| Back to Finding Aids | |
| Washington State University Libraries Manuscripts, Archives, and Special Collections Pullman, WA 99164-5610 USA (509) 335-6691 Inquiries |
Archives 280-284
W.S.U. Capital Planning and Facilities Development
Building Files and Reports, 1963-1999
ORGANIZATIONAL HISTORY
A University Architect served as the construction officer at Washington State University from 1911 forward. The modern form of the office dates from 1947 when it became a full-time, staffed administrative department. In 1967 the office was renamed as Facilities Planning, and then to Facilities Development in 1993 upon absorbing the engineering portion of the Physical Plant. In 2001 it was renamed as Capital Planning. While Capital Planning is responsible for major planning and development, smaller projects are conducted by Facilities Operations. Facilities Operations descended from the Physical Plant in 1998, which in turn descended from Building and Grounds in 1967. While each line of programs has existed separately, some migration in function has occurred over the years. The primary difference between Capital Planning and Facilities Operations is the cost of the project in question - initially items costing less than $1,000,000 were assigned to Fac Ops, and those costing more to CP. By 2009, this break point is between $1,500,000 and $2,000,000.
COLLECTION ARRANGEMENT
This page compiles a number of collections received from Capital Planning and its predecessor, Facilities Development, between 1995 and 2002, in reverse chronological (newest to oldest) order. In requesting materials, please make sure you have identified the correct collection. This page compiles:
Archives 280. Capital Planning Building Files and Records, 1981-1999. UA 2002-03. Received March, 2002.
Archives 281. Facilities Development Vancouver Campus Files and Records, 1986-1998. UA 2000-12. Received April, 2000.
Archives 282. Facilities Development Building Files and Records, 1978-1996. UA 1998-16. Received July, 1998.
Archives 283. Facilities Development Building Files and Records, 1963-1998. UA 1998-14. Received July, 1998.
Archives 284. Facilities Development Building Files and Records, 1964-1995. UA 1995-18. Received October, 1995.
Each collection is maintained in the order in which it was received in the Archives from Capital Planning.
ACCESS
The majority of these are open and available for research use, though a few files are marked as confidential or classified (these are primarily identified as Attorney General files or Issues & Claims files; please contact Capital Planning if you wish access to these) and access to those may be restricted. These files are labeled in this page as RESTRICTED, each box containing restricted material is so labeled, and individual restricted folders are stickered as such. Copyright restrictions may apply.
RELATED MATERIALS
The WSU Archives hold a number of other Capital Planning collections; to locate these please view our Archives' Collections List and our Accessions List, looking for the various names under which this department has operated: University Architect, Facilities Planning, Facilities Development, Capital Planning.
Archives 280
Capital Planning
Building Files and Records, 1981-1999
ACQUISITION AND PROCESSING INFORMATION
These Capital Planning Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on March 19th, 2002 (UA 2002-03) by Annie (last name unrecorded) of Capital Planning. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few small files for individual buildings at the end. Buildings included here include Streit-Perham Hall, Hall Rotunda Dining Hall, and Stimson Hall.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Capital Planning Building Files and Records, 1981-1999 (UA 280)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| Building 0032 — Science Hall Remodeling, Phase II | |
| 1 | Budget 2/26/1986 - 6/24/1993 |
| Regents 1/8/1987 - 8/7/1990 | |
| Mahan & Smith Correspondence 5/5/1982 - 5/16/1988 | |
| S. G. Morin Correspondence C08967 6/29/1987 - 10/15/1987 | |
| Construction Reports 6/6/1988 - 1/2/1992 | |
| Concrete Tests 1/4/1989 - 12/27/1988 | |
| Arbitration Correspondence 5/5/1992 - 10/8/1993 | |
| General Correspondence #10 11/1/1990 - 6/15/1993 | |
| Decker/Fukui Architects (Decker Associates) General Correspondence #6 10/19/1990 - 12/8/1992 | |
| Decker/Fukui Architects Contract File #3 C08470 11/1/1990 - 1/14/1993 | |
| Bouten Construction General Correspondence #2 6/1/1990 - 11/17/1992 | |
| Bouten Construction Contract File #3 C09267 10/27/1989 - 2/26/1993 | |
| Statements of Compliance 8/11/1988 - 12/14/1989 | |
| Rejected Bids — Electrical — Bid Date 4/21/1988 | |
| Rejected Bids — Mechanical — Bid Date 4/21/1988 | |
| Rejected Bids — General — Bid Date 4/28/1988 | |
| General Correspondence #9 5/1/1990 - 10/31/1990 | |
| General Correspondence #8 1/1/1990 - 4/30/1990 | |
| 2 | General Correspondence #7 6/1/1989 - 12/31/1989 |
| General Correspondence #6 1/1/1989 - 5/31/1989 | |
| General Correspondence #5 3/1/1988 - 12/31/1988 | |
| General Correspondence #4 7/1/1987 - 2/29/1988 | |
| General Correspondence #3 12/1/1986 - 6/30/1987 | |
| General Correspondence #2 6/1/1986 - 11/30/1986 | |
| General Correspondence #1 2/10/1983 - 5/31/1986 | |
| Building Program May, 1982 | |
| Building Program November, 1985 | |
| Building Program December, 1985 | |
| BIOS Exhibit Planning and Design Statement of Qualifications | |
| Decker/Hobbs Fukui Davison Life Cycle Cost Analysis 12/9/1982 | |
| Decker/Fukui Davison Schematic Design Phase Brochure November, 1986 | |
| Decker/Fukui and BIOS Exhibit Program Review and Recommendations 8/6/1990 | |
| Neudorfer Engineers, Inc. Test Report 1/27/1992 | |
| 3 | Decker Fukui General Correspondence #5 1/1/1990 - 10/31/1990 |
| Decker Fukui General Correspondence #4 1/1/1989 - 12/31/1989 | |
| Decker Fukui General Correspondence #3 7/1/1987 - 12/31/1988 | |
| Decker Fukui General Correspondence #2 2/1/1987 - 6/30/1987 | |
| Decker Fukui General Correspondence #1 11/20/1985 - 1/31/1987 | |
| Decker Fukui Contract File #2 C08470 1/8/1988 - 10/31/1990 | |
| Decker Fukui Contract File #1 C08470 3/1/1986 - 1/7/198 8 | |
| Bouten Construction General Correspondence #1 6/1/1988 - 5/31/1990 | |
| Bouten Construction Contract File #2 C09267 4/1/1989 - 10/31/1989 | |
| Bouten Construction Contract File #1 C09267 4/1/1988 - 3/31/1989 | |
| Building 0055A — Todd Hall Addition | |
| 4 | Budget 1/11/1983 - 5/17/1991 |
| Environmental Impact Statement 6/23/1988 - 7/21/1988 | |
| Regents 11/4/1987 - 11/12/1990 | |
| Burke/Lee, A Joint Venture Correspondence 10/3/1988 - 12/12/1990 | |
| Burke/Lee, A Joint Venture Site Selection Study February, 1994 | |
| Mahan and Smith Correspondence 3/13/1984 - 1 1/27/1990 | |
| Construction Reports 7/7/1989 - 12/14/1991 | |
| Pittsburgh Testing Laboratory Concrete Testing 7/24/1989 - 5/22/1990 | |
| Todd Hall Terrace 5/17/1990 - 11/1/1990 | |
| General Correspondence #6 11/1/1990 - 1/7/1999 | |
| Henry Klein Partnership General Correspondence #7 10/1/1990 - 1/7/1999 | |
| Henry Klein Partnership Contract File C07860 1/1/1984 - 5/31/1991 | |
| C.D. Contractors General Correspondence #3 9/1/1990 - 5/19/1993 | |
| C.D. Contractors Contract File #2 3/29/1990 - 1/25/1991 | |
| Rejected Bids — Bid Date 4/25/1989 | |
| Schematic Design Brochure November, 1987 | |
| Building Program Statement December, 1983 | |
| General Correspondence #5 3/1/1990 - 10/31/1990 | |
| General Correspondence #4 8/1/1989 - 2/28/1990 | |
| General Correspondence #3 1/1/1989 - 7/31/1989 | |
| General Correspondence #2 7/1/1984 - 12/31/1988 | |
| 5 | General Correspondence #1 11/1/1982 - 6/30/1984 |
| Henry Klein Architects General Correspondence #6 4/1/1990 - 9/30/1990 | |
| Henry Klein Architects General Correspondence #5 11/1/1989 - 3/31/1990 | |
| Henry Klein Architects General Correspondence #4 7/1/1989 - 10/31/1989 | |
| Henry Klein Architects General Correspondence #3 1/1/1989 - 6/30/1989 | |
| Henry Klein Architects General Correspondence #2 1/1/1985 - 12/31/1988 | |
| Henry Klein Architects General Correspondence #1 11/1/1982 - 6/30/1984 | |
| C.D. Contractors General Correspondence #2 2/1/1990 - 8/31/1990 | |
| C.D. Contractors General Correspondence #1 5/31/1989 - 1/31/1990 | |
| C.D. Contractors Contract File #1 C09729 6/1/1989 - 3/31/1990 | |
| Building 0088 — WSU Children’s Center | |
| 6 | Budget |
| Environ mental Impact Statement | |
| Regents Reports | |
| Mahan & DeSalvo Correspondence | |
| Gifford Consultants Geotechnical Report | |
| Building Committee | |
| Constniction Reports | |
| General ColTespondence #3 | |
| Tsang Partnership General ColTespondence #4 | |
| Tsang Partnership Contract File CO10799 | |
| Pacific Crest Contractors, Inc. General Correspondence #2 | |
| Pacific Crest Contractors Contract File #2 CO 11340 | |
| Child Care Facility Playground Log #105378 General Correspondence | |
| Child Care Facility Playground Tsang Partnership General Correspondence | |
| Child Care Facility Playground R.A. Co. General Correspondence | |
| Child Care Facility Playground R.A. Co. Contract File CO11727 | |
| Pacific Crest Contractors Pending Change Proposals | |
| Rejected Bids - Bid Date 3/25/1993 | |
| General Correspondence #2 | |
| General Correspondence #1 | |
| 7 | Tsang Partnership General Correspondence #3 7/1/1993 - 12/31/1993 |
| Tsang Partnership General Correspondence #2 8/1/1992 - 6/30/1993 | |
| Tsang Partnership General Correspondence #1 9/1/1991 - 7/31/1992 | |
| Pacific Crest Contractors General Correspondence #1 3/1/1993 - 12/31/1994 | |
| Pacific Crest Contractors Contract File #1 CO11340 3/25/1993 - 8/25/1993 | |
| Telecommunications | |
| Budget 8/31/1987 - 11/10/1989 | |
| Regents Reports (empty folder) | |
| General Correspondence #3 8/1/1990 - 6/20/1991 | |
| General Correspondence #2 3/1/1988 - 9/30/1990 | |
| General Correspondence #1 12/1/1986 - 2/29/1988 | |
| Peat Marwick Main & Co. General Correspondence 5/20/1988 | |
| Peat Marwick Main & Co. Contract File C09206 2/26/1988 - 2/29/1988 | |
| Building 0680 —University Housing Apartment Project (Yakama Village) | |
| 8 | Budget 1/12/1995 - 12/8/1995 |
| Environmental linpact Statement 5/19/1994 - 6/24/1994 | |
| Regents 1/18/1994 - 3/8/1996 | |
| Attorney General Correspondence 1/31/1994 - 8/25/1994 RESTRICTED | |
| Issues and Claims 5/26/1994 - 1 1/2/1995 RESTRICTED | |
| S.R. 270 Issues 5/3/1995 - 10/18/1995 | |
| Burke/Lee Correspondence 5/25/1994 - 6/16/1994 | |
| Don Brigham Plus Associates Correspondence 6/12/1995 - 6/29/1995 | |
| Robert Fossatti Associates 8/18/1994 - 7/23/1996 | |
| HCI Howard Consultants Geotechnical Engineers 9/9/1994 - 6/21/1995 | |
| Contractor Field Reports 9/16/1994 - 10/23/1995 | |
| Walsh Daily Construction Reports 9/1994 - 6/1995 | |
| Wyatt - Jaykim Engineers Concrete Testing 9/26/1994 - 5/26/1995 | |
| E-mail General Correspondence 3/22/1994 - 2/28/1995 | |
| General Correspondence #3 1/1 1/1995 - 3/25/1998 | |
| The ORB Organization Submittals 8/30/1994 - 10/7/1994 | |
| The ORB Organization Construction Meeting Minutes 9/15/1994 - 6/29/1995 | |
| The ORB Organization General Correspondence #3 12/13/1994 - 1 1/3/1995 | |
| The ORB Organization Contract File #2 CO11640 10/10/1995 - 12/22/1995 | |
| Walsh Construction Company General Correspondence #2 8/1/1995 - 8/15/1997 | |
| Walsh Construction Company Contract File #2 COl 1778 8/23/1995 - 12/8/1995 | |
| Punch Lists 6/6/1995 - 7/24/1995 | |
| Pending Change Proposals 9/24/1994 - 9/27/1994 | |
| 9 | Kruegel - McAllister Residence Halls Infonnation |
| Step 2: Design Competition 6/7/1994 - 8/31/1994 | |
| Reference Letters 5/13/1994 - 5/16/1994 | |
| Ledcor Industries General Correspondence 8/1994 | |
| Rejected Bid Summaries — Bid Date 7/22/1994 | |
| General Correspondence #1 9/1/1994 - 12/31/1994 | |
| The ORB Organization, Inc. General Correspondence #2 9/1/1994 - 11/30/1994 | |
| The ORB Organization, Inc. General Correspondence #1 4/1/1994 - 8/31/1994 | |
| The ORB Organization, Inc. Contract File #1 CO11640 3/25/1994 - 6/30/1995 | |
| Walsh Construction Company General Correspondence #1 8/1/1994 - 7/31/1995 | |
| Walsh Construction Company Contract File #1 CO11778 8/1/1994 - 6/30/1995 | |
| Punch Lists #1 5/22/1995 - 6/15/1995 | |
| SR 270/WSU Entrance Project/University Housing Project Memo 12/16/1994 | |
| Washington State University Design Build Student Housing Proposal | |
| R.G. Nelson, Architect, and Northwest Architectural Company 5/17/1994 | |
| URS Consultants, Inc - Statement of Qualifications 2/21/1994 | |
| Design West Architects Statement of Qualifications 2/18/1994 | |
| Dames and Moore Statement of Qualifications 2/21/1994 | |
| 10 | CMA Project Management, Inc. Statement of Qualifications 2/21/1994 |
| Draft RFQ from ORB Organization 4/12/1994 | |
| The ORB Organization, Inc. Statement of Qualifications 4/17/1994 | |
| The ORB Organization, Inc. Draft Proposal & General Requirements 5/12/1994 | |
| Walsh Construction & Michael and Kuhns Statement of Qualifications 5/17/1994 | |
| Ledcor Industries Inc. Design/Build Information 5/17/1994 | |
| CTS Engineers, Inc. Traffic Study 5/1994 | |
| DEl Electrical Consultants Electrical Calculations and Specifications 9/1994 | |
| Burke/Lee Environmental Checklist 5/12/1994 | |
| Walsh Construction Co. Storm Water Pollution Prevention Program 8/26/1994 | |
| Budgetary Estimate of Telecommunications Installation 6/2/1994 | |
| Draft copy of General Conditions for WA State Facility Construction | |
| Draft copy of Modifications to General Conditions | |
| WSU 1994 Design/Build Housing Draft Program 5/6/1994 | |
| WSU 1994 Design/Build Housing Draft Part 1 of 2 5/20/1994 | |
| WSU 1994 Design/Build Housing Drat Par 2 of 2 5/20/1994 | |
| Dave Smith’s Project Notebook (Cost Estimates, Regents Info, Emergency various dates | |
| Contacts, Sub - Contractor Info, Design/Build Firms, RFQ/RFP, | |
| Schedule, Telecomm & Trans, Sanitary Sewer, Comments, Submittals, Miscellaneous, Contracts, SR 270) | |
| Building #816 - Food and Human Nutrition Facility Phase II | |
| 11 | Budget 9/25/1987 - 4/13/1993 |
| Regents 1/3/1989 - 5/7/1993 | |
| AGRA Earth and Environmental CO11569 7/11/1994 - 9/19/1994 | |
| Burke/Lee, A Joint Venture 4/18/1989 - 10/17/1989 | |
| Mahan and DeSalvo 2/7/1989 - 1/12/1990 | |
| Gifford Consultants Geotechnical Report 2/11/1991 | |
| Building Committee 1/17/1989 - 6/15/1993 | |
| Construction Reports 6/12/1990 - 6/9/1992 | |
| Pittsburgh Testing Laboratory Concrete Testing Reports 5/15/1990 - 7/27/1994 | |
| Wyatt - Jaykim Engineers Concrete Testing Reports 10/29/1987 - 9/22/1988 | |
| Test Reports 10/14/1988 - 11/6/1989 | |
| Creamery Grout Files 2/24/1993 - 4/17/1997 | |
| Creamery Equipment #2 11/3/1992 - 4/7/1994 | |
| Equipment Lists 5/16/1991 - 1/14/1992 | |
| Fluid Engineering Correspondence 8/5/1987 - 8/2/1990 | |
| Grant Applications 6/4/1989 - 1/11/1995 | |
| General Correspondence #10 9/2/1993 - 8/28/1995 | |
| Northwest Architectural Company General Correspondence 8/3/1993 - 12/19/1996 | |
| Northwest Architectural Company Contract File #2 C09293 9/20/1990 - 5/14/1996 | |
