Archives 49
Physical Plant
Contracts, 1950-1966

The Contracts sent to the University Archives by the Physical Plant in August 1978 have been processed. The following is a list of the contracts that we have and the container in which they have been placed.

Number of containers: 8
Linear feet of shelf space: 8

ORGANIZATIONAL HISTORY

Washington State University's Department of Physical Plant has responsibility for a wide-ranging set of tasks concerning the buildings and grounds of the university. Among these tasks are various construction and remodeling efforts, usually of smaller scale and outside the scope of concern of the Department of Facilities Planning, the office responsible for major construction and renovation projects.

In some cases, the Department of Physical Plant contracts for construction and remodeling work, rather than using the crews and facilities of the department. In those cases, the department manages the contracts. It is those contracts that comprise this group of records.

ARRANGEMENT AND DESCRIPTION

The records are arranged by contract number, which are incidently in chronological order. In many instances, records concerning a given contract may occupy more than one folder.

See Also:


ID number      location    beginning -- ending

Archives 198                  1368  7231

UA89-05        2-36-20-3      7234  7937

UA91-21        2-36-10-5      7940  9604

UA93-33        2-36-23-3      9614  10947

UA94-10        2-40-04-1      10339 11205 also 6641, 9280, 9532

RESTRICTIONS

The materials in this Archive are restricted to the use of authorized personnel only.

