker, casework, general correspondence, 1960 | |
| 7 | Hamilton Manufacturing Company, lab equipment, general correspondence, 1960-1964 | |
| 8 | Hamilton Manufacturing Company, folder #2, contract and change orders | |
| 9 | Key schedule and finish hardware, 1961 | |
| 10 | Rejected bids, general | |
| 11 | Rejected bids, mechanical | |
| 12 | Rejected bids, electrical | |
| 13 | Casework rejected bids, lab equipment, May 24, 1960 | |
| 77 | 1 | Ralf E. Decker, AIA, architect, 1962 |
| 2 | Ralf E. Decker, AIA, architect, 1960 | |
| 3 | Ralf E. Decker, AIA, architect, 1958-1959 | |
| 4 | Ralf E. Decker, AIA, architect, 1961 | |
| 5 | Ralf E. Decker, AIA, architect contract | |
| 6 | Decker's conference notes, 1959 | |
| 7 | Henry George and Sons and Dunham Bros., general correspondence, 1960-1962 | |
| 8 | Henry George and Sons and Dunham Bros., contract and change orders | |
| 9 | Concrete cylinder testing, (U of I), 1960 | |
| Bldg #83 - Alan Rogers Hall | ||
| 78 | 1 | HHFA general, 1960, proposed men's tower |
| 2 | Budget | |
| 3 | General correspondence, 1960-1963 | |
| 4 | General correspondence, 1964 | |
| 5 | Lea, Pearson, and Richards, general correspondence, 1960-1961 | |
| 6 | Lea, Pearson, and Richards, corespondence, 1963-1964 | |
| 7 | Lea, Pearson, and Richards, general correspondence, 1962- | |
| 8 | Lea, Pearson, and Richards, contract and change orders | |
| 79 | 1 | Alcan Pacific Co., progress reports, 1962 |
| 2 | Alcan Pacific Co., contract and change orders, 1962, 1963, 1964 | |
| 3 | Foundation investigation | |
| 4 | Hardware | |
| 5 | Hardware | |
| 6 | Washington Testing Laboratories, 1962 | |
| 80 | 1 | Concrete testing (U of I), 1962 |
| 2 | Commercial Builders, Inc., core testing, 1962 | |
| 3 | Alcan Pacific Co., mechanical correspondence | |
| 4 | Alcan Pacific Co., electrical corresondence | |
| 5 | Interior design and furnishings, 1962 | |
| 6 | Coryell Berry, architect, contract and change orders, 1962 | |
| 7 | Spokane Dry Goods, furnishings, contract and correspondence | |
| 8 | Nelson Landscape Service, correspondence, 1962 | |
| 9 | Alcan-Pacific Co., correspondence, 1962-1964 | |
| 10 | Coryell Berry, architect, correspondence, 1962 | |
| 11 | Nelson Landscape, contract and change orders, 1962 | |
| 12 | HHFA project file, Rogers Hall--Kamiak Apartments | |
| 13 | Rejected bids, 1962 | |
| 14 | Rejected bids, landscaping, 1962 | |
| Bldg #84 - Safety Building | ||
| 81 | 1 | Budget 1962 |
| 2 | General correspondence, 1961 | |
| 3 | Lyerla and Peden, structural engineers, correspondence 1962 | |
| 4 | Doudna-Williams-Phipps, general correspondence, 1961 | |
| 5 | Senna Service, Inc., and Marque, correspondence, 1962 1963 | |
| 6 | Doudna-Williams-Phipps, general correspondence, 1962, 1963 | |
| 7 | Doudna-Williams-Phipps, contract and change orders | |
| 8 | Vern W. Johnson and Sons, Inc., correspondence, 1962- 1963 | |
| 9 | University of Idaho, concrete testing, 1962 | |
| 10 | Vern W. Johnson and Sons, Inc., contract and change orders, 1962 | |
| 11 | Finish hardware schedule | |
| 12 | Senna Service Inc., contract and change orders, 1962 | |
| 13 | Dillon Electric correspondence, 1962, 1963 | |
| 14 | Dillon Electric, contract and change orders, 1962 | |
| 15 | Rejected bids, general, April 1962 | |
| 16 | Rejected bids, mechanical, 1962 | |
| 17 | Rejected bids, electrical, 1962 | |
| Bldg #85 - James A. McCluskey Services Building | ||
| 82 | 1 | General, 1961-1964 |
| 2 | Progress reports, 1961, 1962 | |
| 3 | Victor Louis Wulff, general correspondence, 1963, 1964 | |
| 4 | Lyle Marque and Associates, consulting engineer correspondence, 1962-1963 | |
| 5 | V.W. Johnson and Sons, Inc., and T.R. Hance, correspondence, 1962-1967 | |
| 6 | Victor Louis Wulff, contract and change orders, 1961- 1964 | |
| 7 | Phase I, Vern W. Johnson and Sons, Inc., contract and change orders, 1962, 1963 | |
| 8 | Finish hardware schedule, 1962-1963 | |
| 9 | Washington Testing Laboratories, 1962, 1963 | |
| 10 | Phase I, University of Idaho testing, 1962 | |
| 11 | Warren, Little, and Lund, Inc., correspondence, 1962, 1963 | |
| 12 | Warren, Little, and Lund, Inc., contract and change orders, 1962, 1963 | |
| 13 | Dillon Electric and Mr. S. Perry, correspondence, 1962, 1963 | |
| 14 | Dillon Electric, contract and change orders, 1962-1963 | |
| 15 | Landscaping, general correspondence, 1963 | |
| 16 | Rejected bids, general, 1962 | |
| 17 | Rejected bids, mechanical, 1962 | |
| 18 | Rejected bids, electrical, 1962 | |
| 83 | 1 | Budget, 1962-1964 |
| 2 | General correspondence, 1963-1964 | |
| 3 | Phase 2, HHFA, general, 1962, 1963 | |
| 4 | Phase 2, Victor Louis Wulff, general correspondence, 1962-1964 | |
| 5 | Phase II, Purvis Construction Co., correspondence, 1963, 1964 | |
| 6 | Phase 2, hardware schedule, 1963 | |
| 7 | Phase 2, University of Idaho Testing, 1963 | |
| 8 | Phase II, Bingham Mech. and Metal Prod., Inc., and Marque, correspondence, 1963, 1964 | |
| 9 | Phase II, Purvis Construction Co., contract and change orders, 1963, 1964 | |
| 10 | Phase II, Bingham Mec. and Metal Prod., contract and change orders, 1963 | |
| 11 | Phase II, Power City Electric, Inc. | |
| 12 | Phase II, Power City electric Inc., contract and change orders, 1963 | |
| 13 | Phase II, rejected bids, general, 1963 | |
| 14 | Phase II, rejected bids, mechanical, 1963 | |
| 15 | Phase II, rejected bids, electrical, 1963 | |
| Bldg #86 - Alfred A. Cleveland Hall | ||
| 84 | 1 | General correspondence, 1958-1964 |
| 2 | Ralph H. Burkhard, architect, general correspondence, 1961 | |
| 3 | Ralph H. Burkhardt, architect, general correspondence, 1962 | |
| 4 | Sceva Construction Co., correspondence, 1962-1963 | |
| 5 | Ralph H. Burkhard, architect, contract and change orders, 1961-1964 | |
| 6 | Sceva Construction Co., contracts and change orders, 1962-1964 | |
| 7 | Ralph H. Burkhard, architect, general correspondence, 1963-1965 | |
| 85 | 1 | General construction rejected bids, 1962 |
| 2 | Mechanical construction rejected bids, 1962 | |
| 3 | Electrical construction rejected bids, 1962 | |
| 4 | Landscape work and sprinkler system, rejected bids, 1963 | |
| 5 | Education building program, 1962 | |
| 6 | Briggs Electric Co., Inc., contract and change orders, 1962-1964 | |
| 7 | Landscaping, general correspondence, 1963 | |
| 8 | Landscape design, contract, change orders, and correspondence, L. Keith Hellstrom, 1963 | |
| 9 | Landscape work and sprinkler system, Nelson Landscape Service, contract, change orders, and correspondence, 1963 | |
| 10 | Warren, Little, and Lund, Inc., contract and change orders, 1963 | |
| 11 | Briggs Electric Co., Inc., correspondence, 1962 | |
| 12 | Finish hardware, 1962-1963 | |
| 13 | Warren, Little, and Lund, Inc., correspondence, 1962 | |
| 86 | 1 | Budget, 1962-1963 |
| 2 | Addition, budget, 1967-1968 | |
| 3 | Addition, general correspondence, 1966 | |
| 4 | Addition, DHEW correspondence, 1968-1969 | |
| 5 | Addition, program statement, November 17, 1965 | |
| 6 | Addition, Department of Housing and Urban Development, general correspondence, 1967 | |