| Shea Construction General Correspondence #2 5/10/1993 - 10/4/1996 | |
| Shea Construction Contract File #4 CO10174 11/14/1991 - 3/24/1993 | |
| Monroe Machinery and Supplies Contract File #2 CO10739 10/5/1992 - 6/2/1993 | |
| Pending Change Proposals 5/14/1990 - 6/19/1992 | |
| 12 | Statements of Compliance 5/29/1990 |
| Rejected Bids - Bid Date 3/29/1990 | |
| Creamery Equipment #1 6/6/1991 - 11/2/1992 | |
| General Correspondence #9 7/1/1992 - 7/31/1993 | |
| General Correspondence #8 1/2/1992 - 6/30/1992 | |
| General Correspondence #7 8/1/1991 - 12/31/1991 | |
| General Correspondence #6 3/1/1991 - 7/31/1991 | |
| General Correspondence #5 10/1/1990 - 2/28/1991 | |
| General Correspondence #4 5/1/1990 - 9/30/1990 | |
| General Correspondence #3 1/1/1990 - 4/30/1990 | |
| General Correspondence #2 1/1/1989 - 12/31/1989 | |
| General Correspondence #1 7/1/1987 - 12/31/1988 | |
| 13 | Northwest Architectural Company General Correspondence #9 6/1/1992 - 7/3 1/1993 |
| Northwest Architectural Company General Correspondence #8 10/1/1991 - 5/31/1992 | |
| Northwest Architectural Company General Correspondence #7 2/1/1991 - 9/30/1991 | |
| Northwest Architectural Company General Correspondence #6 8/1/1990 - 1/31/1991 | |
| Northwest Architectural Company General ColTespondence #5 5/1/1990 - 7/31/1990 | |
| Northwest Architectural Company General ColTespondence #4 2/1/1990 - 4/30/1990 | |
| Northwest Architectural Company General Correspondence #3 7/1/1989 - 1/31/1990 | |
| Northwest Architectural Company General Correspondence #2 1/1/1989 - 6/30/1989 | |
| Northwest Architectural Company General Correspondence #1 7/1/1987 - 12/31/1988 | |
| 14 | Northwest Architectural Company Contract File #1 C09293 7/12/1988 - 8/27/1990 |
| Shea Construction, Inc. General Correspondence File #1 4/1/1990 - 3/31/1993 | |
| Shea Construction, Inc. Contract File #3 CO10174 6/1/1991 - 10/2/1991 | |
| Shea Construction, Inc. Contract File #2 CO10174 4/2/1991 - 6/18/1991 | |
| Shea Construction, Inc. Contract File #1 CO10174 3/22/1990 - 3/1/1991 | |
| Monroe Machinery and Supplies Creamery Installation Contract #1 CO10739 9/1/1991 - 8/31/1992 | |
| Creamery Installation Rejected Bids - Bid Date 8/24/1991 | |
| Rejected General Bids - Bid Date 9/10/1987 | |
| Rejected Electrical Bids - Bid Date 9/3/1987 | |
| Rejected Mechanical Bids - Bid Date 9/3/1987 | |
| Northwest Architectural Company Design Development Review Comments 12/7/1989 | |
| Pacific Testing Laboratories Statement of Qualifications 12/18/1989 | |
| Perspective Sketch, Site Plan, Floor Plans 8/30/1994 | |
| Photographs in blue notebook June, 1994 | |
| AGRA Earth & Environmental Evaluation of Epoxy Grout 10/19/1994 | |
| Gifford Consultants, Inc. Geotechnical Report 4/18/1989 | |
| Creamery Installation Bid Set Specifications (2) 6/28/1991 | |
| Builders’ Hardware and Supply Company Schedule of Finish Hardware 4/22/1992 | |
| Northwest Architectural Company Design Development Presentation April, 1989 | |
| Northwest Architectural Company Design Development Phase November, 1986 | |
| Northwest Architectural Company Schematic Design Phase 6/26/1986 | |
| FHN Phase II Building Program Master Copy May, 1988 | |
| APV Crepaco, Inc. Creamery Contractor Bid 3/21/1990 | |
| 15 | Northwest Architectural Company Addendum #1 3/8/1990 |
| Northwest Architectural Company Addendum #2 3/16/1990 | |
| Northwest Architectural Company Addendum #3 3/20/1990 | |
| Northwest Architectural Company Addendum #4 3/23/1990 | |
| Shea Construction, Inc. Requests For Clarification 5/11/1990 - 10/10/1991 | |
| Northwest Architectural Company Clarifications | |
| Change Proposals 4/26/1990 - 2/10/1992 | |
| Dave Smith FSHN Creamery Items from Notebook - General Correspondence, | |
| Dairy Equipment, and Equipment Bids | |
| Dave Smith FSHN Items from Notebook - A/E Fees, Budget, Equipment/Furnishings, Federal Grants, Fixed Equipment, General Correspondence, | |
| Physical Plant, Project Stats, Regents, Schedules, Telecom Cable, Telecom Center, 95% Review Comments, Review Comments | |
| Building #1500 - Dairy Forage Facility Phase II, Buckley., WA | |
| 16 | Budget 9/30/1991 - 9/28/1995 |
| Environmental Impact Statement 9/21/1992 - 12/21/1992 | |
| Regents 3/24/1989 - 11/3/1994 | |
| Bradley - Noble Geotechnical Committee 4/22/1994 | |
| Burke/Lee Correspondence 5/13/1992 | |
| Construction Materials Testing Laboratories 3/22/1994 - 10/19/1994 | |
| Building Committee 9/25/1987 - 1/20/1993 | |
| Water Line Upsize General Correspondence 2/16/1993 - 9-14-95 | |
| General Correspondence 3/3/1993 - 9/24/1997 | |
| The BJSS Group General Correspondence #2 1/24/1994 - 8/7/1995 | |
| The BJSS Group Contract File #2 CO10845 12/1/1993 - 5/31/1995 | |
| John Korsmo Construction, Inc. General Correspondence 12/14/1993 - 2/5/1996 | |
| John Korsmo Construction, Inc. COl1557 11/17/1993 - 11/1/1995 | |
| Rejected Bid Summaries Bid Date 7/1/1993 | |
| Rejected Bid Summaries ReBid Date 11/18/1993 | |
| General Correspondence #1 6/13/1990 - 12/21/1992 | |
| The BJSS Group General Correspondence #1 11/26/1991 - 12/12/1993 | |
| Building 9500 — Tri-Cities University Center Addition | |
| 17 | Master Planning various dates |
| Budget 8/31/1987 - 4/6/1993 | |
| Regents Reports 9/2/1988 - 1/8/1992 | |
| Burke/Lee Correspondence 1/6/1988 - 12/10/1990 | |
| Mahan and DeSalvo Correspondence 4/14/1989 - 1/22/1990 | |
| Concrete Testing 7/19/1990 - 3/29/199 1 | |
| General Correspondence #9 7/8/1992 - 9/23/1993 | |
| McKinley Gordon General Correspondence #15 2/1/1992 - 11/9/1992 | |
| McKinley Gordon Contract File #3 CO9110 9/11/1992 | |
| Hazen and Clark General Correspondence #2 10/1/1991 - 3/31/1993 | |
| Hazen and Clark Contract File #7 CO10126 11/20/1991 - 2/17/1993 | |
| Pending Change Proposals 11/26/1990 - 9/11/1991 | |
| Rejected Electrical Bids — Bid Date 3/13/1990 | |
| Rejected Mechanical Bids — Bid Date 3/13/1990 | |
| Rejected General Bids — Bid Date 3/20/1990 | |
| General Correspondence #8 9/1/1991 - 12/31/1992 | |
| General Correspondence #7 4/1/1991 - 8/31/1991 | |
| General Correspondence #6 11/1/1990 - 3/31/1991 | |
| 18 | General Correspondence #5 6/1/1990 - 10/31/1990 |
| General Correspondence #4 1/1/1990 - 5/31/1990 | |
| General Correspondence #3 1/1/1989 - 12/31/1989 | |
| General Correspondence #2 5/1/1988 - 12/31/1988 | |
| General Correspondence #1 1/1/1987 - 4/1/1988 | |
| McKinley Gordon General Correspondence #14 11/1/1991 - 1/31/1992 | |
| McKinley Gordon General Correspondence #13 9/1/1991 - 10/31/1991 | |
| McKinley Gordon General Correspondence #12 8/1/1991 - 8/30/1991 | |
| McKinley Gordon General Correspondence #11 6/1/1991 - 7/31/1991 | |
| McKinley Gordon General Correspondence #10 4/1/1991 - 5/31/1991 | |
| 19 | McKinley Gordon General Correspondence #9 3/1/1991 - 4/30/1991 |
| McKinley Gordon General Correspondence #8 1/1/1991 - 2/28/1991 | |
| McKinley Gordon General Correspondence #7 11/1/1990 - 12/31/1990 | |
| McKinley Gordon General Correspondence #6 9/1/1990 - 10/31/1990 | |
| McKinley Gordon General Correspondence #5 8/1/1990 - 8/31/1990 | |
| McKinley Gordon General Correspondence #4 2/1/1990 - 7/30/1990 | |
| McKinley Gordon General Correspondence #3 8/1/1989 - 2/28/1990 | |
| McKinley Gordon General Correspondence #2 1/1/1989 - 7/31/1989 | |
| McKinley Gordon General Correspondence #1 7/1/1987 - 12/31/1988 | |
| McKinley Gordon Contract File #2 CO9119 10/1/1990 - 7/31/1992 | |
| 21 | Branch Campus Development Alternatives Appendix for Chapter 7 |
| Chapter 7 Branch Campus Development WHECB 11/5/1989 | |
| Riley Engineering, Inc. Life Cycle Cost Analysis January, 1989 | |
| Dillman - Luvaas Architects Life Benefit & Life Cycle Cost Analysis | |
| McKinley Gordon WSU Tn - Cities Design Development 3/7/198 9 | |
| Material Data Safety Sheets, Miscellaneous Items various dates | |
| Draft Tri-Cities University Center Building Addition 11/24/1987 | |
| Draft Tri-Cities University Center Building Addition 12/30/1987 | |
| Draft Tri-Cities University Center Building Addition 2/8/1988 | |
| Tri-Cities University Center Building Addition 2/8/1988 | |
| Addendum to Building Program 7/1/1988 | |
| McKinley Gordon Draft Master Planning Report 5/4/1988 | |
| Draft Master Planning Report 6/1/1988 | |
| Master Planning Report 6/1/1988 | |
| McKinley Gordon Schematic Design Building Statistics 8/22/1988 | |
| McKinley Gordon Schematic Design Cost Estimate 8/22/1988 | |
| McKinley Gordon Schematic Design 9/16/1988 | |
| McKinley Gordon Field Reports 6/19/1991 - 8/14/1991 | |
| State of WA Supplemental Proposal to the Advisory Council | |
| Campus Reports various dates | |
| Joint Center for Graduate Study Faculty Handbook 11/20/1981 | |
| University Center Addition Travel Related Items | |
| 22 | University Center Addition Travel Related Items Center Grad Study - Richland |
| Department of Capital Planning and Development | |
| Commons Offices | |
| Building #0806 - Beasley Coliseum Asbestos Removal | |
| Budget 2/26/1992 - 12/02/1992 | |
| Environmental Impact Statement 1/13/1992 - 2/18/1992 | |
| Regents 10/16/1992 | |
| General Correspondence 4/29/1991 - 1/7/1994 | |
| Alpha Engineers General Correspondence 6/1991 | |
| Alpha Engineers Contract File no contents | |
| Communication Infrastructure Renewal (C.I.R.) | |
| 23 | Budget 9/17/1991 - 12/19/1995 |
| Environmental Impact Statement 3/9/1992 - 5/20/1992 | |
| Regents Reports 11/18/1991 - 5/11/1995 | |
| Burke/Lee Correspondence 4/17/1992 - 9/27/1992 | |
| Robert Fossatti Associates 11/24/1993 | |
| Mahan & DeS alvo Correspondence 3/19/1992 - 7/31/1992 | |
| Installation Operational Contract - Johnson Controls Network Integration Svcs. 6/7/1994 | |
| Program Committee 6/10/1992 - 9/30/1994 | |
| Facilities Work Group #3 10/1/1992 - 5/12/1993 | |
| Construction Reports 9/15/1993 - 9/17/1993 | |
| General Correspondence #6 7/1/1994 - 10/4/1996 | |
| JWP Information Systems, Inc. General Correspondence 4/9/1992 - 11/9/1993 | |
| JWP Information Systems, Inc. Contract File C0 10714 11/20/1992 - 12/18/1992 | |
| Inland Construction, Inc. General Correspondence 9/16/1994 - 11/18/1994 | |
| Inland Construction, Inc. Contract File CO 11790 9/1/1994 - 10/6/1994 | |
| Poe Asphalt Paving, Inc. Contract File CO 11643 8/4/1994 - 7/12/1995 | |
| Shea Construction, Inc. General Correspondence 5/24/1994 - 9/28/1994 | |
| Shea Construction, Inc. Contract File CO 11642 4/12/199 | |
| Rejected Bids - Telecomm Equipment Rooms - Bid Date 9/1/1994 | |
| Rejected Bids - Satellite Master Antennae TV - Bid Date 7/26/1994 | |
| Rejected Bids - Five Main Communication Facility - Bid Date 2/25/1994 | |
| Facilities Work Group #2 6/1/1992 - 9/30/1992 | |
| Facilities Work Group #1 12/31/1991 - 5/31/1992 | |
| General Correspondence #5 2/1/1994 - 6/30/1994 | |
| General Correspondence #4 12/1/1994 - 1/31/1994 | |
| 24 | General Correspondence # 3 7/1/1993 - 11/30/1993 |
| General Correspondence # 2 4/1/1992 - 6/30/1993 | |
| General Correspondence # 1 9/1/1990 - 2/29/1992 | |
| Program Committee File # 1 6/24/1992 - 5/31/1992 | |
| Project Management - Quality Assurance | |
| Planning and Construction Profile Surveys 1/1992 | |
| Evaluation Scoring 6/1990 - 7/1990 | |
| General Correspondence # 1 4/9/1990 - 2/25/1991 | |
| Heery Program Management General Correspondence 8/9/1990 - 8/10/1990 | |
| Heery Program Management Contract File (draft copy) 4/9/1990 | |
| Morrison Knudsen General Correspondence 10/31/1991 - 8/29/1996 | |
| Morrison Knudsen Contract File CO10465 10/29/1990 - 2/18/1993 | |
| Morrison Knudsen Letter Log 3/7/1991 - 5/23/1991 | |
| Morrison Knudsen General Correspondence # 1 7/1/1990 - 2/29/1992 | |
| Records, Maintenance Materials, Storage, and Recycling | |
| Budget Spring, 1991 - 12/12/1995 | |
| Environmental Impact Statement 5/3/1992 - 7/26/1993 | |
| Regents 5/26/1992 - 1/26/1996 | |
| Attorney General Correspondence 3/6/1996 RESTRICTED | |
| Burke/Lee Correspondence 7/9/1991 - 8/25/1992 | |
| Mahan Partnership Correspondence 11/18/1992 - 1/26/1993 | |
| Professional Services Industries, Inc. Correspondence 11/15/1994 - 1/27/1995 | |
| The Redicheck Firm Correspondence 6/6/1994 - 6/28/1994 | |
| 25 | Gifford Consultants Geotechnical Report 11/13/1992 |
| Building Committee Minutes 4/23/1991 - 3/16/1993 | |
| Daily Construction Reports 11/10/1994 - 6/30/1995 | |
| Concrete Test Reports 6/9/1995 | |
| General Correspondence #2 5/1/1994 - 5/14/1996 | |
| Archos Corporation General Correspondence #6 6/5/1995 - 5/7/1996 | |
| Archos Corporation Contract File #1 CO10803 9/27/1991 - 5/10/1996 | |
| Mark Construction, Inc. General Correspondence #1 9/1/1994 - 4/2/1997 | |
| Mark Construction, Inc. Contract File #1 CO11804 9/1/1994 - 11/6/1995 | |
| Pending Change Proposals 12/20/1994 - 11/8/1995 | |
| Rejected Bids — Bid Date 9/13/1994 | |
| General Correspondence #1 2/1/1995 - 5/31/1995 | |
| Archos Corporation General Correspondence #5 7/1/1994 - 1/31/1995 | |
| Archos Corporation General Correspondence #4 7/1/1994 - 1/31/1995 | |
| Archos Corporation General Correspondence #3 6/1/1994 - 6/31/1994 | |
| Archos Corporation General Correspondence #2 10/1/1993 - 5/31/1994 | |
| Archos Corporation General Correspondence #1 6/1/1991 - 9/30/1993 |
Archives 281
Facilities Development
Vancouver Campus Building Files and Records, 1986-1998
ACQUISITION AND PROCESSING INFORMATION
These Facilities Development Vancouver Campus Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on April 25th, 2000 (UA 2000-12) by Annie (last name unrecorded) of Facilities Development. They were reboxed for space considerations upon arrival, reducing the collection from 34 boxes to 32 without altering the order of the documents. They were processed in 2009 by University Archivist Mark O'English and Tim Mace, at which time they were further reboxed down to 29 boxes, again without altering document order.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of records from 1986-1998 covering early plans for construction of the Vancouver Campus, focused primarily on Building #6501, here listed as the General Campus Vancouver University Center. Records are maintained in their original order, in two series, each broken into two parts: general Vancouver Phase I documents, and Public Information Request Numbered Documents.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Facilities Development Vancouver Campus Building Files and Records, 1986-1998 (UA 281)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| Public Information Request Numbered Documents | |
| 1 | No. 024954 - 024982 Reduced Plans & Elevations of Design Development Drawings, 12/3/1993 |
| No. 024983 - 025012 Reduced Plans & Elevations of Design Development Drawings, 12/3/1993 | |
| No. 025013 Final Supplemental Environmental Impact Statement, 2/24/1993 | |
| No. 025014 Draft Supplemental Environmental Impact Statement, 12/2/1992 | |
| No. 025015 - 025037 Box #9 WSU - V Salmon Creek Statutory Warranty Deed, 5/14/1991 | |
| No. 025038 - 025085 ZGF Constructability Report for WSU - V, 4/20/1994 | |
| No. 025086 Estimate of Probable Construction Cost Construction Documents Phase, 5/12/1994 | |
