| Back to Finding Aids | |
| Washington State University Libraries Manuscripts, Archives, and Special Collections Pullman, WA 99164-5610 USA (509) 335-6691 Inquiries |
Archives 49
Physical Plant
Contracts, 1950-1966
The Contracts sent to the University Archives by the Physical Plant in August 1978 have been processed. The following is a list of the contracts that we have and the container in which they have been placed.
ORGANIZATIONAL HISTORY
Washington State University's Department of Physical Plant has responsibility for a wide-ranging set of tasks concerning the buildings and grounds of the university. Among these tasks are various construction and remodeling efforts, usually of smaller scale and outside the scope of concern of the Department of Facilities Planning, the office responsible for major construction and renovation projects.
In some cases, the Department of Physical Plant contracts for construction and remodeling work, rather than using the crews and facilities of the department. In those cases, the department manages the contracts. It is those contracts that comprise this group of records.
ARRANGEMENT AND DESCRIPTION
The records are arranged by contract number, which are incidently in chronological order. In many instances, records concerning a given contract may occupy more than one folder.
See Also:
ID number location beginning -- ending Archives 198 1368 7231 UA89-05 2-36-20-3 7234 7937 UA91-21 2-36-10-5 7940 9604 UA93-33 2-36-23-3 9614 10947 UA94-10 2-40-04-1 10339 11205 also 6641, 9280, 9532
RESTRICTIONS
The materials in this Archive are restricted to the use of authorized personnel only.
CONTAINER LIST
| Box | Contract | Description |
| 1 | 625 | Construction of Cougar Cage |
| 626 | Reroofing Field House | |
| 639 | Storm Sewer - Upper Lake St. | |
| 640 | Concrete Utility Subway 2 folders | |
| 663 | Reroofing Chemical Engineering Bldg. | |
| 664 | Concrete Reservoir at Lind, WA | |
| 666 | Reroofing Home Ec Bldg. | |
| 667 | Reroofing Ad Bldg. | |
| 680 | Mechanical Attention - College Hall | |
| 681 | Electrical Attention - College Hall | |
| 692 | Waterline - New Women's Dorm | |
| 695 | Reroofing six campus buildings | |
| 710 | Air Conditioning in Tech. Bldg. | |
| 711 | Underground Piping new Women's Dorm | |
| 771 | Waterline - Hilltop Stables | |
| 773 | Relining Incinerator | |
| 808 | Storm Sewer & Sewer Line - Women's Dorm | |
| 830 | Blasting water line - Hilltop Stables | |
| 831 | Drill ditch water line - Hilltop Stables | |
| 850 | Cover Roof - Vet Clinic | |
| 853 | Reroofing Bryan Hall | |
| 854 | Reroofing Engineering Lab | |
| 886 | Water Pipe - Hilltop Stables | |
| 890 | More sewer line - Tech Bldg. | |
| 910 | Grilles for Bohler Gym | |
| 920 | Storm Drain - Finch New Hospital | |
| 960 | Animal Cage Construction - Vet Clinic | |
| 985 | Move 3 buildings from Kennewick to Prosser | |
| 1011 | Move building from Kennewick to Prosser | |
| 1020 | Abattoir addition to Stock Pavilion | |
| 1045 | Abattoir Cold Storage Rooms | |
| 1049 | Electrical Alteration - Bryan Hall | |
| 1060 | Mechanical Alterations - Bryan Hall | |
| 1091 | Reroofing Van Dorn and Arts Hall | |
| 1125 | Reroofing N. Fairway Housing | |
| 1151 | Reroofing Mc Croskey Hall | |
| 1177 | 75' Smoke Stack on Field House | |
| 1258 | Reroofing Engineering | |
| 1259 | Reroofing West House | |
| 1275 | Fire Detection System - Theta XI Fraternity | |
| 1290 | Fire Detection System - Beef Cattle Barn | |
| 2 | 1309 | Sewer, Water & Heating - - Cattle Disease Bldg |