| 7 | Ventilation openings, 1973 | |
| 8 | Addition, Ralph Burkhard, architect correspondence, 1967 | |
| 9 | Addition, Ralph Burkhard, architect correspondence, 1968 | |
| 10 | Addition, Ralph Burkhard, architect contract and change orders, 1966 | |
| 87 | 1 | Addition, rejected bids, electrical, 1967 |
| 2 | Addition, rejected bids, mechanical, 1967 | |
| 3 | Addition, rejected bids, general, 1967 | |
| 4 | Addition, Dillon Electric Co., Inc., contract and change orders, 1967-1968 | |
| 5 | Dillon Electric Co., correspondence, 1967-1968 | |
| 6 | Bingham Mechanical and Metal, contract and change orders, 1967-1968 | |
| 7 | Addition, Bingham Mechanical and Metal Prod., correspondence, 1967-1969 | |
| 8 | Washington Testing Laboratories, 1962-1963 | |
| 9 | University of Idaho, concrete testing, 1962-1963 | |
| 10 | Concrete testing, 1967-1968 | |
| 11 | Ralph Burkhard, architect inspection reports, 1967-1968 | |
| 12 | C & S Builders Inc., contract and change orders, 1967-1968 | |
| 13 | C & S Builders Inc., correspondence, 1967-1968 | |
| Bldg #87 - Rogers-Orton Hall | ||
| 88 | 1 | Dining facility, HHFA project, 1962-1965 |
| 2 | HHFA project file, 1962-1965 | |
| 3 | Budget, 1962-1965 | |
| 4 | Leaky window correspondence, 1964-1971 | |
| 5 | General correspondence, 1961-1965 | |
| 6 | Lea, Pearson, and Richards, (and Boque), general correspondence, 1964 | |
| 7 | Lea, Pearson, and Richards, general correspondence, 1963 | |
| 8 | Lea, Pearson, and Richards, general correspondence, 1961-1962 | |
| 9 | Lea, Pearson, and Richards, contract and change orders, 1962-1965 | |
| 89 | 1 | University of Idaho Testing Lab, concrete tests, 1963 |
| 2 | Washington Testing Laboratories, soil investigation, 1962 | |
| 3 | United Paving Company, Inc., concrete curb and gutter, contract and change orders, 1964 | |
| 4 | H. Halvorson, Inc., contract and change orders, 1963 | |
| 5 | Concrete curb and gutter, United Paving Company, Inc., correspondence, and general correspondence, 1964 | |
| 6 | Finish hardware schedule | |
| 7 | H. Halverson, Inc., correspondence, 1963 | |
| 8 | H. Halverson, Inc., correspondence, 1964 | |
| 90 | 1 | Furnishings, Spokane Dry Goods Co., correspondence, 1964 |
| 2 | Furnishings, Lea, Pearson, and Richards, contract and change orders, 1964 | |
| 3 | Furnishings, Lea, Pearson, and Richards, and Coryell Berry, corresondence | |
| 4 | Interior furnishings, general correspondence, 1962 | |
| 5 | H. Halvorson, Inc., electrical correspondence, 1963- 1964 | |
| 6 | H. Halvorson, Inc., mechanical correspondence, 1963- 1964 | |
| 7 | Furnishings, Sound Mattress and Felt Co., contract and change orders, 1963-1964 | |
| 8 | Furnishings, Sound Mattress and Felt Co., correspondence, 1964 | |
| 9 | Spokane Dry Goods Co., contract and change orders, 1964 | |
| 10 | Dining hall, Nelson Landscape Services, contract and change orders, 1963 | |
| 11 | Nelson Landscape Services, general correspondence, 1963 | |
| 12 | Doces Wholesale Contract, Inc., contract and change orders, 1964 | |
| 13 | Doces Wholesale Contract, Inc., correspondence, 1964 | |
| 14 | Lent's Inc., contract and correspondence, 1964-1965 | |
| 15 | Rejected bids, general, 1963 | |
| 16 | Rejected bids, lump sum contract, 1963 | |
| 17 | Rejected bids, furnishings, 1964 | |
| 91 | 1 | Dining hall, Kenneth Brooks, contract and changeorders, 1962-1965 |
| 2 | Dining hall, Lea, Pearson, and Richards, correspondence, 1963 | |
| 3 | Dining hall, Lyle Marque and Associates, mechanical consultants and correspondence, 1962-1963 | |
| 4 | Dining Hall, Laschober, Pinckard, and Sovich, food facilities consultants, 1962-1963 | |
| 5 | Budget, 1962-1965 | |
| 6 | Dining hall, HHFA project file, 1959-1963 | |
| 7 | Dining hall, HHFA project file, 1962-1965 | |
| 8 | Dining hall, general correspondence, 1962-1965 | |
| 9 | Dining hall, Kenneth Brooks, architect, correspondence, 1964-1965 | |
| 10 | Dining hall, Kenneth Brooks, general correspondence, 1963 | |
| 11 | Dining hall, Ken Brooks and Marque, general correspondence, 1961-1962 | |
| 92 | 1 | Dining hall, H. Halverson, Inc., correspondence, 1963-1965 |
| 2 | Dining hall, finish hardware schedule, 1962-1964 | |
| 3 | Dining hall, Washington Testing Laboratories, 1962 | |
| 4 | Dining hall, cost analysis, January 22, 1963 | |
| 5 | Dining hall, University of Idaho Testing Lab, concrete tests, 1963 | |
| 6 | Dining hall, H. Halvorson, Inc., mechanical correspondence, 1963 | |
| 7 | Dining hall, W.R. O'Rourke Co., Inc., contract, 1964 | |
| 8 | Dining hall, H. Halvorson, Inc., contract and change orders, 1963-1964 | |
| 9 | Dining hall, Electro-Kold Co., Inc., contract and correspondence, 1965 | |
| 10 | Dining hall, H. Halvorson, Inc., electrical correspondence, 1963 | |
| 11 | Dining hall, Electric Smith construction and Equipment Company, contract and correspondence, 1964 | |
| 12 | Dining hall, kitchen equipment, general, Ken Brooks, 1962-1963 | |
| 13 | Dining hall, Atlas Sheet Metal Co., correspondence, 1963 | |
| 93 | 1 | Rejected bids, artwork, mounting, and installation, 1965 |
| 2 | Rejected bids, combined landscaping, 1963 | |
| 3 | Rejected bids, kitchen equipment, 1963 | |
| 4 | Rejected bids, furnishings, 1964 | |
| 5 | Rejected bids, 1963 | |
| 6 | Artwork framing, mounting, and installation, Spokane Glass Co., contract and change orders and correspondence, 1965 | |
| 7 | Spokane Dry Goods Co., 1964, contract and change orders | |
| 8 | Atlas Sheet Metal Co., kitchen equipment, contract, and change orders, 1963-1965 | |
| 9 | Doces Wholesale Contract, Inc., contract and change orders, 1964-1965 | |
| 10 | Doces Wholesale Contract, Inc., correspondence, 1964 | |
| 11 | Baxter Company, contract and change orders, 1964 | |
| 12 | Baxter Company, correspondence, 1964 | |
| 13 | Kenneth W. Brooks, contract and change orders, 1963-1965 | |
| 14 | Furnishings and general correspondence, Kenneth Brooks correspondence, 1963-1966 | |
| 15 | Spokane Dry Goods Company, correspondence, 1964 | |
| Bldg #89 - Food Service Building | ||
| 94 | 1 | Budget |
| 2 | HHFA, general correspondence, 1962-1965 | |
| 3 | General correspondence, 1961-1966 | |
| 4 | Inspection and progress reports | |
| 5 | Culler, Gale, and Martell, etc., general correspondence, 1962 | |
| 6 | Culler, Gale, and Martell, etc., general correspondence, 1964-1965 | |
| 7 | Purvis Construction Company, correspondence, 1963-1964-1965 | |
| 8 | Culler, Gale, and Martell, etc., contract and change orders | |
| 95 | 1 | Finish hardware schedule |
| 2 | Washington Testing Laboratories, 1962 | |
| 3 | University of Idaho Testing Lab, concrete tests, 1963 | |
| 4 | W.R. O'Rourke Co., Inc., correspondence, 1963 | |
| 5 | Purvis Construction Company, contract and change orders | |
| 6 | W.R. O'Rourke Co., Inc., contract and change orders | |
| 7 | Kehne-Crabtree Electric Co., Inc., correspondence, 1963 | |
| 8 | Kehne-Crabtree Electric Co., Inc., contract and change orders | |
| 9 | Landscaping, general correspondence, 1964 | |
| 10 | Landscape design, Robert L. Woerner, L.A., correspondence, 1964 | |
| 11 | Landscape design, Robert L. Woerner, L.A., contract and change orders, 1964 | |