| No. 025087 ZGF Design Development Estimate of WSU - V Campus, 12/3/1993 | |
| No. 025088 - 025 132 WSU Vancouver Value Engineering Miscellaneous Information, 1/1994 - 3/1994 | |
| No. 025133 Value Engineering Study for WSU - V Campus, 12/22/1993 | |
| No. 025134 Wetlands Report for WSU - V Clark County Campus, 1/1993 | |
| No. 025135 Storm Water Pollution Prevention Plan, 4/1994 | |
| No. 025136 Parametrix, Inc., Drainage Design WSU - V Clark County Campus, 4/1994 | |
| No. 025138 - 025337 Site Storm Drainage Information Including Baseline General Permit, Various Dates | |
| No. 025339 - 025549 ZGF WSU - V Campus Wetland Mitigation, 1/1993 | |
| No. 025550 ZGF WSU - V Master Plan Concept Development Report Volume 1 | |
| No. 025551 ZGF WSU - V Master Plan Concept Development Report Volume 2 | |
| No. 025552 ZGF WSU - V Summary Master Plan, 7/1992 | |
| No. 025553 - 025775 WSU - V Site Proposal No. 10 and Miscellaneous Site Proposal No. 10 Information, 1989 | |
| No. 025756 - 025 820 ZGF WSU - V Consultant Selection — 1991 Phase I Campus Development | |
| No. 025821 ZGF Phase I Campus Development Interview Statement of Qualifications, 6/1991 | |
| No. 025822 - 025 866 WSU - V Aerial Topography (Walker and Associates), Various Dates | |
| No. 025867 - 02602 1 WSU - V Cultural Resource Survey, Various Dates | |
| No. 026022 - 026047 Environmental Audit, Various Dates | |
| No. 026048 ZGF Phase I Campus Development Preliminary Design Onsite and Offsite Infrastructure Work, 9/1993 | |
| No. 026049 ZGF Phase I Campus Development Classroom Bldg., Library, Student Services, and Physical Plant Building Schematic Design, 10/1993 | |
| No. 026052 Capital Project Review Submittal - Allotment Request for Construction, 5/16/1994 | |
| No. 026053 Branch Campus Interim Planning Report, 9/20/1989 | |
| No. 026054 Supplemental Site Data, 8/3/1990 | |
| 2 | No. 026055 ZGF 100% Design Development Specifications Divisions 2 through 16, 12/3/1993 |
| No. 026056 - 026063 ZGF 75% Construction Documents Submittal Divisions 2 through 14, 2/25/1994 | |
| No. 026064 ZGF 75% Construction Documents Submittal Divisions 15 and 16, 2/21/1994 | |
| No. 026065 ZGF Preliminary Diffuser & Grille, Plumbing, Classroom Bldg. Equip. & Load Calc., Student Services Bldg. Equip. & Load Calc., Library Equip. & Load Calc., Physical Plant Equip. & Load Calc. (Part of 75% CD Submittal), 2/21/1994 | |
| No. 026066 ZGF Preliminary Electrical Load Calc., Electrical Equip., Luminaire Selections, Telecom Equipment & Calculations (Part of 75% CD Submittal), 2/21/1994 | |
| No. 026067 Kramer Gehlen Associates Student Services Building Computations & Structural Engineering, 3/25/1994 | |
| No. 026068 Kramer Gehlen Associates Landscape Retaining Wall Computations & Structural Engineering, 4/4/1994 | |
| No. 026069 Kramer Gehlen Associates Physical Plant Building Computations & Structural Engineering, 3/25/1994 | |
| No. 026070 Kramer Gehlen Associates Library Building Computations & Structural Engineering, 3/25/1994 | |
| No. 026071 Kramer Gehlen Associates Classroom Building Computations & Structural Engineering, 3/25/1994 | |
| Phase I | |
| Vancouver Campus Master Plan Appendix | |
| Site Selection Information Pertaining to the Site Selection Process & Sites #2, 4, 8, 10, and 12, 3/5/1990 | |
| WSU - V Draft Environmental Impact Statement, 6/22/1990 | |
| WSU - V Draft Environmental Impact Statement Comment Letters, Various Dates | |
| WSU Southwest Washington Public Hearing Transcript, 7/17/1990 | |
| WSU Southwest Washington Scoping Notice Comments, Various Dates | |
| 3 | WSU - V Site Selection Final Environmental Impact Statement, 8/30/1990 |
| WSU Southwest Washington Environmental Impact Statement Information | |
| WSU Southwest Washington Site Proposal Summaries, 1989 | |
| WSU Southwest Washington Petitions, Sites 4, 8, and 10, 3/23/1990 | |
| WSU Vancouver Site Selection HECB Activity, 1990 | |
| WSU Southwest Washington Campus Phase 1 Public Involvement Report Volume 1, 6/1990 | |
| WSU Southwest Washington Campus Phase 1 Public Involvement Report Volume 2, 8/1990 | |
| 4 | WSU Vancouver Miscellaneous (Public Involvement, Site Costs, Microwave Access, Agricultural Land Issues, Technical Advisory Group, Other Sites, Site Sequence, Site Descriptions, Supplemental Site Data Report, SRC Final Report, Descriptions of 9 Sites, Descriptions of 14 Sites, and Enrollment Projections), Various Dates |
| WSU Southwest Washington Addendum (FEIS) Comments and Responses, Various Dates 1990 | |
| WSU Vancouver Site Selection Miscellaneous Information, Various Dates | |
| HBHS Asbestos Circumstances, Various Dates | |
| Site 8 Central Park, Various Dates | |
| Port Real Estate Corporation Proposal Form SW Washington Campus Intersection of 1 - 5/1 - 205 | |
| Transmittal to Port Real Estate Corp. from Earl Muir Re: Site No. 1 Proposal, 11/21/1989 | |
| Site 12 Mill Plain | |
| City of Vancouver Proposal for WSU SW WA Campus, Initial 8, 11/17/1989 | |
| City of Vancouver Proposal for WSU SW WA Campus, Supplemental 8, 11/17/1989 | |
| City of Vancouver Proposal for WSU SW WA Campus Presentation to the Higher Education Coordinating Board, 10/23/1990 | |
| Law Offices of Williams Kastner and Gibbs Re: Branch Campus Site Proposal, 9/22/1989 | |
| Law Offices of Williams Kastner and Gibbs Initial 12 Branch Campus Site Proposal | |
| Law Offices of Williams Kastner and Gibbs Supplemental 12 Branch Campus Site Proposal | |
| Law Offices of Williams Kastner and Gibbs Supplemental 13 Branch Campus Site Proposal | |
| Checklist Form for Initial Site Proposal, Ruth Henderson, Proponent, 9/21/1989 | |
| Checklist Form for Initial Site Proposal, W, Ken Lillequist, Proponent, 9/21/1989 | |
| Richard Woods and Dennis Weber Proposal Form - Initial Submittal Site for SW WA Campus 8/16/1989 | |
| Supplemental Proposal East Clark County Tektronix Site, 11/17/1989 | |
| 5 | A Proposal for Site Selection WSU Battleground by Citizen’s Group of Battle Ground, |
| Supplemental Submittal WSU Battleground by Citizen’s Group of Battle Ground | |
| Initial Proposal Site for SW WA Campus WSU, Ridgefield Sitting Committee | |
| Supplemental Proposal Site for SW WA Campus WSU, Ridgefield Sitting Committee | |
| Whitfield - Bernhardt, Inc. Site Submittal for SW WA Campus | |
| Whitfield - Bernhardt, Inc. Supplemental Site Submittal for SW WA Campus | |
| James F. Fowler & Associates Initial Proposal Site #3 for WSU SW WA Campus | |
| James F. Fowler & Associates Supplemental Proposal Site #3 for WSU SW WA Campus | |
| East Clark County Site Recommendation Committee Proposal | |
| WSU Vancouver Site Selection Process Information for HECB | |
| WSU Vancouver Proposal Information | |
| WSU Southwest Washington Public Meetings | |
| WSU Vancouver Background Information, Schedules, Site Comparison, Selection Criteria, Miscellaneous | |
| WSU Vancouver Site Selection Criteria, RFP Information | |
| WSU Vancouver Committee Meeting Notes | |
| WSU Vancouver RFP Materials, Proposal Evaluations, Meetings with Qualified Proponents, Site Visits, Proponent Interviews, Final SRC Report, Academic Committee Report, Regents Recommendation, and HECB Decision. 1 of 2. | |
| 6 | WSU Vancouver RFP Materials, Proposal Evaluations, Meetings with Qualified Proponents, Site Visits, Proponent Interviews, Final SRC Report, Academic Committee Report, Regents Recommendation, and HECB Decision. 2 of 2 |
| WSU Vancouver Burke/Lee Research (1st Segment Services) | |
| WSU Vancouver Burke/Lee | |
| WSU Southwest Washington Letters 1/1988 - 3/1990 | |
| WSU Southwest Washington Letters 4/1990 - 6/1990 | |
| WSU Southwest Washington Letters 7/1990 - 9/1990 | |
| WSU Southwest Washington Letters 1/1988 - 6/1990 | |
| WSU Southwest Washington Petitions Site 12 - Volume 1 | |
| WSU Southwest Washington Petitions Site 12 - Volume 2 | |
| 7 | WSU Southwest Washington News Items |
| WSU College of Engineering & Architecture “An Addition for the SW WA Joint Center for Education & WSU - V At the Evergreen State College Building in Vancouver”, Fall 1986 and Spring 1987 | |
| Social & Economic Sciences Research Center “WSU - V Higher Education Needs Assessment Survey Summary Report”, 3/1988 | |
| WSU Development Plan for Campuses in Spokane, Tri - Cities, and Vancouver, 5/1988 | |
| WSU - V and Clark College Bauer Hall Second Phase Building Program Project No. 88030, 6/1988 | |
| 7.0 Estimation of Branch Campus Needs, undated | |
| Burke/Lee “WSU at Vancouver Branch Campus Interim Planning Report”, 9/1989 | |
| MGT of America, Inc., SRI International & Elaine Day and Associates “Branch Campus Development Alternatives: Appendix for Chapter 7”, 11/1989 | |
| Burke/Lee “WSU Vancouver Alternative Sites Preliminary Environmental Report”, 1/1990 | |
| Burke/Lee “Draft Environmental Impact Statement WSU Branch Campus SW WA, Phase I - Site Selection”, 6/1990 | |
| Burke/Lee “WSU Southwest Washington Branch Campus Supplemental Site Data”, 8/1990 | |
| Burke/Lee “WSU Southwest Washington Branch Campus Alternate Site Graphics”, 8/1990 | |
| Burke/Lee “Final Environmental Impact Statement”, 8/1990 | |
| Burke/Lee “WSU - V Response to Higher Education Coordinating Board Questions 10/10/1990” | |
| Physical Planning Committee “Phase I Building Program - Classroom Building, Library Building, Student Services & Classroom Building”, 2/1992 | |
| ZGF “WSU - V Campus Master Plan Concept Development Report” Volume I, 5/1992 | |
| ZGF “Washington State University Vancouver Campus Summary Master Plan”, 6/1992 | |
| ZGF “Washington State University Vancouver Campus Summary Master Plan”, 7/1992 | |
| JD White Co. “Draft Supplemental Environmental Impact Statement for WSU at Vancouver, WA”, 12/1992 | |
| JD White Co. “Conditional Use Request Washington State University at Vancouver”, undated | |
| Hazcon, Inc. Asbestos Investigative Survey, 1/1993 | |
| JD White Co. “Final Supplemental Environmental Impact Statement for Washington State University at Vancouver, WA”, 2/1993 | |
| WSU Vancouver Predesign Study Draft Review, 4/1993 | |
| ZGF Phase I Campus Development Classroom Bldg., Library Bldg., Student Services and Classroom Bldg. Predesign Study, 5/1993 | |
| Clark Public Utilities Industrial Customer Information, 5/1993 | |
| ZGF Phase I Campus Development Preliminary On Campus & Off - Site Infrastructure Design, 6/1993 | |
| ZGF Phase I Campus Development Preliminary Design Onsite & Offsite Infrastructure Work 6/1993 | |
| Pemco Underground Storage Tank Site Characterization Report prepared for WA Dept of Ecology 6/1993 | |
| Parametrix, Inc. NE 134th St. & NE Salmon Creek Ave. Reconstruction Design Report 9/1993 | |
| JD White Co. Notice of Public Hearing - Variance to Height Limitation Standards of the Single Family Residential Zoning Dist. 9/1993 | |
| ZGF WSU Vancouver Campus Phase I Schematic Design Estimate 10/1993 | |
| 8 | Parametrix, Inc., Water Resource Evaluation of Salmon Creek Property 10/1993 |
| Parametrix, Inc., NE 134th St & Salmon Creek Ave. Reconstruction Design Report 10/1993 | |
| Consulting Value Specialists Inc., Value Engineering Study for WSU Vancouver Campus 12/1993 | |
| ZGF Design Development Estimate or WSU Vancouver Campus Phase I - CSI Format 12/1993 | |
| Vancouver Master Plan Appendix, undated | |
| PAE Consulting Engineers, Inc., WSU - V Campus Energy Conservation Report 1/1994 | |
| ZGF Drainage Report for WSU - V Phase I, 1/1994 | |
| Pinnell Busch, Inc., Combined Sewer Overflow Program Management Subconsultant Team 2/1994 | |
| PAE Consulting Engineers, Inc., WSU - V Campus Energy Conservation Report 3/1994 | |
| LaSalle Manufacturing Corp., Air Handling Units | |
| Vulcan Hydraulic Heating Equipment | |
| JD White Co., Wetlands Mitigation for WSU - V Campus Clark County, WA Phase I Final Mitigation Plan 4/1994 | |
| Geotechnical Resources Inc., Supplemental Geotechnical Investigation, WSU Vancouver Campus 5/1994 | |
| ZGF Estimate of Probable Construction Cost Construction Documents Phase WSU - V Campus CSI Format 5/1994 | |
| Heery International WSU - V Campus Construction Phase Procedures Manual 8/1994 | |
| Parametrix, Inc., Drainage Design Report 10/1994 | |
| JD White Co., Wetland Delineation for NE 134th St & NE Salmon Creek Ave Road Improvements 10/1994 | |
| JD White Co., Wetlands Mitigation for NE 134th St & NE Salmon Creek Ave Road Imp., Phase I Preliminary Mitigation Plan 11/1994 | |
| Parametrix, Inc., Storm water Pollution Prevention Plan NE 134th St & NE Salmon Creek Ave Road Improvements 12/1994 | |
| Parametrix, Inc., Drainage Design Report NE l34 St & NE Salmon Creek Ave Road Improvements 12/1994 | |
| Heery International, Inc., WSU - V Branch Campus Dispute Review Board Informal Hearing on Constructive Acceleration 1994 - 10/1995 | |
| Prezant IAQ Flush Report 10/1996 | |
| Prezant Vancouver Campus Mold Sampling January 22, 1997 | |
| WSU Vancouver Phase I Campus Development Project Program, undated | |
| Parametrix, Inc., Fifteen Year Water Resource Plan 5/1997 | |
| Public Information Request Numbered Documents> | |
| WSU Vancouver Environmental Impact Statement #1 4/1/1990 - 7/6/1990 | |
| 9 | WSU Vancouver Environmental Impact Statement #2 7/17/1990 - 7/23/1990 |
| WSU Vancouver Environmental Impact Statement #3 7/24/1990 - 8/31/1990 | |
| WSU Vancouver Environmental Impact Statement #4 9/1/1990 | |
| WSU Vancouver Burke/Lee, A Joint Venture #1 7/1989 - 9/1989 | |
| WSU Vancouver Burke/Lee, A Joint Venture #2 10/1989 - 4/30/1990 | |
| WSU Vancouver Burke/Lee, A Joint Venture #3 6/1/1990 - 8/31/1990 | |
| WSU Vancouver Burke/Lee, A Joint Venture #4 9/1/1990 - 10/1992 | |
| WSU Vancouver Site Proponents & Proponent General Information #1 8/1989 - 12/31/1989 | |
| WSU Vancouver Site Proponents & Proponent General Information #2 1/1990 - 5/16/1990 | |
| WSU Vancouver Phase I Notes from Meetings - Earl Muir 5/1988 - 7/1990 | |
| WSU Vancouver Phase I Site Plan Review 11/5/1993 - 2/1994 | |
| WSU Vancouver Phase I HECB Off - Campus Property Acquisition 1/22/1992 | |
| WSU Vancouver Phase I Bauer Hall 4/1988 - 8/2/1990 | |
| 10 | WSU Vancouver Phase I S.E.I.S. #1 2/1992 - 2/1993 |
| WSU Vancouver Phase I S.E.I.S. #2 3/1993 - 6/1993 | |
| WSU Vancouver Phase I General Sitting Information #4 11/1990 - 12/1990 | |
| WSU Vancouver Phase I General Sitting Information #3 12/1/1989 - 10/31/1990 | |
| WSU Vancouver Phase I General Sitting Information #2 1/18/1989 - 11/21/1989 | |
| WSU Vancouver Phase I General Sitting Information #1 9/12/1988 - 12/13/1988 | |
| WSU Vancouver Phase I Budget | |
| WSU Vancouver Phase I Regents’ Reports 10/1989 - 8/1990 | |
| WSU Vancouver Phase I Parametrix, Inc. CO11148 7/1/1992 - 5/20/1997 | |
| WSU Vancouver Phase I Site Demolition & Cleanup Parametrix, Inc. 4/1992 - 5/1994 | |
| WSU Vancouver Phase I Demolition 8/1/1992 - 7/19/1993 | |
| WSU Vancouver Phase I Predesign 3/1993 - 6/1993 | |
| WSU Vancouver Phase I Master Plan # 2 6/1/1992 - 6/23/1993 | |
| WSU Vancouver Phase I Master Plan #1 3/1992 - 5/31/1992 | |
| WSU Vancouver Phase I Master Plan Project Program 1/1992 - 5/1992 | |
| WSU Vancouver Phase I Archeological Investigation 1992 | |
| 11 | WSU Vancouver Phase I Bookstore 12/11/1993 - 8/31/1996 |