| 1337 | Deep well - Prosser | |
| 1445 | Columbia Dorms Removal | |
| 1542 | Fire Detection System - Cattle Feeding Lab | |
| 1543 | Fire Detection System - Sheep Center | |
| 1544 | Fire Detection System - Hilltop Stables | |
| 1545 | Fire Detection System - Service Barn | |
| 1546 | Power Plant Extension - Eng. Services ( 2 folders ) | |
| 1588 | Power Plant Extension - Drill Test Holes | |
| 1603 | Steam Line - Waller & Stimson Hall | |
| 1604 | Carpenter Hall - North entrance (New) | |
| 1605 | Arts Hall - West entrance (New) | |
| 1620 | #5 Boiler Power Plant | |
| 1627 | Reroofing - Puyallup Exp Sta. | |
| 1645 | Well - SW WA Ex Sta. | |
| 1650 | Steam Subway (2 folders) | |
| 1667 | Power Plant - Mechanical Equipment | |
| 1685 | Power Plant - Chimney Inspection | |
| 1689 | Server - So. End of Stadium Way | |
| 1728 | Deep Well Drilling - Exploratory | |
| 1753 | Steam and Storm Sewer Underground | |
| 1754 | Elevator - Wegner Hall | |
| 1764 | Electrical Alt. - Stimson Hall | |
| 1771 | Reroofing - Various Bldg | |
| 1792 | Deep Well Drilling - Agronomy Farm | |
| 1814 | Moscow Rd Entrance Sign | |
| 1848 | String line to Regents Dorm | |
| 1870 | Fire Escapes - Waller Hall | |
| 1872 | Deep well Pumping & Pneumatic Water System - Agronomy farm | |
| 1883 | Deep Well Drilling - Vet Med Farm | |
| 1884 | Mechanical Equipment - Prosser Greenhouse A | |
| 1885 | Mechanical Equipment - Prosser Greenhouse B | |
| 3 | 1889 | East House - Demolition & Removal |
| 1897 | Power Plant - Gas Conversion | |
| 1918 | Reroofing Various Housing Units | |
| 1926 | Drilling 2 test holes - Plant Science Bldg | |
| 1941 | Reroofing sheep barn | |
| 1980 | Reroofing Wash. State Regional School Lab | |
| 1981 | Barn Minor - Roofing | |
| 1982 | Puyallup - Roofing Blds | |
| 1984 | Industrial Research - Cyclatherme boiler | |
| 1998 | Test Holes - Vet Clinic Addition | |
| 2002 | Mechanical - Service Lab Addition | |
| 2003 | Electrical - Service Lab Addition | |
| 2017 | Puyallup - Water Main | |
| 2021 | MT Vernon - Move Insectory Bldg | |
| 2026 | Long Beach - New Boiler | |
| 2031 | Test Holes - Vet Clinic Addition | |
| 2038 | Demolition of Chimney | |
| 2065 | Water and Sewer Reservoir | |
| 2109 | Regents Dorm Addition - Storm Drainage | |
| 2144 | Heating Plant - Repair Chimney | |
| 2164 | Reroofing Horticulture Field House | |
| 2165 | Reroofing Grounds Shop | |
| 2168 | Power Plant Expansion - Engineering Services | |
| 2200 | Doing Plant Site - Water Well Drilling | |
| 2242 | Underground Subway - Steam & Storm Sewer (3 folders) | |
| 2255 | Doing Plant - Water System (2 folders) | |
| 2289 | Power Plant - Switchgear | |
| 2290 | KWSC Tower - Ground System | |
| 2302 | Puyallup - Well Drilling | |
| 2322 | Vancouver - Reroofing Ad Bldg | |
| 2328 | Fulmer Lab Addition - Sewer System | |
| 2382 | Water System Reservoir (4 folders) | |
| 4 | 2395 | Vancouver - Septic Tank Drain Field |
| 2401 | Vancouver - Office Bldg Remodel | |
| 2420 | Storm System Subway | |
| 2464 | Bohler Gym Entrance Bridge | |
| 2478 | Wenatchee - Irrigation Facility | |
| 2500 | Storm main - Stadium Way | |
| 2513 | Furnace Installation - Farm Foreman | |
| 2553 | Water Distribution Extensions | |
| 2557 | Power Plant - Water Shed System ( 2 folders) | |
| 2569 | Wawawai- Deep well Pump | |
| 2572 | Boiler #6- Eng. Services (2 folders) | |
| 2612 | Camp Easter Seal - Deep Well Drilling | |
| 2651 | Sanitary Sewer System - Joint with City Hall (2 folders) | |