| 12 | Sprinkler irrigation system landscaping, Nelson Landscape Service, correspondence, 1964 | |
| 13 | Sprinkler irrigation system and landscaping, Nelson Landscape Service, contract and change orders, 1964 | |
| 14 | Affidavit of wages paid, Nelson Landscape Service, 1964 | |
| 15 | Rejected bids, general, 1962 | |
| 16 | Rejected bids, mechanical, 1963 | |
| 17 | Rejected bids, electrical, 1963 | |
| 18 | Rejected bids, landscaping, 1964 | |
| Bldg #90 - Comparative Behavior Laboratory | ||
| 96 | 1 | Budget |
| 2 | N.I.H. | |
| 3 | DHEW correspondence | |
| 4 | General correspondence, 1962, 1963, 1964 | |
| 5 | E.W. Molander and Associates, correspondence, 1962 | |
| 6 | E.W. Molander and Associates, contract and change orders, 1963 | |
| 7 | Emmett Nelson, Inc., correspondence, 1963 | |
| 8 | Emmett Nelson, Inc., contract and change orders, 1963 | |
| 9 | Emmett Nelson, Inc., concrete work contract, change orders and correspondence, 1964 | |
| 10 | Finish hardware schedule | |
| 11 | Lent's, Inc., correspondence, 1963 | |
| 12 | Lent's, Inc., contract and change orders, 1963 | |
| 97 | 1 | Kehne-Crabtree Electric Co., correspondence, 1963 |
| 2 | Kehne-Crabtree Electric Co., contract and change orders, 1963 | |
| 3 | Weekly statements of compliance, Emmett Nelson, Inc. August 1963- | |
| 4 | Weekly statements of compliance, Lent's Inc., August 1963 | |
| 5 | Weekly statements of compliance, Kehne-Crabtree Electric Co., Inc., August 1963 | |
| 6 | Rejected bids, 1963, general | |
| 7 | Rejected bids, 1963, mechanical | |
| 8 | Rejected bids, 1963, electrical | |
| 9 | HHFA, 1963 | |
| Bldg #91 - Publications Building | ||
| 98 | 1 | Budget |
| 2 | HHFA, general, 1962 | |
| 3 | Publications and Agr. Exten., general correspondence, 1962 | |
| 4 | Publications and Agr. Exten., Evanoff and Kabush, correspondence, 1962 | |
| 5 | Publications and Agr. Exten., Evanoff and Kabush, correspondence, 1964 | |
| 6 | Publications and Agr. Exten., Evanoff and Kabush, contract and change orders, 1962 | |
| 7 | Purvis Construction Company, correspondence, 1963 | |
| 8 | Hardware schedule, 1963 | |
| 9 | Washington Testing Laboratories, 1963 | |
| 10 | University of Idaho Testing Lab, concrete testing, 1963 | |
| 11 | Warren, Little, and Lund, Inc., correspondence, 1963 | |
| 12 | Warren, Little, and Lund, Inc., contract and change orders, 1963 | |
| 13 | Purvis Construction Co., contract and change orders, 1963 | |
| 14 | Kehne-Crabtree Electric Co., correspondence, 1963 | |
| 15 | Kehne-Crabtree Electric Co., contract and change orders, 1963 | |
| 16 | Nelson Landscape Service, contract, change orders and correspondence, 1963 | |
| 17 | Publications Building | |
| 18 | Rejected bids, general, 1963 | |
| 19 | Rejected bids, mechanical, 1963 | |
| 20 | Rejected bids, electrical, 1963 | |
| Bldg #93 - Stephenson Residence Center | ||
| 99 | 1 | Phase I, budget |
| 2 | Correspondence, 1966, progress schedules, 1965- | |
| 3 | Correspondence, 1964, 1965 | |
| 4 | Residence Hall--Stadium Way & Moscow Hwy., general correspondence | |
| 5 | S. Town Stephenson Residence Center, general correspondence, 1965 | |
| 6 | S. Town Stephenson Residence Center general correspondence, 1966 | |
| 7 | S. Town Stephenson Residence Center Walker and McCough, architects, correspondence, 1966 | |
| 100 | 1 | S. Town Stephenson Residence Center Walker and McGough, architects, contract change orders |
| 2 | Color schedule | |
| 3 | Progress reports and DHUD transmittal letters, Walker and McGough, 1966 | |
| 4 | Report on foundation investigation coeducational residence hall, Washington State University, October 2, 1964, by Shannon & Wilson, Inc., Soil Mechanics & Foundatiion Engineers, Seattle, Washington | |
| 5 | Hardware schedule for co-educational residence halls, Washington State University, Pullman, Washington, Mansu Materials, Inc. | |
| 6 | S. Town Stephenson Residence Center Laschober, Pinckard, & Sovich, Inc., kitchen consultant | |
| 7 | S. Town Stephenson Residence Center Lyle E. Marque & Associates, consultants, and J.M. Doyle & Associates | |
| 8 | Max J. Kuney Company, correspondence, 1965-1966 | |
| 9 | Max J. Kuney Company, contract and change orders | |
| 10 | Finish hardware | |
| 11 | S. Town Stephenson Residence Center Shannon & Wilson, Inc., correspondence, contract, and change orders | |
| 12 | Washington Testing Laboratories, concrete testing, 1966 | |
| 101 | 1 | Warren, Little, & Lund, Inc., correspondence, 1965 |
| 2 | Warren, Little, & Lund, Inc., contract and change orders | |
| 3 | Kehne-Crabtree Electric Co., Inc., correspondence, 1965 | |
| 4 | Kehne-Crabtee Electric Co., Inc., contract and change orders | |
| 5 | S. Town Stephenson Residence Center kitchen equipment, general correspondence, and Walker & McGough correspondence | |
| 6 | Losli, Inc., correspondence, 1965 | |
| 7 | Kitchen equipment, Losli, Inc., contract and change orders | |
| 8 | S. Town Stephenson Residence Center furnishings, Walker & McGough, architects, correspondence, and general correspondence | |
| 9 | Furnishings, Walker & McGough, architects, contract and change orders | |
| 102 | 1 | S. Town Stephenson Residence Center, Spokane Dry Goods, correspondence, 1966 |
| 2 | S. Town Stephenson Residence Center, Spokane Dry Goods, contract and change orders, 1966 | |
| 3 | Caisson Settlement, correspondence | |
| 4 | Landscape construction, Nelson Landscape Service, Inc., contract and change orders | |
| 5 | Landscape construction, Nelson Landscape Service, Inc., correspondence, 1965 | |
| 6 | S. Town Stephenson Residence Center rejected bids, 1965 | |
| 7 | S. Town Stephenson Residence Center rejected bids, mechanical construction, 1965 | |
| 8 | S. Town Stephenson Residence Center rejected bids, electrical construction, 1965 | |
| 9 | S. Town Stephenson Residence Center rejected bids, kitchen equipment,landscape construction, 1965 | |
| 10 | Residence hall--Stadium Way & Moscow Hwy., correspondence, Walker & McGough, architects | |
| 11 | Washington Testing Laboratories, concrete testing, 1965 | |
| 103 | 1 | S. Town Stephenson Residence Center Walker & McGough, architects, correspondence, January-April 1965 |
| 2 | S. Town Stephenson Residence Center Walker & McGough, architects, correspondence, May 1965-December 1965 | |
| 3 | Progress reports, Walker & McGough, 1965 | |
| 4 | Daily report of exploration by Shannon and Wilson, Inc., 1105 North 38th, Seattle, Washington | |
| Bldg #94 - Johnson Tower | ||
| 104 | 1 | Budget |
| 2 | Program Notes | |
| 3 | NSF grant application, and correspondence | |
| 4 | Drawings of the tower | |
| 5 | General correspondence, 1962, 1963, 1964 | |
| 6 | General correspondence, 1965, 1966, 1967, 1968 | |
| 7 | John W. Maloney, architect, correspondence, 1962, 1963, 1964 | |
| 8 | Maloney, Herrington, Freesz, & Lund, correspondence, 1966, 1967 | |
| 105 | 1 | Maloney, Herrington, Freesz, & Lund, correspondence, 1965 |
| 2 | John W. Maloney, architect, contract and change orders | |
| 3 | Paint schedule | |
| 4 | Bouillon, Christofferson, and Schaier, correspondence, 1964, 1965, 1966 | |