| WSU Vancouver Phase I Soils Report - Geotechnical Resources, Inc., various dates (1993) | |
| WSU Vancouver Phase I Background Information (project description, principles, planning concepts, prototype analysis, administrative & planning information, capacity, design criteria, budget requests, funding, space requirements, interim planning report space, HECB report excerpts, site issues, road improvements, transit, infrastructure, geotechnical, storm drainage, wetlands, energy considerations, urban growth area, BPA) | |
| WSU Vancouver Phase I Planning/Building Committee #2 10/5/1992 - 5/1997 | |
| WSU Vancouver Phase I Planning/Building Committee #1 8/1991 - 9/1992 | |
| WSU Vancouver Phase I Site Work and Building Construction Rejected Bid Forms - Bid Date 6/22/1994 | |
| WSU Vancouver Phase I Heery Program Management CO11678 2/1992 - 7/1994 | |
| WSU Vancouver Phase I Heery International, Inc. General Correspondence #1 2/1992 - 7/31/1994 | |
| WSU Vancouver Phase I Off - Site Road 10/1993 - 11/30/1994 | |
| WSU Vancouver Phase I General Correspondence #22 7/1994 - 9/1994 | |
| WSU Vancouver Phase I General Correspondence #21 5/1/1994 - 6/30/1994 | |
| WSU Vancouver Phase I General Correspondence #20 3/1/1994 - 4/30/1994 | |
| 12 | WSU Vancouver Phase I General Correspondence #19 2/15/1994 - 3/1/1994 |
| WSU Vancouver Phase I General Correspondence #18 1/1/1994 - 2/14/1994 | |
| WSU Vancouver Phase I General Correspondence #17 11/1/1993 - 12/31/1993 | |
| WSU Vancouver Phase I General Correspondence #16 10/1/1993 - 10/31/1993 | |
| WSU Vancouver Phase I General Correspondence #15 8/1/1993 - 9/30/1993 | |
| WSU Vancouver Phase I General Correspondence #14 3/1/1993 - 7/31/1993 | |
| WSU Vancouver Phase I General Correspondence #13 12/1/1992 - 2/29/1993 | |
| WSU Vancouver Phase I General Correspondence #12 8/1/1992 - 11/1992 | |
| WSU Vancouver Phase I General Correspondence #11 5/1992 - 7/31/1992 | |
| WSU Vancouver Phase I General Correspondence #10 3/16/1992 - 4/30/1992 | |
| 13 | WSU Vancouver Phase I General Correspondence #9 2/1992 - 3/15/1992 |
| WSU Vancouver Phase I General Correspondence #8 1/1/1992 - 1/31/1992 | |
| WSU Vancouver Phase I General Correspondence #7 10/1/1991 - 11/30/1991 | |
| Vancouver Phase I General Correspondence #6 3/1/1991 - 9/30/1991 | |
| WSU Vancouver Phase I General Correspondence #5 9/1/1990 - 2/28/1991 | |
| WSU Vancouver Phase I General Correspondence #4 4/1990 - 8/31/1990 | |
| WSU Vancouver Phase I General Correspondence #3 11/1989 - 3/31/1990 | |
| WSU Vancouver Phase I General Correspondence #2 1/1989 - 10/1989 | |
| WSU Vancouver Phase I General Correspondence #1 7/1986 - 12/198 8 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #18 7/1994 - 8/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #17 6/1994 | |
| 14 | WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #16 5/16/1994 - 5/31/1994 |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #15 4/16/1994 - 5/15/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #14 4/1/1994 - 4/15/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #13 3/11/1994 - 3/31/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #12 2/17/1994 - 3/10/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #11 2/1/1994 - 2/16/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #10 1/1/1994 - 1/31/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #9 12/1/1993 - 12/31/1993 | |
| 15 | WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #8 11 / 1/1993 - 11/30/1993 |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #7 9/15/1993 - 10/31/1993 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #6 8/2/1993 - 9/14/1993 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #5 4/1/1993 - 7/30/1993 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #4 2/1/1993 - 3/31/1993 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #3 7/1/1992 - 1/31/1993 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #2 3/1991 - 6/30/1992 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership General Correspondence #110/1991 - 2/29/1992 | |
| 16 | WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #6 6/1994 - 1/1995 |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #5 4/1994 - 5/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #4 1/1/1994 - 3/31/1994 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #3 7/1/1993 - 12/31/1993 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #2 8/31/1992 - 6/30/1993 | |
| WSU Vancouver Phase I Zimmer Gunsul Frasca Partnership CO10797 #1 9/1991 - 10/1992 | |
| WSU Vancouver Phase I Attorney General Correspondence 5/1990 - 6/1994 RESTRICTED | |
| WSU Vancouver Phase I Consultant Selection (Project Management, Construction Administration) 2/1994 - 5/1994 | |
| WSU Vancouver Phase I Consultant Selection (Request for Qualification) 3/1/1994 - 3/11/1994 | |
| WSU Vancouver Phase I Consultant Selection (Request for Proposals) 4/24/1994 - 4/29/1994 | |
| WSU Vancouver Phase I Consultant Selection (Interviews) 1994 | |
| WSU Vancouver Phase I Consultant Selection (PM/CA Services Applicant Log) 2/1994 | |
| WSU Vancouver Phase I Consultant Selection (Miscellaneous Correspondence) 2/11/1994 - 4/29/1994 | |
| WSU Vancouver Phase I Consultant Selection (Project Management Questions & Responses) 3/1994 | |
| WSU Vancouver Phase I Consultant Selection (Acceptance/Rejection Letters) 3/17/1994 - 4/1/1994 | |
| 17 | Phase I |
| WSU Vancouver Phase I Campus Development Budget 8/1/1995 - 1/5/1998 | |
| WSU Vancouver Phase I Campus Development E.T.S. Off - Site Roadwork 9/1994 - 12/1994 | |
| WSU Vancouver Phase I Campus Development Final Supplemental Environmental Impact Statement 2/24/1993 | |
| WSU Vancouver Phase I Campus Development Draft Supplemental Environmental Impact Statement | |
| WSU Vancouver Phase I Campus Development Regents Reports 6/1992 - 9/1998 | |
| WSU Vancouver Phase I Campus Development Attorney General Correspondence 8/1994 - 10/1994 RESTRICTED | |
| WSU Vancouver Phase I Campus Development Issues and Claims #3 6/1997 - 7/1998 RESTRICTED | |
| WSU Vancouver Phase I Campus Development Minor Capital Improvement Request E-mail 4/5/1996 - 6/26/1996 | |
| WSU Vancouver Phase I Campus Development Capital Improvement Program E-mail 4/17/1996 - 1/23/1997 | |
| WSU Vancouver Phase I Campus Development Minor Capital Improvement Request 4/5/1996 - 4/16/1996 | |
| WSU Vancouver Phase I Campus Development Capital Improvement Program 3/14/1996 | |
| WSU Vancouver Phase I Campus Development Clark County Public Works Dept. Offsite Inspection Consultant | |
| WSU Vancouver Phase I Campus Development Disputes Review Board #2 8/1/1996 - 5/15/1997 | |
| WSU Vancouver Phase I Campus Development Norman C. Anderson, Quadrant II, Inc. CO1 1932 #1 3/23/1995 - 12/23/1997 | |
| WSU Vancouver Phase I Campus Development James B. Donaldson CO11931 2/17/1995 - 3/3/1998 | |
| WSU Vancouver Phase I Campus Development J.D. White Company, Inc., General Correspondence #1 7/1997 - 10/1998 | |
| WSU Vancouver Phase I Campus Development J.D. White Company, Inc., CO13085 10/13/1998 | |
| WSU Vancouver Phase I Campus Development J.D. White Company, Inc., CO12623 5/28/1997 | |
| WSU Vancouver Phase I Campus Development Heery International E-mail Correspondence #2 6/1/1996 - 6/20/1997 | |
| WSU Vancouver Phase I Campus Development Heery International CO11702 4/1/1997 - 4/13/1998 | |
| WSU Vancouver Phase I Campus Development Heery International General Correspondence 5/1997 - 12/1997 | |
| WSU Vancouver Phase I Campus Development Philip Wickstrand Dufford CO12700 10/1996 - 6/1997 | |
| WSU Vancouver Phase I Campus Development Paul E. Pederson CO121 16 10/15/1995 - 7/198/1997 | |
| WSU Vancouver Phase I Campus Development Robert E. Bayley Construction, Inc. CO12676 5/6/1997 - 6/27/1997 | |
| WSU Vancouver Phase I Campus Development Stanton Phillip Beck CO12699 3/10/1997 - 9/4/1997 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca Partnership CO12273 4/27/1996 | |
| WSU Vancouver Phase I Campus Development Partnering Executive Committee 4/1995 - 5/1995 | |
| WSU Vancouver Phase I Campus Development Walsh Claim General Correspondence 4/1997 - 2/1998 | |
| WSU Vancouver Phase I Campus Development Conditional Use Permit 6/1993 - 12/1996 | |
| WSU Vancouver Phase I Campus Development Bookstore E-mail 7/30/1995 - 6/18/1997 | |
| WSU Vancouver Phase I Campus Development Bookstore #2 General Correspondence 9/1/1996 - 9/199/1997 | |
| WSU Vancouver Phase I Campus Development Parametrix General Correspondence #112/14/1994 - 7/17/1997 | |
| 18 | WSU Vancouver Phase I Campus Development Carlson Testing, Inc. #2 3/1/1995 - 6/19/1995 |
| WSU Vancouver Phase I Campus Development Off - Site Road Improvements General Correspondence E-mail 1/21/1996 - 4/199/1997 | |
| WSU Vancouver Phase I Campus Development Off - Site Road Improvements General Correspondence #6 1/1/1997 - 5/15/1997 | |
| WSU Vancouver Phase I Campus Development Nutter Underground Utilities Co., Inc. General Correspondence 4/1995 - 5/1998 | |
| WSU Vancouver Phase I Campus Development Nutter Underground Utilities Co., Inc. CO11970 4/1995 - 5/1996 | |
| WSU Vancouver Phase I Campus Development U - District Ordinance 4/14/1994 - 9/13/1994 | |
| WSU Vancouver Phase I Campus Development Water Resource Evaluation 8/1993 - 6/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence E-mail #3 3/3/1997 - 6/26/1997 | |
| WSU Vancouver Phase I Campus Development General Correspondence #34 6/1/1997 - 11/199/1998 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca General Correspondence E-mail 1/1/1996 - 6/3/1997 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca General Correspondence #34 6/1997 - 12/1997 | |
| WSU Vancouver Phase I Campus Development Indoor Air Quality Mold Sampling 1/22/1997 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca Final Air Flow Study 5/22/1994 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 5/1/1997 - 1/13/1998 | |
| WSU Vancouver Phase I Campus Development Pease and Sons, Inc. General Correspondence E-mail 11/4/1995 - 12/3/1996 | |
| WSU Vancouver Phase I Campus Development Pease and Sons, Inc. General Correspondence #5 11/1/1996 - 8/1998 | |
| WSU Vancouver Phase I Campus Development Pease and Sons, Inc. Unnumbered Contract Change Proposals 1/29/1997 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #195 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #194 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #193 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #192 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #190 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #189 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #188 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #187 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #186 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #185 | |
| WSU Vancouver Phase I Campus Development Contract Change Proposal #183 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #184 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #181 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #180 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #179 | |
| 19 | Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #178 |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #177 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #176 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #175 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #174 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #173 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #172 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #171 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #170 | |
| WSU Vancouver Phase I Campus Development Site Work & Buildings Construction General Information Notebook 3/17/1997 | |
| WSU Vancouver Phase I Campus Development Site Work & Buildings Construction ZGF Consultant Agreement Notebook 3/17/1997 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #164 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #148 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #130 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #129 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #128 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #122 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #121 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #119 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #118 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #117 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #116 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #115 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #114 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #113 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #112 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #111 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #110 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #109 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #108 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #107 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #106 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #105 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #104 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #103 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #101 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #099 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #098 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #097 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #096 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #095 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #094 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #093 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #092 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #089 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #088 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #086 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #085 | |
| Pease and Sons, Inc.., WSU Vancouver Phase I Campus Development Contract Change Proposal #084 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #084 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #082 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #079 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #078 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #077 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #076 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #075 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #074 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #073 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #072 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #070 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #068 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #067 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #169 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #167 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #166 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #165 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #163 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #162 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #160 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #159 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #158 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #157 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #156 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #155 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #154 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #153 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #152 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #151 | |