| 2652 | Water Systems - Eng. Services | |
| 2666 | 2000KW turbine-Generator (2 folders & 2 envelopes) | |
| 5 | 2667 | Boiler #6- Furnish & Install (2 folders & 2 envelopes) |
| 2684 | Steam distribution - Farm Way Rd | |
| 2734 | Sewage Treatment Plant - Joint - City of Pullman | |
| 2743 | Rogers stadium - Sound System | |
| 2748 | South House - demolition | |
| 2750 | Subway -farm Way | |
| 2751 | Sewers - Cleveland Hall area | |
| 2756 | Boiler #6 Ax Equipment (4 folders) | |
| 2828 | Fire Detection - Fulmer Hall | |
| 6 | 2829 | Othello - Drill Water Well |
| 2830 | Tunnel - Power Plant to Rogers Hall (2 folders) | |
| 2861 | Water System at Camp Easter Seal | |
| 2874 | Fulmer Lab - Mechanical Alt. ( 2 folders) | |
| 2878 | Drill Water Well - Campus | |
| 2879 | Prosser - Water Tank Foundation | |
| 2880 | Prosser - Water Tank Erection | |
| 2906 | Long Beach - Reroofing Garage & Machine Shop | |
| 2907 | Long Beach - Reroofing Warehouse | |
| 2920 | Traffic Survey - Campus | |
| 2928 | Vancouver - Install Sewer System | |
| 2950 | Sale & Remove House East of Cattle Feed Lab | |
| 2955 | Bohler Gym Seats | |
| 2956 | Vancouver - Sale of Barn | |
| 2963 | Sale of House at 1005 Colorado | |
| 2966 | Arts Hall - Two Temp Control System | |
| 2968 | Master Fire Alarm at Receiving Station | |
| 2996 | Reroofing 7 Buildings | |
| 2998 | Rogers Hall area - Sewer & Water Distribution | |
| 3006 | Mt Vernon - Reroofing Ad Building | |
| 3014 | Farm Way Rd area - Sewer & Water Distribution | |
| 3023 | Subway along Farm Way Rd (2 folders) | |
| 7 | 3024 | Wilson Rd. widening |
| 3028 | Install Coaxial Cable in WSU Tunnel | |
| 3029 | Deep Well Pumping Station #4 | |
| 3037 | Campus Strut Improvement - Consulting Service (2 folders) | |
| 3062 | Reservoir #2 (4 folders + 2 envelopes) | |
| 3073 | Drill Well -Wetland Property | |
| 3077 | Traffic Study - Rogers Orton Complex | |
| 3090 | Wilson Hall - Relocate Transmit Equipment | |
| 3093 | Fire Alarm - Spokane Ext. Bldg | |
| 3105 | Air Conditioning - Dorm & Albrook Lab | |
| 3129 | Farm Way Rd - Landscape | |
| 3130 | Forest Way Tunnel - Relocate Valves | |
| 3132 | Install A-V Coaxial Cable | |
| 3133 | Incinerator Repair | |
| 3176 | Library - Listening Lab | |
| 3184 | Prosser - Land Development | |
| 3198 | Golf Course Imp System | |
| 3229 | Deep Well Pumping System - Whelan Property | |
| 8 | 3247 | Stadium Way - Traffic Channelization |
| 3251 | Royal Slope - Pipe Irrigation System | |
| 3252 | Pullman Jaycees - Sale & Removal of 2 Quonset Huts | |
| 3263 | Fire Alarm Interconnection | |
| 3264 | Puyallup - Reroofing Bldg | |
| 3280 | Oil Storage Tank - Pumper & Piping (5 folders) | |
| 3292 | Bryan Hall Chimney? System | |
| 3326 | Fulmer Lab - Exhaust System | |
| 3330 | Reservoir #1- Consulting Services | |
| 3358 | Forestry area - Service Rd and Water System | |
| 3386 | Football Field - Water & Sprinkler System | |
| 3387 | West House - Demo & Removal | |
| 3395 | Kimbrough - Sound System | |
| 3403 | Prosser - Trench and Drain Line | |
| 3404 | Rogers Field - High Jump Running | |
| 3413 | CBR Unit - Land Development | |
| 3418 | Prosser - Pipe Irrigation System | |
| 3425 | Orton Hall - Waterline Relocation | |
| 3428 | University Trunk & N. Grand sewers (2 folders) | |
| 3429 | University Trunk - Eng. Services City of Pullman | |
| 3430 | Grand Trunk - Eng. Services City of Pullman | |
| 3458 | AM - FM 7 TV Dist - Rogers Hall | |
| 3474 | Street Improvement - Campus (2 folders) |