| 5 | Architectural reports, 1965-1966 | |
| 6 | Vern W. Johnson & Sons, Inc., correspondence, 1966, 1967 | |
| 7 | Vern W. Johnson & Sons, Inc., correspondence, 1965 | |
| 8 | Vern W. Johnson & Sons, Inc., contract and change orders, 1965 | |
| 9 | Miscellaneous casework, general correspondence, and Vern W. Johnson & Sons, Inc., 1965 | |
| 10 | Finish hardware | |
| 11 | Misc. casework, Vern W. Johnson & Sons, Inc., contract and change orders, 1965 | |
| 12 | Testing, soil, general correspondence, 1964 | |
| 13 | Concrete testing, Washington Testing Laboratories, 1965 | |
| 106 | 1 | Bingham Mechanical & Metal Products, Inc., correspondence, 1965 |
| 2 | Bingham Mechanical & Metal Products, Inc., contract and change orders, 1965 | |
| 3 | Electric Smith Construction & Equipment Company, correspondence, 1965, 1966 | |
| 4 | Electric Smith Construction & Equipment Company, contract and change orders, 1965 | |
| 5 | Affidavit of wages paid and statement of compliance, Johnson & Sons, Inc. | |
| 6 | Affidavit of wages paid, Electric Smith Construction & Equipment | |
| 7 | Affidavit of wages paid, Bingham Mechanical & Metal Products | |
| 8 | HHFA | |
| 9 | Testing, soil, Washington Testing Laboratories, Inc., contract and correspondence, 1964 | |
| 10 | Furniture 1966 | |
| 11 | Landscape work and sprinkler system, general correspondence and MHF & L and Robert Woerner, landscape architect | |
| 12 | West Coast Landscape Company, correspondence, 1965 | |
| 13 | West Coast Landscape Company, contract and change orders, 1965 | |
| 14 | Rejected bids, general construction, 1965 | |
| 15 | Rejected bids, mechanical construction, 1965 | |
| 16 | Rejected bids, electrical construction, 1965 | |
| 17 | Rejected bids, landscaping, 1965 | |
| Bldg #95 - Wood Technology Building | ||
| 107 | 1 | Budget |
| 2 | Program information | |
| 3 | General correspondence, 1965, 1966 | |
| 4 | Conference notes | |
| 5 | Kenneth W. Brooks, correspondence, 1965 | |
| 6 | Kenneth W. Brooks, correspondence, 1966 | |
| 7 | Kenneth W. Brooks, contract and change orders, 1965 | |
| Bldg #96 - Physical Education Building | ||
| 8 | Structural calculations | |
| Bldg #98 - Meats laboratory | ||
| 108 | 1 | Budget |
| 2 | Program | |
| 3 | Letter report, Barnard and Holloway, architects, Washington State University, Pullman, Washington, proposed meats laboratory, soils and foundation investigation, October 20, 1967 | |
| 4 | General correspondence, 1965, 1966, 1967, 1968 | |
| 5 | Barnard & Holloway, architects, correspondence, 1966, 1967, 1968, 1969, 1970 | |
| 6 | Barnard & Holloway, architects, contract and change orders | |
| 7 | Progress and insp. report, Barnard & Holloway, architects, 1968 | |
| 8 | C & S Builders, correspondence, 1968 | |
| 9 | C & S Builders, contract and change orders | |
| 10 | Concrete testing | |
| 11 | Rejected bids | |
| Bldg #114C - Plant Sciences Greenhouses | ||
| 109 | 1 | General, growth control building (1959) |
| 2 | C & S Builders, general correspondence, growth control building, (1959-1960) | |
| 3 | C & S Builders, contract and change orders, growth control building, (1959-1960) | |
| 4 | Growth control chamber, rejected bids, 1959 | |
| 5 | Growth control building, extension, general correspondence, 1961-1962, addition | |
| 6 | Growth control building, C & S Builders, Inc., contract, change orders, correspondence, 1962 addition | |
| 7 | Growth control building, rejected bids, 1962 addition | |
| 8 | Budget | |
| 9 | USDA addition to agronomy greenhouse, general correspondence, 1965 | |
| 10 | General correspondence, 1964 | |
| 11 | Kendall M. Wood & Associates, correspondence, 1964 | |
| 12 | Kendall M. Wood & Associates, consulting mechanical engineers, contract, change orders, 1964 | |
| 13 | C & S Builders, Inc., correspondence, 1964 | |
| 14 | C & S Builders, Inc., contract and change orders, 1964 | |
| 15 | Warren, Little, & Lund, Inc., correspondence, 1964 | |
| 16 | Warren, Little, & Lund, Inc., contract and change orders, 1964 | |
| 17 | Dillon Electric, correspondence, 1964 | |
| 18 | Dillon Electric, contract and change orders, 1964 | |
| 19 | Rejected bids, general construction | |
| 20 | Rejected bids, mechanical construction | |
| 21 | Rejected bids, electrical construction | |
| 22 | 1954-1956 | |
| Bldg #115 - Seed House | ||
| 110 | 1 | 1955-1957 |
| 2 | Y & G Construction Company, 1955-1956 | |
| 3 | Lawrence G. Evanoff, architect, 1955-1956 | |
| 4 | Y & G Construction Company, contract, 1955-1956 | |
| 5 | Addition, general, 1957-1958 | |
| 6 | Lawrence Evanoff, general, 1957-1958 | |
| 7 | Lawrence G. Evanoff, contract, 1957-1958 | |
| 8 | Warner & Brown, contract, 1957-1958 | |
| 9 | Change orders, Warner & Brown, 1957-1958 | |
| 10 | Bids, 1957 | |
| 11 | Kenneth Custis, seed handling equipment, contract and correspondence, 1958 | |
| 12 | Lyle Campbell, seed handling equipment, 1958 | |
| 13 | Bids, seed handling equipment, 1958 | |
| Bldg #116 - Pathology Field Shed # 1 | ||
| 111 | 1 | Dix Steele Co., contract and correspondence, 1956 |
| Bldg #117 - Plant Pathology Field Shed # 2 | ||
| 2 | General, 1960-1961 | |
| 3 | Sceva, contract and correspondence, 1961 | |
| 4 | Rejected bids, March 10, 1961 | |
| Bldg #119 - Horticulture Research Greenhouse | ||
| 5 | Budget, insect-disease breeding lab, September 1965- December 1967 | |
| 6 | General correspondence, insect-disease breeding lab, 1965-1968 | |
| 7 | Kendall M. Wood & Associates, consulting mechanical and electrical engineers, correspondence, 1965-1966 | |
| 8 | Kendall M. Wood & Associates, consulting mechanical and electrical engineers, contract and change orders, 1965-1967 | |
| 9 | Insect-disease breeding lab, C & S Builders, correspondence, 1966-1967 | |
| 10 | Insect-disease breeding lab, C & S Builders, contract and change orders, 1966-1967 | |
| 11 | Insect-disease breeding lab, Bingham Mechanical & Metal Products, correspondence, 1966 | |
| 12 | Insect-disease breeding lab, Bingham Mechanical & Metal Products, contract and change orders, 1966-1967 | |
| 13 | Insect-disease breeding lab, Electric Smith Construction and Equipment, correspondence, 1966-1967 | |
| 14 | Insect-disease breeding lab, Electric Smith Construction and Equipment, contract and change orders, 1966-1967 | |
| 15 | Insect-disease breeding lab, rejected bids, general construction, 1966 | |
| 16 | Insect-disease breeding lab, rejected bids, mechanical construction, 1966 | |
| 17 | Insect-disease breeding lab, rejected bids, electrical construction, 1966 | |
| Bldg #120 - Carver Poultry Lab | ||
| 112 | 1 | Funk, Molander & Johnson, 1948-1953 |
| 2 | Poultry disease, 1947 | |
| 3 | Poultry shelter, Johnson, contractor, 1954 | |
| 4 | Poultry plant, general, 1957-1959 | |
| 5 | Funk, Murray and Johnson, general, 1957-1959 | |
| 6 | Funk, Murray and Johnson, contract, a poultry plant, 1957-1959 | |
| 7 | Johnson-Busboom-Rauh, poultry plant, general, 1958-1959 | |
| 8 | Johnson-Busboom-Rauh, contract | |
| 9 | Change orders, Johnson-Busboom-Rauh, poultry plant | |
| 10 | Stewart Construction, contract, 1958-1959 | |