| 20 | Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #150 |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #149 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #148 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #147 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #146 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #145 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #144 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #143 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #142 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #140 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #139 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #138 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #137 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #136 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #135 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #134 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #133 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #132 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #131 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #127 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #126 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #125 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #124 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #123 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #066 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #062 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #061 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #060 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #059 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #056 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #053 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #052 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #048 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #036 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #032 | |
| Pease and Sons, Inc., WSU Vancouver Phase I Campus Development Contract Change Proposal #023 | |
| WSU Vancouver Phase I Campus Development NE Salmon Creek Avenue Reconstruction Rejected Bids - Bid Opening 3/31/1995 | |
| WSU Vancouver Phase I Campus Development Issues/Claims #2 4/11/1997 - 5/1997 RESTRICTED | |
| Vancouver Phase I Campus Development Issues/Claims #1 8/22/1996 - 4/10/1997 RESTRICTED | |
| WSU Vancouver Phase I Campus Development Disputes Review Board #112/1994 - 7/31/1996 | |
| WSU Vancouver Phase I Campus Development Heery International #3 CO11702 6/1/1996 - 3/31/1997 | |
| WSU Vancouver Phase I Campus Development Heery International #2 CO11702 1/1/1996 - 5/31/1996 | |
| WSU Vancouver Phase I Campus Development Heery International #1 CO11702 6/27/1994 - 12/31/1995 | |
| 21 | WSU Vancouver Phase I Campus Development Carlson Testing, Inc. #1 8/1994 - 2/1995 |
| WSU Vancouver Phase I Campus Development General Correspondence #2 E-mail 6/1/1996 - 2/24/1997 | |
| WSU Vancouver Phase I Campus Development General Correspondence #1 E-mail 8/5/1994 - 5/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence #33 1/1/1997 - 5/31/1997 | |
| WSU Vancouver Phase I Campus Development General Correspondence #32 9/1/1996 - 12/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence #31 6/1/1996 - 8/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence #30 2/1/1996 - 5/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence #29 11/16/1995 - 1/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence #28 9/1/1995 - 11/15/1995 | |
| 22 | WSU Vancouver Phase I Campus Development General Correspondence #27 8/1/1995 - 8/31/1995 |
| WSU Vancouver Phase I Campus Development General Correspondence #26 6/1/1995 - 7/31/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence #25 4/1/1995 - 5/31/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence #24 12/1/1994 - 3/31/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence #23 10/1994 - 11/30/1994 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #40 2/1/1997 - 5/1997 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #39 1/1/1997 - 1/31/1997 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #38 12/1/1996 - 12/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #37 11/16/1996 - 11/30/1996 | |
| 23 | WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #36 10/24/1996 - 11/15/1996 |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #35 10/1/1996 - 10/23/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #34 8/17/1996 - 9/30/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #33 8/1/1996 - 8/16/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #32 7/16/1996 - 7/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #31 6/16/1996 - 7/15/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #30 5/16/1996 - 6/15/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #29 4/16/1996 - 5/15/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #28 4/1/1996 - 4/15/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #27 3/16/1996 - 3/31/1996 | |
| 24 | WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #26 3/1/1996 - 3/15/1996 |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #25 3/12/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #24 2/14/1996 - 2/29/1996 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #23 2/21/1996 - 2/23/1996 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #22 2/1/1996 - 2/20/1996 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #21 1/11/1996 - 1/31/1996 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #20 12/16/1995 - 1/10/1996 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #19 12/1/1995 - 12//15/1995 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #18 11/1/1995 - 11/30/1995 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #17 10/16/1995 - 10/31/1995 | |
| 25 | Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #16 10/1/1995 - 10/15/1995 |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #15 9/1/1995 - 9/30/1995 | |
| Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #14 9/1/1995 - 9/15/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #13 8/23/1995 - 8/31/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #12 8/1/1995 - 8/22/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #11 7/1/1995 - 7/31/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #10 6/1/1995 - 6/30/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #9 4/1/1995 - 5/1/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #8 2/16/1995 - 3/31/1995 | |
| 26 | WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #7 1/16/1995 - 2/15/1995 |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #6 12/16/1994 - 1/15/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #5 12/1/1994 - 12/15/1994 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #4 11/16/1994 - 11/30/1994 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #3 10/1/1994 - 11/15/1994 | |
| WSU Vancouver Phase I Campus Development General Correspondence Heery International, Inc., #2 8/1/1994 - 9/30/1994 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #33 2/1/1997 - 5/1997 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #32 11/1/1996 - 1/31/1997 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #31 10/16/1996 - 10/31/1996 | |
| 27 | WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #30 6/1/1996 - 10/15/1996 |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #29 4/1/1996 - 5/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #27 12/1/1995 - 1/31/1996 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #26 10/16/1995 - 11/30/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #25 8/16/1995 - 10/15/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #24 6/1/1995 - 8/15/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #23 4/1/1995 - 5/31/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #22 2/1/1995 - 3/31/1995 | |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #21 12/16/1994 - 1/31/1995 | |
| 28 | WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #20 11/1/1994 - 12/15/1994 |
| WSU Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #19 9/1994 - 10/31/1994 | |
| WSU Vancouver Phase I Campus Development Pease and Sons CO11751 #38/1/1995 - 1/31/1996 | |
| WSU Vancouver Phase I Campus Development Heery International E-mail 8/26/1995 - 5/31/1996 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #13 8/1/1996 - 4/30/1997 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #12 4/1/1996 - 7/1/1996 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #111/1/1996 - 3/31/1996 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #10 10/1995 - 12/31/1995 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #9 8/1995 - 9/1995 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #8 5/1995 - 7/1995 | |
| WSU Vancouver Phase I Campus Development Zimmer Gunsul Frasca CO10797 #7 2/1995 - 4/1995 | |
| 29 | Vancouver Phase I Campus Development General Correspondence Zimmer Gunsul Frasca #28 2/1/1996 - 3/31/1996 |
| WSU Vancouver Phase I Campus Development Off - Site Road Improvements #5 9/1/1996 - 12/31/1996 | |
| WSU Vancouver Phase I Campus Development Off - Site Road Improvements #4 1/1/1996 - 8/31/1996 | |
| WSU Vancouver Phase I Campus Development Off - Site Road Improvements #3 4/1/1995 - 12/31/1995 | |
| WSU Vancouver Phase I Campus Development Off - Site Road Improvements #2 9/1994 - 3/31/1995 | |
| WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #4 5/1/1996 - 10/31/1996 | |
| WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #3 11/1/1995 - 4/30/1996 | |
| WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #2 8/1/1995 - 10/31/1995 | |
| WSU Vancouver Phase I Campus Development Pease and Sons, Inc., General Correspondence #1 6/1/1994 - 7/31/1995 | |
| WSU Vancouver Phase I Campus Development Public Information Requests 7/1995 - 9/1997 |
Archives 282
Facilities Development
Building Files and Records, 1978-1996
ACQUISITION AND PROCESSING INFORMATION
These Facilities Development Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on July 31st, 1998 (UA 1998-16) by Anne Clark of Facilities Development. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few campus-wide items located at the end. Buildings included here include Fulmer Hall and Carpenter Hall.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Facilities Development Building Files and Records, 1978-1996 (UA 282)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| Building #0003 - Fulmer Hall (Phase I and II) | |
| 1 | Budget 12/1981 - 10/1985 |
| Affirmative Action Reports 4/1984 - 5/1985 | |
| Mahan & Smith Correspondence 5/1983 - 8/1983 | |
| Towne, Richards & Chaudiere, Inc. 5/1968 - 2/1983 | |
| Diary Reports (Construction Reports) 3/1984 - 3/1985 | |
| Concrete Testing 3/1984 - 6/1984 | |
| General Correspondence #3 6/1984 - 3/1986 | |
| General Correspondence #2 12/1983 - 5/1984 | |
| General Correspondence #1 4/1983 - 4/1983 | |
| Waldron Pomeroy Smith Foote & Akira General Correspond. #3 12/1984 - 6/1985 | |
| Waldron Pomeroy Smith Foote & Akira General Correspond. #2 6/1984 - 11/1984 | |
| Waldron Pomeroy Smith Foote & Akira General Correspond. #1 5/1983 - 5/1984 | |
| Waldron Pomeroy Smith Foote & Akira Contract, Payments 12/1982 - 6/1985 | |
| Airway’s Sheet Metal General Correspondence #2 11/1984 - 8/1985 | |
| Airway’s Sheet Metal General Correspondence #1 2/1984 - 10/1984 | |
| Airway’s Sheet Metal Payments, C.O. s #2 12/1984 - 3/1985 | |
| Airway’s Sheet Metal Contract, Payments, C.O. s #1 2/1984 - 1/1985 | |
| Pending Change Proposals 7/24/1984 | |
| Rejected Bids (First Bid) 9/23/1983 | |
| Rejected Bids (Second Bid) 1/24/1984 | |
| Building Program Statement 8/1979 | |
| Building #0003 - Fulmer Hall (Phase II) | |
| 2 | Budget File 7/1979 - 10/1985 |
| Affirmative Action Reports 6/1982 - 4/1983 | |
| DHEW Correspondence 2/1982 - 3/1982 | |
| Smith & Swenson Engineers Correspondence 5/1981 - 3/1984 | |
| Diary Reports (Construction Reports) 5/1982 - 5/1983 | |
| Minutes of the Meetings 10/8/1982 | |
| Hardware Schedule 6/1982 - 7/1982 | |
| ABC Laboratories, Inc., Testing 5/28/1982 | |
| General Correspondence #4 2/1983 - 5/1990 | |
| General Correspondence #3 4/1982 - 1/1983 | |
| General Correspondence #2 10/198 1 - 3/1982 | |
| General Correspondence #1 5/1978 - 9/1981 | |
| Waldron Pomeroy Smith Foote & Akira General Corres. #3 12/1982 - 6/1989 | |
| Waldron Pomeroy Polk & Smith General Correspondence #2 10/1981 - 11/1982 | |
| Waldron Pomeroy Polk & Smith General Correspondence #1 6/1978 - 9/198 1 | |
| Waldron Pomeroy Polk & Smith Contract, Payments 8/1978 - 4/1984 | |
| Levernier - Shea General Correspondence 3/1982 - 1/1984 | |
| Levernier - Shea Contract, Payments, C.O.s 2/1982 - 10/1983 | |
| Rejected Bids - General 3/9/1982 | |
| Rejected Bids - Electrical 3/4/1982 | |
| Rejected Bids - Mechanical 3/4/1982 | |
| Building Program Statement 2/20/1979 | |
| Design Development 5/1980 | |
| Building #0003 - Fulmer Hall Annex | |
| Budget [empty file] | |
| Mahan & Smith Correspondence 3/1984 - 5/1984 | |
| Air Flow Study 4/2/1984 | |
| General Correspondence 5/1983 - 12/1984 | |
| Building #0020 - Carpenter Hall | |
| 3 | Budget 4/1987 - 10/1993 |
| E.I.S. 9/1987 - 10/1987 | |
| Regents Reports 10/1986 - 5/1992 | |
| Burke/Lee A Joint Venture 11/1988 - 1/1993 | |
| Mahan & DeSalvo General Correspondence #2 5/1990 - 10/1990 | |
| Mahan & DeSalvo General Correspondence #1 3/1987 - 3/1990 | |
| Earl Nelson Corporation General Correspondence 2/1990 - 12/1990 | |
| Heery General Correspondence #2 3/1991 - 12/1992 | |
| Heery General Correspondence #1 12/1989 - 2/1991 | |
| Heery Program Management Contract, Payments #2 12/1992 - 6/1993 | |
| Heery Program Management Contract, Payments #1 2/1990 - 11/1992 | |
| Coopers & Lybrand General Correspondence 2/1993 - 6/1993 | |
| Coopers & Lybrand Contract, Payments 2/1993 - 3/1993 | |
| MW Consulting Engineers Contract, Payments 1/1992 - 2/1992 | |
| Peterson Consulting, Ltd., Contract, Payments 2/1993 - 3/1993 | |
| Budinger & Associates Geotechnical Investigation & Review 7/28/1989 | |
| Building Program 1/1988 | |
| Physical Plant Inspection Reports 12/1989 - 2/1992 | |
| Construction Diary Reports #3 9/1991 - 2/1992 | |
| Construction Diary Reports #2 5/1991 - 8/1991 | |
| Construction Diary Reports #1 12/1989 - 3/1991 | |
| 4 | Diary and Progress Reports 8/1990 - 2/1991 |