CONTAINER LIST

BoxContract  Description
1625Construction of Cougar Cage
626Reroofing Field House
639Storm Sewer - Upper Lake St.
640Concrete Utility Subway 2 folders
663Reroofing Chemical Engineering Bldg.
664Concrete Reservoir at Lind, WA
666Reroofing Home Ec Bldg.
667Reroofing Ad Bldg.
680Mechanical Attention - College Hall
681Electrical Attention - College Hall
692Waterline - New Women's Dorm
695Reroofing six campus buildings
710Air Conditioning in Tech. Bldg.
711Underground Piping new Women's Dorm
771Waterline - Hilltop Stables
773Relining Incinerator
808Storm Sewer & Sewer Line - Women's Dorm
830Blasting water line - Hilltop Stables
831Drill ditch water line - Hilltop Stables
850Cover Roof - Vet Clinic
853Reroofing Bryan Hall
854Reroofing Engineering Lab
886Water Pipe - Hilltop Stables
890More sewer line - Tech Bldg.
910Grilles for Bohler Gym
920Storm Drain - Finch New Hospital
960Animal Cage Construction - Vet Clinic
985Move 3 buildings from Kennewick to Prosser
1011Move building from Kennewick to Prosser
1020Abattoir addition to Stock Pavilion
1045Abattoir Cold Storage Rooms
1049Electrical Alteration - Bryan Hall
1060Mechanical Alterations - Bryan Hall
1091Reroofing Van Dorn and Arts Hall
1125Reroofing N. Fairway Housing
1151Reroofing Mc Croskey Hall
117775' Smoke Stack on Field House
1258Reroofing Engineering
1259Reroofing West House
1275Fire Detection System - Theta XI Fraternity
1290Fire Detection System - Beef Cattle Barn
21309Sewer, Water & Heating - - Cattle Disease Bldg
1337Deep well - Prosser
1445Columbia Dorms Removal
1542Fire Detection System - Cattle Feeding Lab
1543Fire Detection System - Sheep Center
1544Fire Detection System - Hilltop Stables
1545Fire Detection System - Service Barn
1546Power Plant Extension - Eng. Services ( 2 folders )
1588Power Plant Extension - Drill Test Holes
1603Steam Line - Waller & Stimson Hall
1604Carpenter Hall - North entrance (New)
1605Arts Hall - West entrance (New)
1620#5 Boiler Power Plant
1627Reroofing - Puyallup Exp Sta.
1645Well - SW WA Ex Sta.
1650Steam Subway (2 folders)
1667Power Plant - Mechanical Equipment
1685Power Plant - Chimney Inspection
1689Server - So. End of Stadium Way
1728Deep Well Drilling - Exploratory
1753Steam and Storm Sewer Underground
1754Elevator - Wegner Hall
1764Electrical Alt. - Stimson Hall
1771Reroofing - Various Bldg
1792Deep Well Drilling - Agronomy Farm
1814Moscow Rd Entrance Sign
1848String line to Regents Dorm
1870Fire Escapes - Waller Hall
1872 Deep well Pumping & Pneumatic Water System - Agronomy farm
1883Deep Well Drilling - Vet Med Farm
1884Mechanical Equipment - Prosser Greenhouse A
1885Mechanical Equipment - Prosser Greenhouse B
31889East House - Demolition & Removal
1897Power Plant - Gas Conversion
1918Reroofing Various Housing Units
1926Drilling 2 test holes - Plant Science Bldg
1941Reroofing sheep barn
1980Reroofing Wash. State Regional School Lab
1981Barn Minor - Roofing
1982Puyallup - Roofing Blds
1984Industrial Research - Cyclatherme boiler
1998Test Holes - Vet Clinic Addition
2002Mechanical - Service Lab Addition
2003Electrical - Service Lab Addition
2017Puyallup - Water Main
2021MT Vernon - Move Insectory Bldg
2026Long Beach - New Boiler
2031Test Holes - Vet Clinic Addition
2038Demolition of Chimney
2065Water and Sewer Reservoir
2109Regents Dorm Addition - Storm Drainage
2144Heating Plant - Repair Chimney
2164Reroofing Horticulture Field House
2165Reroofing Grounds Shop
2168Power Plant Expansion - Engineering Services
2200Doing Plant Site - Water Well Drilling
2242Underground Subway - Steam & Storm Sewer (3 folders)
2255Doing Plant - Water System (2 folders)
2289Power Plant - Switchgear
2290KWSC Tower - Ground System
2302Puyallup - Well Drilling
2322Vancouver - Reroofing Ad Bldg
2328Fulmer Lab Addition - Sewer System
2382Water System Reservoir (4 folders)
42395Vancouver - Septic Tank Drain Field
2401Vancouver - Office Bldg Remodel
2420Storm System Subway
2464Bohler Gym Entrance Bridge
2478Wenatchee - Irrigation Facility
2500Storm main - Stadium Way
2513Furnace Installation - Farm Foreman
2553Water Distribution Extensions
2557Power Plant - Water Shed System ( 2 folders)
2569Wawawai- Deep well Pump
2572Boiler #6- Eng. Services (2 folders)
2612Camp Easter Seal - Deep Well Drilling
2651Sanitary Sewer System - Joint with City Hall (2 folders)
2652Water Systems - Eng. Services
26662000KW turbine-Generator (2 folders & 2 envelopes)
52667Boiler #6- Furnish & Install (2 folders & 2 envelopes)
2684Steam distribution - Farm Way Rd
2734Sewage Treatment Plant - Joint - City of Pullman
2743Rogers stadium - Sound System
2748South House - demolition
2750Subway -farm Way
2751Sewers - Cleveland Hall area
2756Boiler #6 Ax Equipment (4 folders)
2828Fire Detection - Fulmer Hall
62829Othello - Drill Water Well
2830Tunnel - Power Plant to Rogers Hall (2 folders)
2861Water System at Camp Easter Seal
2874Fulmer Lab - Mechanical Alt. ( 2 folders)
2878Drill Water Well - Campus
2879Prosser - Water Tank Foundation
2880Prosser - Water Tank Erection
2906Long Beach - Reroofing Garage & Machine Shop
2907Long Beach - Reroofing Warehouse
2920Traffic Survey - Campus
2928Vancouver - Install Sewer System
2950Sale & Remove House East of Cattle Feed Lab
2955Bohler Gym Seats
2956Vancouver - Sale of Barn
2963Sale of House at 1005 Colorado
2966Arts Hall - Two Temp Control System
2968Master Fire Alarm at Receiving Station
2996Reroofing 7 Buildings
2998Rogers Hall area - Sewer & Water Distribution
3006Mt Vernon - Reroofing Ad Building
3014Farm Way Rd area - Sewer & Water Distribution
3023Subway along Farm Way Rd (2 folders)
73024Wilson Rd. widening
3028Install Coaxial Cable in WSU Tunnel
3029Deep Well Pumping Station #4
3037Campus Strut Improvement - Consulting Service (2 folders)
3062Reservoir #2 (4 folders + 2 envelopes)
3073Drill Well -Wetland Property
3077Traffic Study - Rogers Orton Complex
3090Wilson Hall - Relocate Transmit Equipment
3093Fire Alarm - Spokane Ext. Bldg
3105Air Conditioning - Dorm & Albrook Lab
3129Farm Way Rd - Landscape
3130Forest Way Tunnel - Relocate Valves
3132Install A-V Coaxial Cable
3133Incinerator Repair
3176Library - Listening Lab
3184Prosser - Land Development
3198Golf Course Imp System
3229Deep Well Pumping System - Whelan Property
83247Stadium Way - Traffic Channelization
3251Royal Slope - Pipe Irrigation System
3252Pullman Jaycees - Sale & Removal of 2 Quonset Huts
3263Fire Alarm Interconnection
3264Puyallup - Reroofing Bldg
3280Oil Storage Tank - Pumper & Piping (5 folders)
3292Bryan Hall Chimney? System
3326Fulmer Lab - Exhaust System
3330Reservoir #1- Consulting Services
3358Forestry area - Service Rd and Water System
3386Football Field - Water & Sprinkler System
3387West House - Demo & Removal
3395Kimbrough - Sound System
3403Prosser - Trench and Drain Line
3404Rogers Field - High Jump Running
3413CBR Unit - Land Development
3418Prosser - Pipe Irrigation System
3425Orton Hall - Waterline Relocation
3428University Trunk & N. Grand sewers (2 folders)
3429University Trunk - Eng. Services City of Pullman
3430Grand Trunk - Eng. Services City of Pullman
3458AM - FM 7 TV Dist - Rogers Hall
3474Street Improvement - Campus (2 folders)