| 11 | Change orders, Stewart Construction, 1958-1959 | |
| 12 | Bids, February 1958 | |
| 13 | Addition bids, September 1958 | |
| 14 | Pheasant pens, 1956-1958 | |
| 15 | Bids, poultry plant residence, 1957 | |
| 113 | 1 | 1946-1947 |
| 2 | Poultry laying house, 1951-1953 | |
| Bldg #141 - Beef Cattle Buildings | ||
| 3 | Agricultural lab (College farm), 1945-1947 | |
| 4 | Cattle breeding shed, 1948-1949 | |
| 5 | H.C. Hollingsworth, re-erection of Farragut Buildings | |
| 6 | Budget | |
| 7 | General correspondence and testing, 1965 | |
| 8 | Hahn & Campbell correspondence and contract, consulting engineers | |
| 9 | Sceva Construction Company, correspondence, 1965 | |
| 10 | Rejected bids, 1965 | |
| 11 | Sceva Construction Company, contract and change orders, 1965 | |
| Bldg #142 - Swine Buildings | ||
| 114 | 1 | Swine and Sheep, 1946-1948 |
| 2 | Swine farrowing barn | |
| 3 | Rabbit laboratory addition to the swine barn | |
| 4 | Rabbit laboratory addition to the swine barn, general correspondence, 1963 | |
| 5 | Swine shelters, general correspondence, 1962 | |
| 6 | Rabbit lab addition to swine barn, Walter M. Varnum, weekly statement of compliance | |
| 7 | Two swine sheds, Bestway Building Center, correspondence, 1962 | |
| 8 | Two swine sheds, Bestway Building Center, contract and change orders, 1962 | |
| 9 | Rabbit lab addition to swine barn, Walter M. Varnum, contract, change orders, and correspondence | |
| 10 | Swine barn addition, 1958, 1959 | |
| 11 | Addition to swine barn, 1957-1959 | |
| 12 | Warner and Brown, contractors, swine barn, 1957-1958 | |
| 13 | Swine barn bids | |
| 14 | Rabbit lab addition to swine barn, rejected bids | |
| 15 | Two swine sheds, rejected bids, 1962 | |
| Bldgs #142-143 - Swine Buildings and Swine Barn | ||
| 16 | Quonset | |
| Bldg #143 - Swine Barn | ||
| 17 | Sheep shed | |
| Bldg #144 - Cattle Feeding Laboratory | ||
| 115 | 1 | 1953-1957 |
| 2 | Accounting | |
| 3 | Payroll | |
| 4 | Sawdust storage building, general correspondence, 1960-1962 | |
| 5 | Sawdust storage building, rejected bids, March 3, 1961 | |
| 6 | Sawdust storage building, Booth Equipment & Storage Co., contract and correspondence, 1961-1962 | |
| Bldg #145 - Cattle Laboratory Annex | ||
| 7 | General correspondence | |
| 8 | Contract | |
| 9 | Bids, 1958 | |
| Bldg #146 - Self-Feeding Cattle Barn | ||
| 116 | 1 | General, 1957- |
| 2 | C & S Builders, general correspondence and contract and change orders, 1960 | |
| 3 | Rejected bids, September 9, 1960 | |
| Bldg #150 - Stock Judging Pavilion | ||
| 4 | 1951-1952 | |
| Bldg #162 - Veterinary Research Barn | ||
| 5 | Ag. Building Program, 1949-1951 | |
| 6 | Dairy Plant, 1947-1949 | |
| Bldg #165 - Veterinary Quonsets | ||
| 7 | Dairy Group, 1953-1954 | |
| Bldg #167 - Carnivore Infectious Disease Building | ||
| 8 | Budget | |
| 9 | General correspondence, 1962-1964 | |
| 10 | Walter M. Varnum, correspondence, 1963-1964 | |
| 11 | Walter M. Varnum, contract and change orders, 1963-1964 | |
| 12 | Walter M. Varnum, weekly statements of compliance, 1963 | |
| 13 | Rejected bids, June 1963 | |
| 14 | Rejected bids, August 1963 | |
| Bldg #168 - C.E.R.D. Warehouse | ||
| 117 | 1 | Industrial Research Warehouse, general correspondence, 1959-196- |
| 2 | Industrial Research Warehouse, Gemaco Builders, Inc., correspondence and contract, 1960 | |
| 3 | Industrial Research Warehouse, rejected bids, 1960 | |
| Bldg #170 - Riedesel Pavement Test Track | ||
| 4 | General correspondence, 1963 | |
| 5 | C & S Builders, Inc., contract, change orders, and correspondence, 1963, 1965 | |
| 6 | Rejected bids, 1963-1964 | |
| Bldg #180 - Steffen Center | ||
| 7 | Forestry and Range Management Building, budget | |
| 8 | Forestry and Range Management building, general correspondence, 1964 | |
| 9 | Forestry Nursery Office & Equipment Building, general correspondence, 1963 | |
| 10 | Forestry & Range Management Building, Sceva Construction Company, correspondence | |
| 11 | Forestry & Range Management Building, Sceva Construction Company, contract and change orders, 1964 | |
| 12 | Rejected bids, Forestry & Range Management Building, 1964 | |
| Bldg #183 - Botany Field Laboratory | ||
| 13 | Forestry Equipment Building, 1948-1949 | |
| 14 | Forestry Building, 1947-1948 | |
| Bldg #190 - Graham Farm | ||
| 15 | Henry Bacon Co. contract, purchase, demounting, and moving of Farragut Buildings, to Pullman, Washington | |
| 16 | Graham Farm House, 1945-1947 | |
| Bldg #192 - Fur Animal Buildings | ||
| 17 | Fur animal farm, mink shed, virus farm | |
| 18 | Fur farm cold storage building | |
| Bldg #194 - Aviary Buildings | ||
| 19 | Honey house, 1950-1951 | |
| Bldg #195 - U.S.D.A. Soil Conservation Service Nursery | ||
| 20 | Butler building foundation, soil conservation nursery | |
| 21 | Metal storage building, regional plant introduction center | |
| Bldg #311 - Butch's Cage | ||
| 118 | 1 | 1949-1950 |
| Bldg #360 - Central Stores and Addition | ||
| 2 | Properties, 1946-1947 | |
| 3 | Central receiving quonset, an addition to the central stoves warehouse, 1954 | |
| 4 | General, 1959 | |
| 5 | Central stores completion, general correspondence, 1959- | |
| 6 | Johnson-Busboom-Rauh, general correspondence, 1959 | |
| 7 | Johnson-Busboom-Rauh, contract and change orders | |
| 8 | Johnson-Busboom-Rauh, general correspondence, 1959- | |
| 9 | Central stores completion, Johnson-Busboom-Rauh, contract 1959- | |
| 10 | Rejected bids | |
| 11 | Rejected bids, 1959 | |
| Bldg #363 - Central Feed Mixing Plant | ||
| 12 | Central feed processing, 1948-1952 | |
| 13 | Storage building, general correspondence, 1961 | |
| 14 | Storage building, Sceva Construction, contract and change orders and correspondence | |
| 15 | Storage building, rejected bids, October 2, 1961 | |
| 16 | Central feed mixing plant | |
| Bldg #370 - Agricultural Engineering Storage | ||
| 17 | Agricultural Engineering Storage | |
| Bldg #401 - Spillman Agronomy Farm Storage Buildings | ||
| 119 | 1 | Agronomy farm, Haskins & AF 1, 2, and 3, general machinery |
| 2 | General correspondence, 1963 | |
| 3 | General correspondence, 1961 | |
| 4 | Sceva Construction, contract and general correspondence, 1961 | |
| 5 | Haskins Co., Inc., contract, change orders, and correspondence | |
| 6 | Rejected bids, September 19, 1961 | |
| 7 | Rejected bids, 1963 | |
| Bldg #402 - Dairy Plant Buildings | ||
| 120 | 1 | Knott's Dairy, "A Trench Silo For The Dairy Plant," silage storage facility, October 1960- |
| 2 | General (1955-1959) | |
| 3 | George M. Rasque & Son | |
| 4 | Communications | |
| 5 | George M. Rasque & Son, contract and change orders | |
| 6 | Purvis Construction Company, general correspondence | |
| 7 | Purvis Construction Company, contract and change orders | |
| 8 | Knott's Dairy trench silo, T.R. Pope, correspondence and contract, 1961 | |
| 9 | A & 300 A, Tate Paint company, exterior and miscellaneous painting, correspondence and contract, 1960- | |
| 10 | University of Idaho, testing concrete cylinders | |
| 11 | Concrete cylinder tests | |
| 12 | Senna Service, Inc., general correspondence, 1959-1961 | |