| Diary and Progress Reports 6/1989 - 2/1990 | |
| Temperature Controls undated | |
| Project Manager Weekly Reports 3/1991 - 8/1991 | |
| Non-Completed Submittals 7/30/1991 | |
| Pittsburgh Testing Laboratory 8/1990 - 10/1990 | |
| Pittsburgh Testing Laboratory 10/1989 - 7/1990 | |
| Wyatt-Jaykim Concrete Testing 10/1990 - 8/1991 | |
| General Correspondence #10 6/1993 - 7/1995 | |
| General Correspondence #9 1/1992 - 5/1993 | |
| General Correspondence #8 9/1991 - 12/1991 | |
| General Correspondence #7 5/1991 - 8/1991 | |
| General Correspondence #6 11/1990 - 4/1991 | |
| General Correspondence #5 6/1990 - 10/1990 | |
| 5 | General Correspondence #4 2/1990 - 5/1990 |
| General Correspondence #3 8/1989 - 1/1990 | |
| General Correspondence #2 1/1989 - 7/1989 | |
| General Correspondence #1 8/1986 - 12/1988 | |
| NBBJ Architects Hardware Schedule 7/1989 - 11/1989 | |
| NBBJ Architects General Correspondence #22 1/1991 - 6/1995 | |
| NBBJ Architects General Correspondence #21 10/1991 - 12/1991 | |
| NBBJ Architects General Correspondence #20 6/1991 - 9/1991 | |
| NBBJ Architects General Correspondence #19 2/1991 - 5/1991 | |
| NBBJ Architects General Correspondence #18 12/1990 - 1/199 1 | |
| 6 | NBBJ General Correspondence #17 11/1990 - 11/1990 |
| NBBJ General Correspondence #16 10/1990 - 10/1990 | |
| NBBJ General Correspondence #15 9/1990 - 9/1990 | |
| NBBJ General Correspondence #14 7/1990 - 8/1990 | |
| NBBJ General Correspondence #13 5/1990 - 6/1990 | |
| NBBJ General Correspondence #12 4/1990 - 4/1990 | |
| NBBJ General Correspondence #11 3/1990 - 3/1990 | |
| NBBJ General Correspondence #10 1/1990 - 2/1990 | |
| NBBJ General Correspondence #9A 12/7/1989 - 12/28/1989 | |
| NBBJ General Correspondence #9 11/1989 - 12/4/1989 | |
| 7 | NBBJ Architects General Correspondence #8 9/1989 - 10/1989 |
| NBBJ Architects General Correspondence #7 8/1989 - 8/1989 | |
| NBBJ Architects General Correspondence #6 6/1989 - 7/1989 | |
| NBBJ Architects General Correspondence #5 5/1989 - 5/1989 | |
| NBBJ Architects General Correspondence #4 4/1989 - 4/1989 | |
| NBBJ Architects General Correspondence #3 1/1989 - 3/1989 | |
| NBBJ Architects General Correspondence #2 11/1987 - 12/1988 | |
| NBBJ Architects General Correspondence #1 8/1986 - 10/1987 | |
| NBBJ Architects Contract, Payments 4/1987 - 3/1995 | |
| Landscaping General Architect Correspondence 11/1987 - 8/1990 | |
| Carpenter Hall Furnishings 10/1994 - 4/1995 | |
| 8 | Bouten Construction General Correspondence #8 10/1991 - 7/1993 |
| Bouten Construction General Correspondence #7 5/1991 - 9/1991 | |
| Bouten Construction General Correspondence #6 3/1991 - 4/1991 | |
| Bouten Construction General Correspondence #5A 2/1991 - 2/1991 | |
| Bouten Construction General Correspondence #5 1/1991 - 1/1991 | |
| Bouten Construction General Correspondence #4 12/1990 - 12/1990 | |
| Bouten Construction General Correspondence #3 10/1990 - 10/1990 | |
| Bouten Construction General Correspondence #2 4/1990 - 9/1990 | |
| Bouten Construction General Correspondence #1 5/1989 - 3/1990 | |
| Bouten Construction Company RFI #900-941 8/21/1991 - 2/6/1992 | |
| Bouten Construction Company RFI #850-899 5/9/1991 - 7/10/1991 | |
| Bouten Construction Company RFI #800-850 4/2/1991 - 5/9/1991 | |
| 9 | Bouten Construction Company RFI #751-799 2/28/1991 - 3/29/1991 |
| Bouten Construction Company RFI #651-750 1/7/1991 - 2/28/1991 | |
| Bouten Construction Company RFI #600-650 1/19/1990 - 1/28/1991 | |
| Bouten Construction Company RFI #501-522 (no folder) 9/19/1990 - 9/27/1990 | |
| Bouten Construction Company RFI #560-599 10/17/1990 - 11/19/1990 | |
| Bouten Construction Company RFI #500-559 9/19/1990 - 10/18/1990 | |
| Bouten Construction Company RFI #451-499 8/20/1990 - 9/20/1990 | |
| Bouten Construction Company RFI #400-450 7/20/1990 - 8/21/1990 | |
| Bouten Construction Company RFI #351-399 6/11/1990 - 7/20/1990 | |
| Bouten Construction Company RFI #300-350 5/8/1990 - 8/13/1990 | |
| Bouten Construction Company RFI #250-299 3/20/1990 - 5/8/1990 | |
| Bouten Construction Company RFI #201-249 1/18/1990 - 6/14/1990 | |
| 10 | Bouten Construction Company RFI #126-200 10/20/1989 - 1/26/1990 |
| Bouten Construction Company RFI #71-125 8/22/1989 - 10/20/1989 | |
| Bouten Construction Company RFI #1-70 6/23/1989 - 8/22/1989 | |
| Bouten Construction Company Contract, Payments, C.O.s #18 5/1992 - 7/1992 | |
| Bouten Construction Company C.P.s, C.O.s #17 C.O. #19 | |
| Bouten Construction Company C.P.s, C.O.s #17A C.O. #19 | |
| Bouten Construction Company C.P.s, C.O.s #17B C.O. #19 | |
| Bouten Construction Company C.P.s, C.O.s #16 C.O. #18 | |
| Bouten Construction Company C.P.s, C.O.s #15 C.O. #18 | |
| 11 | Bouten Construction Company C.P.s, C.O.s #14 CO. #17 |
| Bouten Construction Company C.P.s, C.O.s #13 C.O. #16 | |
| Bouten Construction Company C.P.s, C.O.s #12 C.O. #16 | |
| Bouten Construction Company C.P.s, C.O.s #11 C.O. #15 | |
| Bouten Construction Company C.P.s, C.O.s #10 C.O. #15 | |
| Bouten Construction Company C.P.s, C.O.s #9 CO. #14 | |
| Bouten Construction Company C.P.s, C.O.s #8 C.O. #14 | |
| Bouten Construction Company C.P.s, C.O.s #7 C.O. #13 | |
| 12 | Bouten Construction Company Payments, C.O.s, C.P.s #6 CD. #11 |
| Bouten Construction Company Payments, C.O.s, C.P.s #5 C.O. #12 | |
| Bouten Construction Company Payments, C.O.s, C.P.s #4 C.O.s #8,9,10 | |
| Bouten Construction Company Payments, C.O.s, C.P.s #3 C.O.s. #6,7 | |
| Bouten Construction Company Payments, C.O.s, C.P.s #2 12/1989 - 3/1990 | |
| Bouten Construction Company Payments, Contract, C.O.s, C.P.s #1 6/1989 - 11/1989 | |
| Bouten Construction file (Blue Label) misc. dates | |
| Bouten Settlement and Release Agreement 4/1993 - 4/1996 | |
| Change Order Proposal Log 12/1991 - 5/1992 | |
| Statements of Compliance 1989 - 1991 | |
| Pending Change Proposals Aa - Am | |
| Pending Change Proposals Ao - Az | |
| Pending Change Proposals Ba - Br | |
| Pending Change Proposals Bs - Bz | |
| Pending Change Proposals Ca - Cz | |
| Pending Change Proposals Da - Di | |
| Pending Change Proposals Dj - Du | |
| Pending Change Proposals Du - Dz | |
| Pending Change Proposals Ea - Ez | |
| Pending Change Proposals Fa - Fz | |
| 13 | Pending Change Proposals Ga - Go |
| Pending Change Proposals Gr - Gz | |
| Pending Change Proposals Ha - Hz | |
| Pending Change Proposals F & L | |
| Pending Change Proposals N - AL | |
| Rejected Bids 5/9/1989 - 10/25/1994 | |
| Schematic Design 4/24/1987 | |
| Building Program 1/1987 | |
| Design Development 10/16/1987 | |
| The NBBJ Group Project & Cost Management 5/2/1989 | |
| Wausau Metals Corp Retrofit Information 6/15/1988 | |
| Carpenter Hall Remodel Time Line 9/25/1991 | |
| Life Cycle Cost Analysis 12/1/1987 | |
| Mechanical Calculations 3/10/1989 | |
| 14 | Pending Change Proposals GA - GQ |
| Pending Change Proposals GR - GZ | |
| Bouten Construction RFI's H | |
| Pending Change Proposals F - L | |
| Pending Change Proposals N - AL | |
| Rejected Bids | |
| Schematic Design 4/24/1987 | |
| Building Program 1/1988 | |
| Design Development 10/16/1987 | |
| Project Cost Management | |
| WAUSAU Metals Corporation Correspondence 6/15/1988 | |
| Remodel Timeline 9/16/1991 | |
| Life Cycle Cost Analysis 12/1/1987 | |
| Mechanical Calculations 3/10/1989 | |
| Central Campus Storm Sewer and Circulation Improvements | |
| 15 | Central Campus Storm Sewer and Circulation Improvements 8/1981 - 9/1985 |
| Diary Reports 9/1986 - 11/1986 | |
| Central Campus Storm Sewer and Circulation Improvements Study 4/1984 | |
| Comprehensive Campus Plan | |
| Parking and Grounds Study 12/1986 - 3/1989 | |
| Parking and Grounds Study 4/1984 - 11/1986 | |
| Parking and Grounds Study 10/1981 - 3/1984 | |
| General Correspondence 11/1979 - 1/1983 | |
| Burke/Lee Associates General Correspondence #2 5/1983 - 10/1988 | |
| Burke/Lee Associates General Correspondence #1 10/1980 - 4/1983 | |
| Comprehensive Physical Planning Process 6/1987 - 1/1989 | |
| Comprehensive Plan Update #4 2/1986 - 5/1987 | |
| Comprehensive Plan Update #3 6/1985 - 1/1986 | |
| Comprehensive Plan Update #2 10/1984 - 5/1985 | |
| Comprehensive Plan Update #1 6/1983 - 9/1984 |
Archives 283
Facilities Development
Building Files and Records, 1963-1998
ACQUISITION AND PROCESSING INFORMATION
These Facilities Development Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on July 9th, 1998 (UA 1998-14) by Anne Clark of Facilities Development. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few campus-wide items located at the end. Buildings included here include Fulmer Hall and Carpenter Hall.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Facilities Development Building Files and Records, 1963-1998 (UA 283)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| Building #0003 - Chemistry Building | |
| 1 | Budget 1/1983 - 4/1991 |
| Regents Reports 9/1986 - 11/1989 | |
| E.I.S. 1/1985 - 2/1987 | |
| Burke/Lee-Correspondence 1/1983 - 9/1988 | |
| Mahan & Smith - Correspondence 3/1984 - 8/1989 | |
| Wyatt-Jaykim Engineers Reports 10/1987 - 4/1992 | |
| Shannon & Wilson, Inc. Correspondence 1/1985 - 2/1988 | |
| Construction Reports 6/1989 - 8/1989 | |
| Construction Reports 11/1988 - 5/1989 | |
| Construction Reports 7/1988 - 10/1988 | |
| Construction Reports (Diary Reports) 6/1988 | |
| Concrete Testing 7/1987 - 11/1987 | |
| General Correspondence #21 1/1991 - 8/1997 | |
| General Correspondence #20 4/1990 - 12/1990 | |
| General Correspondence #19 12/1989 - 3/1990 | |
| 2 | General Correspondence #18 9/1989 - 11/1989 |
| General Correspondence #17 6/1989 - 8/1998 | |
| General Correspondence #16 4/1989 - 5/1989 | |
| General Correspondence #15 9/1988 - 3/1989 | |
| General Correspondence #14 12/1987 - 8/1988 | |
| General Correspondence #13 8/1987 - 11/1987 | |
| General Correspondence #12 6/1987 - 4/1987 | |
| General Correspondence #11 4/1987 - 5/1987 | |
| General Correspondence #10 2/1987 - 3/1987 | |
| 3 | General Correspondence #9 8/1986 - 1/1987 |
| General Correspondence #8 2/1986 - 7/1986 | |
| General Correspondence #7 10/1985 - 1/1986 | |
| General Correspondence #6 6/1985 - 9/1985 | |
| General Correspondence #5 3/1985 - 5/1985 | |
| General Correspondence #4 1/1985 - 2/1985 | |
| General Correspondence #3 10/1984 - 12/1984 | |
| General Correspondence #2 5/1984 - 9/1984 | |
| General Correspondence #1 1/1983 - 4/1984 | |
| Brooks Hensley Creager Architects Daily Reports 10/1987 - 1/1988 | |
| Brooks Hensley Creager Architects General Correspondence #28 9/1990 - 12/1991 | |
| Brooks Hensley Creager Architects General Correspondence #27 1/1990 - 8/1990 | |
| Brooks Hensley Creager Architects General Correspondence #26 10/1989 - 12/1989 | |
| 4 | Brooks Hensley Creager Architects General Correspondence #25 8/1989 - 9/1989 |
| Brooks Hensley Creager Architects General Correspondence #24 6/1989 - 7/1989 | |
| Brooks Hensley Creager Architects General Correspondence #23 3/1989 - 5/1989 | |
| Brooks Hensley Creager Architects General Correspondence #22 10/1988 - 2/1989 | |
| Brooks Hensley Creager Architects General Correspondence #21 5/1988 - 9/1988 | |
| Brooks Hensley Creager Architects General Correspondence #20 3/1988 - 4/1988 | |
| Brooks Hensley Creager Architects General Correspondence #19 12/1987 - 2/1988 | |
| Brooks Hensley Creager Architects General Correspondence #18 8/1987 -11/1987 | |
| Brooks Hensley Creager Architects General Correspondence #17 6/1987 - 7/1987 | |
| 5 | Brooks Hensley Creager Architects General Correspondence #16 5/1987 - 5/1987 |
| Brooks Hensley Creager Architects General Correspondence #15 4/1987 - 4/1987 | |
| Brooks Hensley Creager Architects General Correspondence #14 3/1987 - 3/1987 | |
| Brooks Hensley Creager Architects General Correspondence #13 2/1987 - 2/1987 | |
| Brooks Hensley Creager Architects General Correspondence #12 1/1987 - 1/1987 | |
| Brooks Hensley Creager Architects General Correspondence #11 10/1986 - 12/1986 | |
| Brooks Hensley Creager Architects General Correspondence #10 2/1986 - 9/1986 | |
| Brooks Hensley Creager Architects General Correspondence #9 11/1985 - 1/1986 | |
| Brooks Hensley Creager Architects General Correspondence #8 9/1985 - 10/1985 | |
| Brooks Hensley Creager Architects General Correspondence #7 8/1985 - 8/1985 | |
| Brooks Hensley Creager Architects General Correspondence #6 5/1985 - 7/1985 | |
| Brooks Hensley Creager Architects General Correspondence #5 3/1985 - 4/1985 | |
| Brooks Hensley Creager Architects General Correspondence #4 1/1985 - 2/1985 | |
| 6 | Brooks Hensley Creager Architects General Correspondence #3 9/1984 - 12/1984 |
| Brooks Hensley Creager Architects General Correspondence #2 6/1984 - 8/1984 | |
| Brooks Hensley Creager Architects General Correspondence #1 5/1984 - 5/1984 | |
| Brooks Hensley Creager Payments, Addendums #3 5/1989 - 7/1990 | |
| Brooks Hensley Creager Payments, Addendums #2 4/1987 - 3/1988 | |
| Brooks Hensley Creager Contract, Payments, Change Proposals #1 6/1983 - 4/1987 | |
| Shea/Emerick Construction General Correspondence #4 1/1990 - 4/1992 | |
| Shea/Emerick Construction General Correspondence #3 1/1989 - 12/1989 | |
| Shea/Emerick Construction General Correspondence #2 1/1988 - 12/1988 | |
| Shea/Emerick Construction General Correspondence #1 8/1987 - 6/1988 | |
| Shea/Emerick Construction Contract, Payments, C.O. s #4 9/1989 - 11/1989 | |
| Shea/Emerick Construction Contract, Payments, C.O. s #3 3/1989 - 9/1989 | |
| Shea/Emerick Construction Contract, Payments, C.O. s #2 10/1988 - 2/1989 | |
| 7 | Shea/Emerick Construction Contract, Payments, C.O.s # 1 8/1987 - 9/1988 |
| Pending Contract Change Proposals 10/1987 - 8/1989 | |
| Rejected Bids - General Construction 8/6/1987 - 8/13/1987 | |
| Rejected Bids - Electrical Work 31995 | |
| Rejected Bids - Lab Controlled Temperature 31995 | |
| Rejected Bids - Mechanical Work 31995 | |
| Rejected Bids - Laboratory Furnishings 31995 | |
| Rejected Bids - Laboratory Equipment 31995 | |
| Certificate of Substantial Completion 32597 | |
| Certificate of Substantial Completion 32797 | |
| Exhaust Gas Re-Entry in the WSU Chemistry Synthesis and Fulmer Annex Buildings 33227 | |
| Chemistry Building Color Selections 32818 | |
| Waterproofing 6/1984 - 10/1987 | |
| Chemistry Building Geotechnical Investigation 9/1984 - 6/1987 | |
| Brooks Hensley Creager Contract and Background Information Regarding Cost Overrun and Fee Circumstances 9/1985 - 8/1986 | |
| Wind Tunnel Study of Air Flow About Fulmer Hall and the New Chemistry Synthesis Building 32554 | |
| Design Development Chemistry Building Project Description Chemistry Building Program Statement 3/1984 | |
| Schematic Design Phase Binder 11/2/1984 | |
| Schematic Design Phase Binder 9/24/1986 | |
| Schematic Design Phase Binder - Architectural Work undated | |
| A WSU Chemistry Building Waterproofing Research Report 10/1985 - 5/1987 | |
| Geotechnical Report Research Chemistry Building WSU 12/6/1984 | |
| Rock Quality and Mechanical Room Extension Supplemental 3/11/1986 | |
| Vibration Testing 6/1/1989 | |
| Chemistry Building Design Development Cost Estimate 2/11/1987 | |
| Statement of Qualifications for Engineering & Architectural Services 6/1987 | |
| Chemistry Building Revised Design Development 3/1987 | |
| Chemistry Building Site Selection Study 3/1984 | |
| Building #0009 - Olympic Weight Room Addition | |
| 8 | Budget 11/1987 - 7/1990 |
| Regents Reports 4/1987 - 8/1990 | |
| Mahan & DeSalvo 5/1985 - 1/1989 | |
| Meeting Minutes 2/1987 - 7/1987 | |
| Construction Reports 5/1989 - 8/1989 | |
| Concrete Testing 5/1989 - 8/1989 | |
| General Correspondence 4/1987 - 9/1992 | |
| ALSC Architects General Correspondence # 2 5/1989 - 7/1992 | |
| ALSC Architects General Correspondence # 1 10/1987 - 4/1989 | |
| ALSC Architects Contract, Payments 10/1987 - 3/1990 | |
| Levernier Construction General Correspondence 4/1989 - 8/1990 | |
| Levernier Construction Company Contract, Payments, C.O.s 5/1989 - 9/1990 | |
| Rejected Bids 1/24/1989 | |
| Olympic Weight Room Addition Design Development 4/1988 | |
| Olympic Weight Room Facility Design Development 3/1985 | |
| Olympic Weight Room Addition Building Program 8/1987 | |
| Olympic Weight Room Building Addition Building Program 12/1984 | |
| Building #0032 - Science Hall Phase I | |
| 9 | Budget 2/1980 - 9/1986 |
| Richal Smith General Correspondence 1/1978 - 8/1983 | |
| Concrete Testing 9/1983 - 8/1984 | |
| Affirmative Action Reports 1/1984 - 8/1985 | |
| Landscaping 12/1984 - 5/1985 | |
| General Correspondence # 9 4/1985 - 10/1991 | |
| General Correspondence # 8 12/1984 - 3/1985 | |
| General Correspondence # 7 6/1984 - 11/1984 | |
| General Correspondence # 6 1/1984 - 5/1984 | |
| General Correspondence # 5 8/1983 - 12/1983 | |
| General Correspondence # 4 2/1983 - 7/1983 | |
| General Correspondence # 3 8/1982 - 1/1983 | |
| General Correspondence # 2 10/1981 - 7/1982 | |
| General Correspondence # 1 1/1997 - 9/1981 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 10 4/1985 - 9/1986 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 9 10/1984 - 3/1985 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 8 4/1984 - 9/1984 | |
| 10 | Decker Hobbs Fukui Davison Arch. General Correspondence # 7 12/1983 - 3/1984 |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 6 9/1983 - 11/1983 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 5 4/1983 - 8/1983 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 4 1/1983 - 3/1983 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 3 10/1982 - 12/1982 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 2 10/1981 - 9/1982 | |
| Decker Hobbs Fukui Davison Arch. General Correspondence # 1 6/1977 - 9/1981 | |
| Decker Hobbs Fukui Davison Arch. Fee Information 4/1985 - 7/1985 | |
| Decker Hobbs Fukui Davison Arch. C.O.s, Payments # 3 9/1984 - 5/1986 | |
| Decker Hobbs Fukui Davison Arch. Contract, C.O.s, Payments # 2 6/1983 - 7/1984 | |
| Decker Hobbs Fukui Davison Arch. Contract, C.O.s, Payments # 1 6/1977 - 5/1983 | |
| Levernier - Shea Construction General Correspondence # 2 1/1985 - 6/1988 | |
| Levernier - Shea Construction General Correspondence # 1 8/1983 - 12/1984 | |
| Levernier - Shea Construction Payments, C.O.s # 3 9/1983 - 6/1985 | |
| Levernier - Shea Construction Contract, C.O.s, Payments # 2 9/1983 - 12/1984 | |
| Levernier - Shea Construction Contract, C.O.s, Payments # 1 7/1983 - 7/1984 | |
| 11 | Contract Change Proposals 8/1983 - 1/1985 |
| Rejected Bids - Electrical 7/21/1983 | |
| Rejected Bids - Mechanical 7/21/1983 | |
| Rejected Bids - General 7/28/1983 | |
| Phase I Science Hall Remodeling Building Program 5/1982 | |
| Building Program for Science Hall Remodeling 10/1977 | |
| Electrical Engineers - Sparling & Associates, Inc. Firm Profile Life Cycle Cost Analysis Science Hall Remodeling 12/7/1982 | |
| John R. Cook, P.E., Electrical Calculations 6/20/1983 | |
| Report Geotechnical Consultation Proposed Science Hall Bldg. 1/19/1983 | |
| Mechanical Calculations Science Hall Remodeling 6/30/1983 | |
| Structural Calculations for Science Hall Remodeling Phase I 5/16/1983 | |
| Schematic Construction Cost Estimate 6/11/1982 | |
| Site & Volume Planning Study Science Area Complex | |
| Building #0044 - McCoy Hall | |
| 12 | Budget 4/1998 - 1/1988 |
| Regents Reports 9/1986 - 9/1987 | |
| Construction Reports 3/1988 - 1/1989 | |
| General Correspondence # 5 9/1989 - 10/1991 | |
| General Correspondence # 4 1/1989 - 8/1989 | |
| General Correspondence # 3 3/1988 - 12/1988 | |
| General Correspondence # 2 10/1986 - 2/1988 | |
| General Correspondence # 1 11/1979 - 9/1986 | |
| DeNeff Deeble Barton Associates Architects - General Correspondence # 3 7/1989 - 10/1990 | |
| DeNeff Deeble Barton Associates Architects - General Correspondence # 2 10/1987 - 6/1989 | |
| DeNeff Deeble Barton Associates Architects - General Correspondence # 1 11/1986 - 9/1987 | |
| DeNeff Deeble Barton Associates Architects - Contract, Payments 11/1986 - 10/1990 | |
| Culler Gale Martell Ericson, PS, Architecture Planning, General Correspondence 3/1979 - 5/1986 | |
| Culler Gale Martell Ericson, PS, Architecture Planning, Contract, Payments 12/1985 - 3/1986 | |
| Levernier Construction - General Correspondence 2/1988 - 12/1989 | |
| Levernier Construction - Contract, Payments, C.O.'s 1/1989 - 5/1990 | |
| Levernier Construction - Contract, Payments, C.O.'s 1/1988 - 12/1988 | |
| Rejected Bids 1/21/1988 | |
| Affirmative Action Reports 8/1988 - 12/1988 | |
| 2 Schematic Phase Binders 3/1987 | |
| Balance Report Review for Supply & Exhaust Fans of HVAC Binder 5/1988 - 6/1989 | |
| Remodeling/Renewal Program Binder 4/1986 | |
| David L. Smith Working File | |
| Building #0070 - Neill Hall | |
| 13 | Duarte Bryant Architects General Correspondence # 2 4/1989 - 7/1989 |
| Duarte Bryant Architects General Correspondence # 1 1/1989 - 3/1989 | |
| Duarte Bryant Architects Payments, Contract 3/1987 - 5/1991 | |
| Lydig Construction General Correspondence 5/1989 - 1/1992 | |
| Lydig Construction Payments, Change Orders # 2 2/1990 - 4/1991 | |
| Lydig Construction Contract, Payments, C.O.s # 1 6/1989 - 1/1990 | |
| Pending Change Proposals 5/1989 - 5/1990 | |
| Rejected Bids 5/2/1989 - 5/9/1989 | |
| Landscaping 9/1990 - 10/1990 | |
| Neill Hall Renewal Schematic Phase Binder | |
| Building Program 5/1987 | |
| 14 | Budget 6/1987 - 4/1991 |
| E.I.S. 10/1984 - 9/1987 | |
| Regents Report 5/1989 - 1/1991 | |
| Mahan & DeSalvo, Consulting Engineers 4/1987 - 3/1989 | |
| Contraction Reports 1/1990 - 5/1990 | |
| Concrete Testing Reports 7/1989 - 8/1989 | |
| General Correspondence # 6 10/1990 - 12/1995 | |
| General Correspondence # 5 5/1990 - 9/1990 | |
| General Correspondence # 4 8/1989 - 4/1990 | |
| General Correspondence # 3 4/1989 - 7/1989 | |
| General Correspondence # 2 10/1987 - 3/1989 | |
| General Correspondence # 1 3/1984 - 9/1987 | |
| Duarte Bryant Architects General Correspondence # 6 11/1990 - 10/1991 | |
| Duarte Bryant Architects General Correspondence # 5 5/1990 - 10/1990 | |
| Duarte Bryant Architects General Correspondence # 4 12/1989 - 4/1990 | |
| Duarte Bryant Architects General Correspondence # 3 8/1989 - 11/1989 | |
| Building #0078A - Electrical/Mechanical Engineering Building | |
| 15 | Budget 2/1982 - 10/1989 |
| E.I.S. 6/1983 - 7/1983 | |
| Affirmative Action Reports 7/1984 - 9/1986 | |
| "Alucobond" Study 1/1986 - 11/1986 | |
| Concrete Testing 6/1984 - 5/1988 | |
| Life Cycle Cost Analysis and Air Flow Study 7/1983 | |
| Mahan & Smith General Correspondence 4/1983 - 7/1986 | |
| Comprehensive Campus Plan (Burke/Lee General Correspondence) 12/1981 - 9/1983 | |
| Construction Reports (Dairy Reports) 6/1984 - 10/1986 | |
| General Correspondence # 9 12/1986 - 8/1992 | |
| General Correspondence # 8 7/1986 - 11/1986 | |
| General Correspondence # 7 4/1986 - 6/1986 | |
| General Correspondence # 6 10/1985 - 3/1986 | |
| General Correspondence # 5 12/1984 - 9/1985 | |
| General Correspondence # 4 7/1984 - 11/1984 | |
| General Correspondence # 3 3/1984 - 6/1984 | |
| 16 | General Correspondence # 2 6/1983 - 2/1984 |
| General Correspondence # 1 1/1982 - 5/1983 | |
| CSA/LMN Joint Venture General Correspondence # 7 10/1986 - 3/1990 | |
| CSA/LMN Joint Venture General Correspondence # 6 4/1986 - 9/1986 | |
| CSA/LMN Joint Venture General Correspondence # 5 7/1985 - 3/1986 | |
| CSA/LMN Joint Venture General Correspondence # 4 1/1985 - 6/1985 | |
| CSA/LMN Joint Venture General Correspondence # 3 6/1984 - 12/1984 | |
| CSA/LMN Joint Venture General Correspondence # 2 12/1983 - 5/1984 | |
| CSA/LMN Joint Venture General Correspondence # 1 4/1983 - 11/1983 | |
| CSA/LMN Joint Venture Contract, Payments, C.O.s # 2 11/1984 - 9/1987 | |
| CSA/LMN Joint Venture Contract, Payments, C.O.s # 1 6/1982 - 8/1984 | |
| Ace Elliott Landscaping General Correspondence # 2 6/1986 - 12/1987 | |
| Ace Elliott Landscaping General Correspondence # 1 1/1986 - 11/1988 | |
| Ace Elliott Landscaping Contract, Payments, C.O.s 8/1986 - 10/1986 | |
| 17 | M.A. Mortenson Co. Contractor General Correspondence 6/1984 - 12/1989 |
| M.A. Mortenson Co. Contractor C.O.s # 4 4/1986 - 3/1987 | |
| M.A. Mortenson Co. Contractor Payments, C.O.s # 3 8/1985 - 4/1986 | |
| M.A. Mortenson Co. Contractor Contract, Payments, C.O.s # 2 4/1985 - 11/1985 | |
| M.A. Mortenson Co. Contractor Contract, Payments, C.O.s # 1 5/1984 - 7/1985 | |
| Pending Change Proposals 9/1985 - 7/1986 | |
| Rejected Bids - General 5/24/1984 | |
| Rejected Bids - Mechanical 5/17/1984 | |
| Rejected Bids - Electrical 5/17/1984 | |
| Rejected Bids - Landscaping 6/26/1986 | |
| Contractor Qualification Statement - M.A. Mortenson Company 6/7/1984 | |
| WSU Engineering Photographs 9/1984 - 10/1984 | |
| Report on the Life Cycle Cost Analysis of the WSU Electrical/Mechanical Engineering Building 7/1983 | |
| WSU Electrical/Mechanical Engineering Building undated | |
| Landscaping Specifications 6/6/1986 | |
| Schematic Design Submittal CSA - LMM undated | |
| Outline Specification CSA - LMM undated | |
| Design Development CSA - LMM 7/5/1983 | |
| Building Program 12/1983 | |
| Building #0089 - Food Service Building | |
| 18 | Budget 3/1985 - 3/1989 |
| E.I.S. 10/1985 - 11/1985 | |
| Regents Reports 11/1985 - 5/1988 | |
| Affirmative Action Reports 1/1987 - 5/1988 | |
| Mahon & Smith, Inc. 4/1985 - 3/1987 | |
| Shannon & Wilson Geotechnical 10/4/1985 | |
| Asbestos Reports 12/16/1985 | |
| Daily Construction Reports (Dairy Reports) 1/1987 - 10/1988 | |
| Concrete Testing Reports 1/1987 - 7/1987 | |
| Keying Schedule 3/1987 - 4/1987 | |
| General Correspondence # 5 7/1990 - 6/1992 | |
| General Correspondence # 4 4/1987 - 6/1990 | |
| General Correspondence # 3 1/1987 - 7/1987 | |
| General Correspondence # 2 4/1986 - 12/1986 | |
| General Correspondence # 1 2/1983 - 3/1986 | |
| Miller/Hull General Correspondence # 5 12/1990 - 3/1992 | |
| Miller/Hull General Correspondence # 4 3/1988 - 11/1990 | |
| 19 | Miller/Hull General Correspondence # 3 4/1987 - 2/1988 |
| Miller/Hull General Correspondence # 2 4/1986 - 2/1987 | |
| Miller/Hull General Correspondence # 1 6/1983 - 4/1986 | |
| Miller/Hull Contract, Payments 3/1985 - 10/1990 | |
| Redding Construction General Correspondence 10/1986 - 1/1989 | |
| Redding Construction Contract, Payments, C.O.s # 2 1/1987 - 6/1992 | |
| Redding Construction Contract, Payments, C.O.s # 1 12/1986 - 1/1988 | |
| Emory & Emory, Inc. General Correspondence 6/1988 - 12/1990 | |
| Landscaping General Correspondence 2/1987 - 3/1990 | |
| Emory & Emory, Inc., Contract, Payments, C.O.s 7/1987 - 7/1989 | |
| Addendums to Specs 10/1986 - 12/1986 | |
| Pending Change Proposals 2/1987 - 4/1988 | |
| Rejected Bids - Electrical 10/14/1986 | |
| Rejected Bids - Mechanical 10/1986 - 11/1986 | |
| Rejected Bids - General (Second Bid) 12/9/1986 | |
| Rejected Bids - General (First Bid) 10/21/1986 | |
| Rejected Bids - Landscaping 5/4/1988 | |
| Building Program 4/1985 | |
| Shannon & Wilson, Inc., Geotechnical Report 10/4/1988 | |
| D.W. Thompson Life Cycle Cost Analysis 2/27/1986 | |
| Design Development 11/12/1985 | |
| Design Development 9/12/1985 | |
| Schematics 6/5/1985 | |
| Building #0097 - Fine Arts Center | |
| 20 | Budget 12/1987 - 4/1990 |
| Regents Reports 8/1987 - 7/1989 | |
| Center for Occupational Hazards, Inc., Correspondence 3/1988 - 5/1988 | |
| Wyatt Jaykim Report 9/1988 - 11/1988 | |
| Mahan & DeSalvo 3/1988 - 5/1988 | |
| Concrete Tests 9/1988 - 12/1988 | |
| General Correspondence # 4 5/1990 - 10/1991 | |
| General Correspondence # 3 1/1989 - 4/1990 | |
| General Correspondence # 2 11/1987 - 12/1988 | |
| General Correspondence # 1 5/1987 - 10/1987 | |
| Halvorson, Beach & Bower General Correspondence # 3 5/1990 - 1/1991 | |
| Halvorson, Beach & Bower General Correspondence # 2 10/1988 - 4/1990 | |
| Halvorson, Beach & Bower General Correspondence # 1 9/1987 - 9/1988 | |
| Halvorson, Beach & Bower Contract, Payments 10/1987 - 2/1991 | |
| 21 | Lydig Construction General Correspondence 6/1988 - 3/1990 |
| Lydig Construction Contract, Payments, C.O.s # 2 4/1989 - 7/1989 | |
| Lydig Construction Contract, Payments, C.O.s # 1 7/1988 - 3/1989 | |
| Pending Change Proposals 11/1988 - 7/1989 | |
| Rejected Bids - Mechanical 6/8/1988 - 6/10/1988 | |
| Mechanical Systems Renovation Life Safety Requirements 10/9/1987 | |
| Mechanical Systems Renovation Life Safety Requirements 10/9/1987 | |
| Air Balance Report Halvorson, Beach & Bower, Inc. 2/15/1991 | |
| Schematic Design Phase Submittal 11/301987 | |
| Parking Study Final Report 11/22/1988 | |
| Building #0138 - Alumni Center | |
| 22 | E.I.S. 10/1984 - 12/1984 |
| Burke/Lee, A Joint Venture 11/1988 - 5/1989 | |
| Building Committee Minutes # 2 1/1989 - 9/1989 | |
| Building Committee Minutes # 1 12/1983 - 12/1988 | |
| Construction Observations and Meetings 9/1987 - 8/1989 | |
| Daily Construction Reports (Dairy Reports) 7/1987 - 2/1990 | |
| Concrete Testing 9/1987 - 7/1989 | |
| General Correspondence # 7 8/1989 - 9/1994 | |
| General Correspondence # 6 3/1988 - 7/1989 | |
| General Correspondence # 5 11/1987 - 2/1988 | |
| General Correspondence # 4 6/1987 - 10/1987 | |
| General Correspondence # 3 3/1986 - 5/1987 | |
| General Correspondence # 2 8/1984 - 2/1986 | |
| General Correspondence # 1 10/1983 / -7/1984 | |
| 23 | N.W. Architects General Correspondence # 6 8/1989 - 1/1994 |
| N.W. Architects General Correspondence # 5 8/1988 - 7/1989 | |
| N.W. Architects General Correspondence # 4 3/1988 - 7/1988 | |
| N.W. Architects General Correspondence # 3 8/1987 - 2/1988 | |
| N.W. Architects General Correspondence # 2 3/1987 - 7/1987 | |
| N.W. Architects General Correspondence # 1 5/1984 - 2/1987 | |
| Alumni Center Landscaping 1/1987 - 2/1991 | |
| Turnkey Incorporated - Contractor Correspondence 10/1986 - 9/1989 | |
| Our Legacy - The Alumni Center 1/27/1986 | |
| Preliminary Structural Engineering Report 8/1/1988 | |
| Soil Investigation for WSU Foundation 9/11/1986 | |
| WSU Alumni Center 4/1984 | |
| Project Acceptance Letter 9/15/1989 | |
| 2 Alumni Center Binders - N.W. Architectural Company 3/21/1986 | |
| Building #0362 - Feed Preparation, Mixing and Storage Facility | |
| 24 | Budget 8/1985 - 1/1989 |
| E.I.S. 5/1986 - 12/1986 | |
| Regents Reports 5/1986 - 11/1987 | |