| 13 | Senna Service, Inc., contract and change orders | |
| 14 | C.M. Wilderman, Co., Inc., general correspondence, 1959-1960 | |
| 15 | C.M. Wilderman, Co., Inc., contract and change orders | |
| 16 | H. Snelgrove, correspondence and contract, earth moving | |
| 17 | Prefab metal isolation barn, J. Knott Dairy Center, general correspondence, 1962 | |
| 18 | Prefab metal isolation barn, J. Knott Dairy Center, General Machinery Company, correspondence, 1962 | |
| 19 | Prefab metal isolation barn, J. Knott Dairy Center, General Machinery Company, contract and change orders, 1962 | |
| 20 | Knott Dairy Center, relocated house, budget | |
| 21 | Relocated house, Knott Dairy, general correspondence, 1962 | |
| 22 | Relocated house, Knott Dairy, Bestway Builders, Inc., correspondence, 1962 | |
| 23 | Relocated house, Knott Dairy, Bestway Builders, Inc., contract and change orders | |
| 24 | Rejected bids | |
| 25 | Prefab metal isolation arn, J. Knott Dairy Center, rejected bids, 1962 | |
| 26 | Relocated house, Knott Dairy, rejected bids, 1962 | |
| 27 | Trench silo (Knott's Dairy), rejected bids, March 17, 1961 | |
| Bldg #419 - Scott-Coman Residence Hall (Renumbered as #72 & #73; See above as #72 and #73) | ||
| 121 | 1 | 1955-1964 |
| 2 | Paul Thiry, general, thru 1956 | |
| 3 | Paul Thiry, general | |
| 4 | Halvorson, general | |
| Bldg #601 - North Fairway and Military Hill Housing | ||
| 5 | Faculty houses | |
| 6 | Equipment for faculty houses | |
| 7 | NW Fabricators | |
| Bldg #651 - Terrace Apartments | ||
| 122 | 1 | Married student housing, Watts, general |
| 2 | Married student housing | |
| 3 | Walker, McGough, and Trogdon, correspondence | |
| 4 | Walker, McGough, and Trogdon, contract | |
| 123 | 1 | Married student housing, Watts, contract |
| 2 | Change orders, JG Watts Construction Co., general, married students | |
| 3 | Watts, contract 2080, exterior paving, etc. | |
| 4 | Married student housing, C. M. Wilderman, general | |
| 5 | Married student housing, C. M. Wilderman, contract | |
| 6 | Change orders, C.M. Wilderman Co., mechanical, married student housing | |
| 7 | Change orders, Spence Electric Co., electrical, married student | |
| 8 | Married student housing, Spence Electric, general | |
| 9 | Married student housing, Spence Electric, contract | |
| 10 | Married student housing, Neill Furniture | |
| 11 | Married student housing, furniture, ranges, and refrigerators | |
| 12 | Married student housing, rejected bids | |
| 13 | Combined rejected bids, married student housing and women's residence buildings | |
| 14 | Minutes and conclusions of meeting to analyze boiler combustion problems, married student housing project, Washington State College, Pullman, Washington | |
| 15 | Married student housing, progress reports | |
| Bldg #660 - Kamiak Apartments | ||
| 124 | 1 | McClure & Adkison, 1960-1961 |
| 2 | Budget, 1962 | |
| 3 | HHFA general, married student housing, 1960, 1961, 1962, 1963, 1964 | |
| 4 | Photographs, 1963 | |
| 5 | Glossy folder | |
| 6 | McClure & Adkison, correspondence, 1963 | |
| 7 | McClure & Adkison, correspondence, 1962 | |
| 8 | General correspondence, 1960-1964 | |
| 9 | McClure & Adkison, contract and change orders, 1963, 1964 | |
| 125 | 1 | McClure & Adkison, work reports |
| 2 | Sceva Construction Company, correspondence, 1963, 1964 | |
| 3 | Sceva Construction Company, Inc., correspondence, 1961, 1962 | |
| 4 | Finish hardware schedule, 1962 | |
| 5 | University of Idaho testing, 1962 | |
| 6 | Washington Testing Laboratories, 1962 | |
| 7 | W.R. O'Rourke Co., correspondence, 1961 | |
| 8 | W.R. O'Rourke Co., contract and change orders, 1962, 1963, 1964 | |
| 9 | Electric Smith, Inc., correspondence, 1961 | |
| 10 | Electric Smith, Inc., contract and change orders, 1962 | |
| 11 | Sceva Construction Co., contract and change orders, 1962 | |
| 126 | 1 | Interior furnishings, general correspondence, 1962 |
| 2 | Spokane Dry Goods Co., contract, change orders, and correspondence, 1963 | |
| 3 | Westinghouse appliance sales, contract change orders, and correspondence, 1963 | |
| 4 | Landscaping, general correspondence | |
| 5 | Walt Ritter's Garden Town, landscape and sprinkler system, contract, change orders, and correspondence | |
| 6 | Rejected bids, general, 1961 | |
| 7 | Rejected bids, mechanical, 1961 | |
| 8 | Rejected bids, electrical, 1961 | |
| 9 | Rejected bids, furnishings | |
| 10 | Landscape work and sprinkler system, rejected bids, 1963 | |
| 11 | Heating report, W.S.U. 100 unit married student apartments, McClure and Adkison, architects, Frank W. Jenkinson, P.E., mechanical engineer, May 5, 1961 | |
| Easter Seal Camp | ||
| 127 | 1 | General foundation work for caretakers residence, budget |
| 2 | General foundation work for a caretaker's residence, general correspondence, 1965 | |
| 3 | General foundation work for caretakers residence, Bestway Building Center, correspondence, 1965 | |
| 4 | General foundation work for caretakers residence, Bestway Building Center, contract, change orders, 1965 | |
| 5 | General foundation work for caretakers residence, affidavit of wages paid, 1965 | |
| 6 | Rejected bids, general foundation work for caretaker's residence at Lake Coeur d'Alene, Idaho, 1965 | |
| 7 | Roof alterations and re-roofing, general correspondence,1965 | |
| 8 | Roof alterations and re-roofing, Diamond Roofing Company, correspondence, 1965 | |
| 9 | Roof alterations and re-roofing, Diamond Roofing Company, contract and change orders, 1965 | |
| 10 | Affidavit of wages paid, roof alterations and re-roofing 15 buildings, Diamond Roofing Company | |
| 11 | Roof alterations and re-roofing, rejected bids, 1965 | |
| Stadium Way-Farmway | ||
| 12 | Site development, budget | |
| 13 | Site development, general correspondence, 1965 | |
| 14 | Site development, L. Keith Hellstrom, landscape architect, correspondence, 1965 | |
| 15 | Site development, L. Keith Hellstrom, landscape architect, contract, change orders, and certificate of payment | |
| 16 | Site development, C & S Builders, correspondence | |
| 17 | Site development, C & S Builders, contract and change orders, 1965 | |
| 18 | Affidavit of wages paid, site development, C & S Builders, Inc. | |
| 19 | Rejected bids, site development, 1965 | |
| Cranberry Blueberry Experimental Station | ||
| 128 | 1 | Larry O. Collins, contractor, 1948-1949 |
| 2 | 1947-1958, Long Beach, Washington | |
| 3 | 1962-, Long Beach | |
| 4 | General correspondence, 1960, Long Beach, Coastal Washington Emp. Sta. | |
| 5 | Paint contract, George H. Smith, (C.B.E.S.), 1959, | |
| Othello Branch Experimental Station | ||
| 6 | 1959 | |
| 7 | Machinery and storage buildings, Othello, Othello Research Farm, budget | |
| 8 | Machinery and storage buildings, general correspondence, 1966, Othello, Othello Research Farm | |
| 9 | Machinery and storage buildings, Othello Research Farm, Othello, Hahn & Campbell, correspondence and contract, consulting engineers | |
| 10 | Machinery and potato storage buildings, Emmett Nelson, Inc., correspndence, Othello Research Farm, Othello | |
| 11 | Machinery and storage buildings, Othello, Emmett Nelson, Inc., contract and change orders | |
| 12 | Machinery and storage buildings, Othello, rejected bids, Othello Research Farm, 1966 | |
| Yakima | ||
| 13 | 4-H Building, Yakima, 1950-1959 Colockum Creek | |
| 14 | Headquarters development, Colockum Creek Research Area, budget | |
| 15 | Headquarters development, Colockum Creek Research Area,general correspondence 1966 | |
| 16 | Headquarters development, Colockum, Vandivort Construction Company, correspondence, 1966 | |
| 17 | Headquarters development, Colockum, Vandivort Construction Company, contract and change orders, 1966 | |
| 18 | Headquarters development for Colockum Research Area, rejected bids, 1966 | |
| Mt. Vernon Experiment Station | ||
| 129 | 1 | Northwest Agricultural Lab, 1947-1948 |
| 2 | 1950-1951 | |
| 3 | 1952-1953 | |
| 4 | Northwest Washington Experiment Station, 1961-1962-1965 | |
| Lind Experiment Station | ||
| 5 | Shop and storage building, Stern Construction, 1960- | |
| 6 | 1947 | |
| 7 | Cherf Brothers Construction Company, 1949 | |
| 8 | 1949-1950 | |
| 9 | Greenhouse addition, budget | |
| 10 | Greenhouse addition, general correspondence, 1963, 1964 1965, 1966 | |
| 11 | Greenhouse addition, R & R Builders, correspondence, 1964 | |
| 12 | Greenhouse addition, R & R Builders, contract and change orders | |
| 13 | Greenhouse addition, rejected bids, 1964 | |
| Prosser Experiment Station | ||
| 130 | 1 | Prosser Experiment Station |
| 2 | Contracts | |
| 3 | Contracts | |
| 4 | Preliminary report, heating plant and steam distribution system | |
| 5 | Moxee Experiment station, 1955-1956 | |
| 6 | Irrigation experiment station, 1955-1957, Prosser greenhouse | |
| 7 | Greenhouse and headhouse, Raymon J. Britton, 1956, contract 1828 | |
| 8 | General, 1947-1960 | |
| 9 | H. Rodgers Hamilton Laboratory Building, budget | |
| 10 | 1961, 1962, 1963, 1965 | |
| 11 | Hamilton Hall, program | |
| 12 | Hamilton Laboratory Building, work progress reports, 1962, 1963 | |
| 13 | H. Rodgers Hamilton Laboratory, Cowan and Paddock, architects, contract and change orders | |
| 14 | H. Rodgers Hamilton Laboratory Building, finish hardware, 1962 | |
| 15 | Hamilton Laboratory Building, Rasmussen B-E-C-K correspondence, 1962, 1963, 1964, 1965 | |
| 16 | Rodgers Hamilton Laboratory, Cowan and Paddock, architects, general correspondence, 1961 | |
| 17 | Hamilton Hall, office and laboratory building general correspondence, 1961-1964, 1965 | |
| 131 | 1 | Hamilton Laboratory Building, Culler, Gale & Martell, correspondence, 1962 |
| 2 | Hamilton Laboratory Building, Rasmussen B-E-C-K, Inc., contract and change orders, 1962 | |
| 3 | Hamilton Laboratory Building, Longview Plumbing and Heating, correspondence, 1962, 1963, 1964, 1965 | |
| 4 | Hamilton Laboratory Building, Longview Plumbing and Heating co., contract and change orders, 1962 | |
| 5 | Hamilton Laboratory Building, Smith & Wilson, Doyle, correspondence, 1962 | |
| 6 | Hamilton Laboratory Building, Smith & Wilson Electric, Inc., contract and change orders, 1962 | |
| 7 | Hamilton Laboratory Building, Hamilton Manufacturing Company, correspondence, 1962, 1963, 1964, 1965 | |
| 8 | Hamilton Laboratory Building, curbs and sidewalks, Rex G. Smith, contract, change orders, and correspondence, 1964 | |
| 9 | Hamilton Laboratory Building, Hamilton Manufacturing company, Guy V. Sweet, representative, contract and chnge orders, 1962 | |
| 10 | H. Rodgers Hamilton Laboratory Building, weekly statements of compliance, Rasmussen B-E-C-K, Inc., 1962 | |
| 11 | H. Rodgers Hamilton Laboratory Building, weekly statements of compliance, Longview Plumbing & Heating, Company, July 1962- | |
| 12 | H. Rodgers Hamilton Laboratory Building, weekly statements of compliance, Smith & Wilson Electric, Inc., 1962 | |
| 13 | H. Rodgers Hamilton Laboratory Building, weekly statements of compliance, Hamilton Manufacturing Company, 1963 | |
| 14 | Rejected bids, H. Rodgers Hamilton Lab Building, 1962 | |
| 15 | Irrigation experiment station, USDA area, 1960 | |
| Puyallup/Western Washington Experimental Station | ||
| 132 | 1 | Western Washington experiment station |
| 2 | Plant science, 1948-1949 | |
| 3 | Vet. Poultry Building, 1946-1950 | |
| 4 | G. Lumm, vet. poultry, 1946-1948 | |
| 5 | Experimental brooder house, 1956 | |
| 6 | Metal building, Hallidie Machinery Co., general correspondence, 1961 | |
| 7 | Metal building shell, Hallidie Machinery Company, contract and change orders and correspondence, 1961 | |
| 8 | 1947-1958 | |
| 9 | Victor N. Jones & Associates, 1948-1958 | |
| 10 | Greenhouse, John Benthien, Tacoma, 1955-1958 | |
| 11 | Greenhouse and headhouse, 1958-1959 | |
| 12 | Poultry diagnostic laboratory, 1953-1958 | |
| 13 | Harold W. Hall, architect, "A Poultry Diagnostic Laboratory," 1957-1959 | |
| 14 | Harold W. Hall, contract, poultry diagnostic lab | |
| 15 | Korsmo Brothers, contract, poultry diagnostic lab, 1957-1958 | |
| 16 | Change orders, Korsmo Brothers, poultry diagnostic lab, 1957-1958 | |
| 17 | General correspondence, 1960, 1961, 1962, 1964, 1965, 1966 | |
| 18 | Office building shell, general correspondence, 1963 | |
| 19 | Office building shell, Rushforth Construction Company, contract, change orders, and correspondence, 1963 | |
| 20 | Rejected bids, an official building shell, 1963 | |
| 21 | Prefab metal machine shed, general correspondence, 1962 | |
| 22 | Prefab metal machine shed, Wright Company, 1963, contract, change orders, and correspondence | |
| 23 | Prefab metal machine shed, rejected bids, 1963 | |
| 24 | Pole barn and miscellaneous concrete work, general correspondence, 1962 | |
| 25 | Pole barn and miscellaneous concrete work, Claude C. Purvis Company, correspondence, 1962 | |
| 26 | Pole barn and miscellaneous concrete work, Claude C. Purvis Company, contract and change orders, 1962 | |
| 27 | Pole barn and miscellaneous concrete work, rejected bids, 1962 | |
| 28 | Poultry diagnostic laboratory, general correspondence, 1962 | |
| 29 | Poultry diagnostic laboratory, re-roofing Korsmo Brothers, contract and correspondence, 1962 | |
| 30 | Rhubarb house, 1960 | |
| 31 | Rhubarb house, MC Linn contract and correspondence, 1960 | |
| 32 | Rhubarb house, rejected bids, October 14, 1960 | |
| 133 | 1 | Bound booklet on the Western Washington Research and extension center, Puyallup, Washington |
| 2 | Office and laboratory building, budget | |
| 3 | Office and lab building, program statement | |
| 4 | Office and lab building, general correspondence, 1966-1969 | |
| 5 | Office and lab building, Naramore, Bain, Brady, and Johanson, architects, general correspondence, 1967 | |
| 6 | Office and lab building, Naramore, Bain, Brady, and Johanson, architects, contract and change orders, 1966 | |
| 7 | Office and lab building, Naramore, Bain, Brady, and Johanson, correspondence, 1968 | |
| 8 | Report of site visit, office and lab building, Naramore, Bain, Brady, and Johanson | |
| 134 | 1 | Office and lab building, Prime Construction Company, correspondence, 1967- |
| 2 | Office and lab building, Prime Construction Company, contract and chnge orders, 1967- | |
| 3 | Office and lab building, Pacific Testing Laboratories correspondence | |
| 4 | Office and lab building, inspection and concrete testing, Pacific Testing Laboratories | |
| 5 | Office and lab building, Pacific Testing Laboratories, contract and change orders | |
| 6 | Office and lab building, Lent's, Inc., correspondence, 1967- | |
| 7 | Office and lab building, Lent's Inc., contract and change orders, 1967- | |
| 8 | Office and lab building, McWik Electric Company, correspondence | |
| 9 | Office and lab building, McWik Electric Company, contract and change orders, 1967- | |
| 10 | Office and lab building, Premalab-Metalab Equipment Corporation, fixed equipment correspondence, 1967- | |
| 11 | Office and lab building, Permalab-Metalab Equipment Corporation, contract and change orders, 1967- | |
| 12 | Rejected bids, office and lab building | |
| 13 | Rejected bids, mechanical, office and lab building | |
| 14 | Rejected bids, electrical, office and lab building | |
| 15 | Rejected bids, fixed equipment, office and lab building | |
| 16 | Office and laboratory building, Naramore, Bain, Brady, and Johanson, architects, correspondence, 1965-1966 | |
| 17 | Woodworth & Company, contract, payments, C.O., and and correspondence, 1969 | |
| 18 | Office and lab, Penthouse Louvers, correspondence, 1969 | |
| Wenatchee Experimental Station | ||
| 135 | 1 | Wenatchee Experimental Station |
| 2 | Entomology Building, 1947-1952 | |
| 3 | Assoc. Builders, Company, Entomology Building, 1948- 1950 | |
| 4 | USDA greenhouse, 1948-1950 | |
| 5 | F.L. Overley Memorial Greenhouse, tree fruit experiment station, 1955-1956 | |
| 6 | Tree fruit experiment station, 1961- | |
| 7 | Tree fruit experiment station, 1947-1959 | |
| 8 | L. Solberg, office, lab, heating, sewage buildings, 1948-1958 | |
| 9 | Greenhouse addition, tree fruit experiment station, budget | |
| 10 | Greenhouse addition, tree fruit experiment station, general correspondence, 1965 | |
| 11 | Greenhouse addition, tree fruit experiment station, National Plumbing and Heating Company, correspondence, 1965 | |
| 12 | Greenhouse addition, tree fruit experiment station, National Plumbing and Heating Company, contract and change orders, 1965 | |
| 13 | Greenhouse addition, tree fruit experiment station, affidavit of wages paid, National Plumbing and Heating Company | |
| 14 | Greenhouse addition, tree fruit experiment station, rejected bids, 1965 | |
| 15 | Office and laboratory building, budget | |
| 16 | Office and laboratory building, tree fruit experiment station, building program | |
| 17 | Office and laboratory building, tree fruit experiment station, general correspondence, 1965, 1966 | |
| 136 | 1 | Research lab building and boiler plant, tree fruit experiment station, Fraley & Leighton, architects, correspondence, 1965-1966 |
| 2 | Research lab building and boiler plant, tree fruit experiment station, Fraley & Leighton, architects, correspondence, 1967 | |
| 3 | Tree fruit experiment station, Fraley & Leighton, architects, contract and change orders, 1965 | |
| 4 | Office and lab building, Lyle E. Marque & Associates, consultant, TFRC, 1966 | |
| 5 | Office and lab building, Cusick's, Inc., general correspondence, tree fruit research center, 1966 | |
| 6 | Office and lab building, Cusick's, Inc., contract and C.O., tree fruit research center, 1966, general construction | |
| 7 | Columbia Concrete Pipe Company, office and lab building, concrete testing and correspondence, 1966 | |
| 8 | Office and lab building, Wells and Wade, Inc., mech. correspondence, tree fruit research center, 1966 | |
| 9 | Office and lab building, Wells and Wade, Inc., contract and C.O., tree fruit research center, 1966, mechanical construction | |
| 10 | Office and lab building, Schmitt Electric, correspondence, 1966 | |
| 11 | Office and lab building, Schmitt Electric, contract and C.O., tree fruit research center, 1966 | |
| 12 | Office and lab building, Hamilton Lab, Guy V. Sweet, Co., casework correspondence, 1966 | |
| 13 | Office and lab building, Hamilton Lab, Guy V. Sweet, co., contract and C.O., tree fruit rc, 1966 | |
| 14 | Tree fruit research center, purchase orders, 1967 | |
| 15 | Office and lab building, rejected bids, general, tree fruit research center, 1966 | |
| 16 | Office and lab building, rejected bids, mechanical, tree fruit research center, 1966 | |
| 17 | Office and lab building, rejected bids, electrical, tree fruit research center, 1966 | |
| 18 | Office and lab building, rejected bids, casework, tree fruit research center, 1966 | |
| Pullman Experimental Station | ||
| 137 | 1 | Miscellaneous, 1947-1956 |
| Steam Tunnels | ||
| 138 | ||
| Miscellaneous | ||
| 139 | 1 | Campus entrance sign, Moscow Highway and Stadium Way, 1955 |
| 2 | Pullman entrance sign, 1959, Chase Sign Co. and class of 1960 | |
| 3 | Spokane Public Library, remodeling, 1963 | |
| 4 | Crippled children's camp, Easter Seal Camp | |
| 5 | Wheelchair cabin, Camp East Seal | |
| 6 | Dedictory plaques, 1960- | |
| 7 | Dedicatory plaques, C & S Builders, contract, correspondence, etc., 1960 | |
| 8 | Office for committee on academic standing services building, 1960 | |
| 9 | Paving | |
| 10 | C. Pettibone | |
| 140 | 1 | Pine Manor type dorm |
| 2 | Housing and home finance agency, general information | |
| 3 | HHFA, combined dorm and housing, S-C and Terrace | |
| 4 | Testing concrete cylinders, University of Idaho, married student housing | |
| 5 | Housing and Home Finance Agency, contract change memorandum | |
| 6 | FWA utilities | |
| 7 | FWA buildings | |
| 8 | Housing, 611 campus | |
| 9 | 611 campus | |
| 10 | Housing, 906 Thatuna | |
| 11 | Living units, east of S. Fairway | |
| 12 | East Fairway, preliminary | |
| 13 | 23 houses, Military Hill | |
| 14 | Married student apartments | |
| 15 | South Fairway | |
| 16 | Sidewalks and curbs, South Fairway, O.A. Johnson | |
| 17 | Contracts | |
| 18 | Master planning for residence halls, Lea, Pearson, & Richards, general correspondence, 1961, 1963 | |
| 19 | Master planning for residence halls, Lea, Pearson, & Richards, contract and change orders, 1963 | |
| 141 | 1 | Thesis, "Sewerage System for the Washington Agricultural College and School of Science," by Carl Estby, 1897 |
| 2 | Thesis, "Design of a System of Roads and Walks for the Campus of the State College of Washington," by Morgan V. Moulton and Clarence L. Hix, 1909. | |
| 3 | Campus plan | |
| 4 | Men's dorm, women's dorm, married students, cost, information, etc. | |
| 5 | Typical floor plans, Regents, Kruegel, etc., housing project | |
| 6 | Dormitory planning information | |
| 7 | Streit-Perham, perspective | |
| 142 | 1 | Plan 700 |
| 2 | Land | |
| 3 | Contracts | |
| 4 | Utilities (water, sewer, electricity, steam), farm area | |
| 5 | Agricultural building program, May 8, 1952 | |
| 6 | Agricultural building program, 1954, departmental requests | |
| 7 | Agricultural building program, 1954, priority list | |
| 8 | Agricultural building program, 1955 | |
| 9 | Agricultural building program, 1948-1949 | |
| 10 | Agricultural building program, 10-year plan | |