| Affirmative Action 10/1987 - 7/1988 | |
| Consultants 1/1986 - 4/1986 | |
| Mahan & Smith Correspondence 9/1985 - 11/1987 | |
| Daily Construction Reports (Diary Reports) 10/1987 - 4/1988 | |
| Concrete Testing 3/1987 - 5/1988 | |
| Purchase Orders A - L mixed dates | |
| Purchase Orders M - Z mixed dates | |
| General Correspondence # 5 7/1989 - 8/1991 | |
| General Correspondence # 4 9/1987 - 6/1989 | |
| General Correspondence # 3 5/1987 - 8/1987 | |
| General Correspondence # 2 8/1985 - 4/1987 | |
| General Correspondence # 1 1/1985 - 7/1985 | |
| ARC Architects Correspondence # 4 12/1987 - 9/1997 | |
| 25 | ARC Architects Correspondence # 3 8/1987 - 11/1987 |
| ARC Architects Correspondence # 2 8/1986 - 7/1987 | |
| ARC Architects Correspondence # 1 6/1985 - 7/1985 | |
| ARC Architects Contract, Payments 7/1985 - 3/1989 | |
| The Haskins Company Correspondence 10/1987 - 9/1989 | |
| The Haskins Company Contracts, Payments, C.O.s 9/1987 - 12/1988 | |
| Feed Systems, In., Correspondence 3/1987 - 2/1988 | |
| Statements of Compliance 10/1987 - 8/1988 | |
| Pending Change Proposals 11/1987 - 12/1987 | |
| Rejected Bids | |
| Shannon & Wilson, Inc. Explorations & Geotechnical Studies 6/19/1986 | |
| Shannon & Wilson, Inc. Explorations & Geotechnical Studies 10/14/1985 | |
| Building Program 7/1985 | |
| Martens/Chan, Inc., Structural Calculations 9/16/1987 | |
| ARC Architects Schematic Design undated | |
| Burke/Lee A Joint Venture Site Study 12/5/1985 | |
| Design Development 11/17/1986 | |
| Specifications for Freed Plan 6/8/1970 | |
| ARC Architects Equipment Specifications 1/27/1987 | |
| Building #0816 - Food/Human Nutrition Building | |
| 26 | Budget 1/1988 - 12/1989 |
| E.I.S. 9/1983 - 9/1986 | |
| Regents Reports 6/1987 - 11/1989 | |
| Affirmative Action Reports 1/1988 - 12/1988 | |
| Mahan & Smith Correspondence 7/1985 - 7/1989 | |
| Burke/Lee Associates General Correspondence 10/1983 - 2/1987 | |
| Fluid Engineering Correspondence 7/1986 - 6/1990 | |
| Keying Schedule 2/23/1988 | |
| Building Program 3/16/1983 | |
| Building Committee Meeting Minutes 3/1983 - 7/987 | |
| Construction Meeting Minutes 10/1987 - 3/1988 | |
| Daily Construction Reports (Diary Reports) 10/1987 - 2/1991 | |
| General Correspondence # 9 9/1989 - 10/1991 | |
| General Correspondence # 8 3/1989 - 8/1989 | |
| General Correspondence # 7 7/1988 - 2/1989 | |
| General Correspondence # 6 10/1987 - 6/1988 | |
| General Correspondence # 5 2/1987 - 9/1987 | |
| General Correspondence # 4 6/1986 - 1/1987 | |
| 27 | General Correspondence # 3 10/1985 - 5/1986 |
| General Correspondence # 2 10/1984 - 9/1985 | |
| General Correspondence # 1 1/1983 - 9/1984 | |
| N.W. Architects General Correspondence # 9 1/1990 - 6/1990 | |
| N.W. Architects General Correspondence # 5 6/1989 - 12/1989 | |
| N.W. Architects General Correspondence # 4 1/1989 - 5/1989 | |
| N.W. Architects General Correspondence # 6 8/1988 - 12/1988 | |
| N.W. Architects General Correspondence # 5 3/1988 - 7/1988 | |
| N.W. Architects General Correspondence # 4 8/1987 - 3/1988 | |
| N.W. Architects General Correspondence # 3 1/1987 - 7/1987 | |
| N.W. Architects General Correspondence # 2 10/1985 - 12/1986 | |
| N.W. Architects General Correspondence # 1 6/1983 - 9/1985 | |
| 28 | N.W. Architects Contract, Payments, C.O.s 4/1985 - 2/1991 |
| Bouten Construction General Correspondence # 2 1/1989 - 11/1992 | |
| Bouten Construction General Correspondence # 1 9/1987 - 1/1990 | |
| Bouten Construction Insurance 2/1987 - 2/1988 | |
| Bouten Construction Contract, Payments, C.O.s # 3 3/1989 - 2/1990 | |
| Bouten Construction Contract, Payments, C.O.s # 2 9/1988 - 2/1989 | |
| Bouten Construction Contract, Payments, C.O.s # 1 9/1987 - 8/1988 | |
| Matia Contractors, Inc. General Correspondence 7/1989 - 1/1990 | |
| Matia Contractors, Inc. Landscaping Correspondence # 2 8/1990 - 9/1991 | |
| Matia Contractors, Inc. Landscaping Correspondence # 1 7/1989 - 1/1990 | |
| Matia Contractors, Inc. Contract, Payments, C.O.s 7/1989 - 11/1989 | |
| 29 | Statements of Compliance # 2 6/1988 - 6/1989 |
| Statements of Compliance # 1 10/1987 - 5/1988 | |
| Pending Change Proposals Bouten Construction Co. 9/9/1987 | |
| Pending Change Proposals Matia Contractors, Inc. empty file | |
| Landscaping Rejected Bids 7/11/1989 | |
| Site Selection Study 9/1983 | |
| Design Development Phase 11/1986 | |
| Schematic Design Phase 6/26/1986 | |
| Structural Review Comments 7/27/1987 | |
| Foundation Investigation 5/15/1986 | |
| Building Program 9/1984 | |
| Building #0820 - Research and Technology Park - Building One | |
| 30 | Budget 6/1982 - 7/1984 |
| E.I.S. 12/1982 - 4/1985 | |
| Taber Chaitin Associates and Carley Capital Group 2/7/1985 - 2/1988 | |
| General Correspondence # 3 4/1985 - 10/1991 | |
| General Correspondence # 2 5/1983 - 3/1985 | |
| General Correspondence # 1 11/1980 - 4/1981 | |
| Research Park Wood Technology Building # 2 4/1987 - 10/1987 | |
| Research Park Wood Technology Building # 1 2/1984 - 3/1987 | |
| Wood Technology General & Architect Correspondence 11/1987 - 9/1989 | |
| Burke/Lee Associates Correspondence 2/1982 - 4/1985 | |
| Bouten Construction Company Correspondence 6/1987 - 8/1987 | |
| Taber Chaitin Associates Addendum # 6 2/12/1986 | |
| Draft Environmental Impact Statement 4/13/1983 | |
| Wood Engineering at Research Technology Park 11/1984 | |
| Building #1530 - Dairy Forage Facility at Buckley | |
| 31 | Budget 2/1988 - 6/1991 |
| E.I.S. 7/1989 - 4/1993 | |
| Regents Reports 3/1989 - 5/1991 | |
| Burke/Lee, A Joint Venture 12/19/1988 | |
| Mahan & DeSalvo Correspondence 2/1989 - 12/1989 | |
| Shop Drawings 9/1990 - 12/1990 | |
| Concrete and Soils Testing 7/1990 - 2/1991 | |
| General Correspondence # 3 4/1990 - 5/1993 | |
| General Correspondence # 2 8/1989 - 3/1990 | |
| General Correspondence # 1 5/1986 - 7/1989 | |
| BJSS Architects General Correspondence # 4 10/1990 - 5/1993 | |
| BJSS Architects General Correspondence # 3 5/1990 - 9/1990 | |
| BJSS Architects General Correspondence # 2 8/1989 - 4/1990 | |
| 32 | BJSS Architects General Correspondence # 1 8/1987 - 9/1989 |
| BJSS Architects Contract, Payments 11/1987 - 5/1993 | |
| Leo Finnegan Construction Company General Correspondence 6/1990 - 5/1991 | |
| Leo Finnegan Co. Contracts, Payments, C.O.s 5/1990 - 6/1991 | |
| Statements of Compliance 11/1990 - 12/1990 | |
| Pending Change Proposals 6/1990 - 11/1990 | |
| Rejected Bids 12/1989 - 7/1990 | |
| 95% Review Comments and Responses 12/7/1989 | |
| Facility Building Document 3/1988 | |
| Dairy/Forage Research Program 7/21/1986 | |
| Addendum to Geotechnical Engineering Report 7/21/1989 | |
| Shoreline Management Use Regulations for Pierce County 4/1981 | |
| Blunt Hamm and Urquhart Engineers Resume & Qualifications 10/11/1988 | |
| Structural Calculations 8/17/1989 | |
| Cost Estimate 5/8/1989 | |
| The BJSS Group Architects and Planners 2/21/1989 | |
| Addendum # 1 Project Documents 4/27/1990 | |
| 100% Review 11/21/1989 | |
| Project Estimate (Construction Document Phase) 2/1990 - 3/1990 | |
| Cost Estimate and Area Comparison 9/8/1989 | |
| Proposed Phase I Additions 1/1989 | |
| Master Plan 12/7/1988 | |
| Schematic Design Submittal 1/30/1989 | |
| Rebid Project Manual, Volume 2 - Architectural Details undated | |
| Rebid Project Manual, Volume 1 - Specifications 4/1990 | |
| Schematic Design Submittal 4/21/1992 | |
| Veterinary Research Diagnostic Center (WWREC) at Puyallup | |
| 33 | Budget 8/1987 - 4/1989 |
| Regents Reports 7/1987 - 11/1987 | |
| Building Committee Meetings 7/1987 - 1/1990 | |
| General Correspondence 7/1987 - 3/1991 | |
| Gross, Thurman & deMeers, Inc. Architect General Correspondence 7/1987 - 1/1990 | |
| Gross, Thurman & deMeers, Inc. Contract, Payments 6/1988 - 4/1990 | |
| Interview Material Gross, Thurman & DeMeers, Inc. 9/30/1987 | |
| Schematic Design Material 12/1988 - 12/1989 | |
| David L. Smith Working Papers 12/1986 - 10/1988 | |
| Specifications for a Horse Disease Laboratory Binder 2/15/1967 | |
| Rabbit Laboratory Addition to the Swine Barn Binder 10/22/1963 | |
| Program for Animal Holding and Quarantine Facilities 2/13/1978 | |
| WSU Spokane - Spokane Intercollegiate Research and Technology Institute (SIRTI) | |
| 34 | Budget 6/1988 - 1/1990 |
| Regents Reports 8/1990 - 5/1991 | |
| E.I.S. 8/1985 - 3/1991 | |
| Burke/Lee, A Joint Venture 1/1988 - 7/1993 | |
| Value Engineering 8/1990 | |
| General Correspondence # 5 4/1991 - 5/1994 | |
| General Correspondence # 4 5/1990 - 3/1991 | |
| General Correspondence # 3 12/1989 - 4/1990 | |
| General Correspondence # 2 7/1988 - 11/1989 | |
| General Correspondence # 1 2/1987 - 6/1988 | |
| 35 | Integrus Architecture (WMFL) General Correspondence # 5 7/1991 - 5/1992 |
| Integrus Architecture (WMFL) General Correspondence # 4 3/1991 - 6/1991 | |
| Integrus Architecture (WMFL) General Correspondence # 3 4/1990 - 2/1991 | |
| Integrus Architecture (WMFL) General Correspondence # 2 1/1989 - 8/1989 | |
| Integrus Architecture (WMFL) General Correspondence # 1 1/1988 - 12/1988 | |
| Integrus Architecture (WMFL) Contract, Payments # 2 5/1990 - 8/1991 | |
| Integrus Architecture (WMFL) Contract, Addendums, Payments # 1 7/1988 - 5/1990 | |
| Gifford Consultants, Inc., Geotechnical Engineering Report 11/6/1990 | |
| Wind Tunnel Study of the Proposed S.I.R.T.I. 9/15/1990 | |
| WMFL Transmittal Re: Shoreline Permit, Summary of Spaces 5/4/1990 | |
| Addendum # 1 to Final Environmental Impact Statement 5/1987 | |
| Final Environmental Impact Statement 6/1986 | |
| Draft Environmental Impact Statement 6/1986 | |
| University of Washington Value Engineering Study 6/1988 | |
| WSU Spokane Building Plan 7/1988 | |
| 36 | State of WA Dept. of Ecology State Environmental Policy Act Handbook 12/1988 |
| Spokane Riverfront Development Program 5/1974 | |
| Design Development SIRTI 7/1990 | |
| Department of Ecology Model Toxics Control Act Folder 7/1991 | |
| Preplanning and Schematic Design - Spokane University District Development 9/12/1988 | |
| Gifford Consultants, Inc., Additional Geotechnical Information 6/17/1991 | |
| WSU Spokane Building Plan 4/22/1988 | |
| WSU Spokane Miscellaneous Information Folder 1991 | |
| Riverpoint Boundary Line Adjustment # CITY 87 Map 8/1987 | |
| Fabrication Prototype Development Shop Plan 12/1990 | |
| Higher Education Park Site Plan 3/1990 | |
| Design Development Outline Specifications SIRTI 7/19/1990 | |
| A Plan for Excellence in Advance Studies - Developing the WSU - Spokane Campus 4/1988 | |
| MW Consulting Engineers Energy Conservation Report 10/1990 | |
| Program and Design Concept Spokane Facility Eastern Washington University 10/15/1990 | |
| WMFL Division 9 - Division 14 General Requirements for Work undated | |
| Construction Document Phase SIRTI Integrus Architecture 3/1991 | |
| R.F.P. for Requirements Analysis for SIRTI 8/1990 |
Archives 284
Facilities Development
Building Files and Records, 1964-1995
ACQUISITION AND PROCESSING INFORMATION
These Facilities Development Building Files and Records were transferred to Manuscripts, Archives, and Special Collections on October 25th, 1995 (UA 1995-18) by Janna (last name unrecorded) of Facilities Development. They were processed in 2009 by University Archivist Mark O'English and Tim Mace.
EXTENT/QUANTITY INFORMATION
COLLECTION DESCRIPTION & ARRANGEMENT
The collection consists of records pertaining to construction, remodeling, maintenance, and improvement of WSU buildings. The records are retained in their original order, which is primarily by building number, with a few campus-wide items located at the end. Buildings included here include Fulmer Hall and Carpenter Hall.
PREFERRED CITATION
The suggested citation for the collection is:
[Item Description]
Facilities Development Building Files and Records, 1964-1995 (UA 284)
Manuscripts, Archives, and Special Collections
Washington State University Libraries
Pullman, WA
| Box | Description |
| Building No. 0081C - Streit-Perham Hall Remodel | |
| 1 | Budget 3/1985 - 7/1987 |
| EIS 10/1984 - 6/1986 | |
| Diary Reports 11/1985 - 9/1986 | |
| Affirmative Action Reports 11/1985 - 9/1986 | |
| Landscaping Correspondence 10/1985 - 1/1986 | |
| Pittsburgh Testing 12/1985 - 6/1986 | |
| Mahan/Smith Inc. Consultants 4/1985 - 1/1986 | |
| Asbestos Reports 4/1985 - 1/1986 | |
| Long Painting Co, General Correspondence 9/1985 - 1/1987 | |
| Long Painting Co, Contract, Payments, Change Orders 8/1985 - 1/1986 | |
| Housing's Move 1/1985 | |
| General Correspondence File # 3 6/1986 - 8/1989 | |
| Clayton Joyce Architects General Correspondence File # 3 7/1986 - 1/1987 | |
| Clayton Joyce Architects Contracts, Payments, Change Orders 4/1985 - 2/1987 | |
| Lydig Construction General Correspondence 3/1986 - 8/1987 | |
| Lydig Construction Contract, Payments, Change Orders 1/1986 - 9/1987 | |
| Pending Change Proposals 1/1986 - 9/1986 | |
| Rejected Bids - Electrical 1/1986 | |
| Rejected Bids - Mechanical 1/1986 | |
| Rejected Bids - General 1/1986 | |
| Rejected Bids - Asbestos Abatement & Selective Demolition 8/1985 | |
| General Correspondence File # 2 10/1985 - 5/1986 | |
| General Correspondence File # 1 2/1985 - 9/1985 | |
| Clayton Joyce Architects File # 2 10/1985 - 6/1986 | |
| Clayton Joyce Architects File # 1 3/1985 - 9/1985 | |
| Asbestos Fin Tube (Perimeter Radiation) 6/1985 - 9/1986 | |
| Ackroyd & Associates Contract Documents Estimate prepared for Clayton Joyce Architects 11/1985 | |
| Ackroyd & Associates Design Development Estimate prepared for Clayton Joyce Architects 6/1985 | |
| Clayton Joyce Architects Asbestos Abatement & Demolition Specifications 7/1985 | |
| WSU Design Development 4/1995 | |
| Building No. 0080 - Hall Rotunda Dining Hall Renovation | |
| 2 | Budget 3/1985 - 11/1988 |
| Mahan & Smith Consultant 5/1985 - 7/1985 | |
| Building Program 8/1984 | |
| Concrete Testing 11/1985 - 4/1986 | |
| Diary Reports 11/1985 | |
| Asbestos Air Sampling Reports 5/1985 | |
| Central Painting, Inc. General Correspondence 6/1985 - 9/1985 | |
| Central Painting, Inc. Contract, Payments, Change Orders 6/1985 - 9/1985 | |
| General Correspondence File # 4 2/1986 - 4/1988 | |
| Walker McGough Foltz Lyerla Architects File # 4 4/1986 - 2/1988 | |
| Walker McGough Foltz Lyerla Architects 4/1985 - 2/1988 | |
| Affirmative Action Reports, Lydig Construction 11/1985 - 9/1986 | |
| Lydig Construction General Correspondence 10/1985 - 3/1987 | |
| Lydig Construction Contract, Payments, Change Orders File # 2 10/1985 - 2/1987 | |
| Pending Change Proposals 10/1985 | |
| Electrical Rejected Bids 9/1985 | |
| Mechanical Rejected Bids 9/1985 | |
| Rejected Bids Selective Demolition & Asbestos Abatement 6/1985 | |
| General Rejected Bids 10/1985 | |
| Stanton J. Hall Rotunda Dining Hall Renovation - Building Program 1/1985 | |
| General Correspondence File # 3 9/1985 - 1/1986 | |
| General Correspondence File # 2 4/1985 - 8/1985 | |
| General Correspondence File # 1 3/1985 - 6/1985 | |
| Walker McGough Foltz Lyerla Architects File # 3 12/1985 - 3/1986 | |
| Walker McGough Foltz Lyerla Architects File # 2 7/1985 - 11/1985 | |
| Walker McGough Foltz Lyerla Architects File # 1 2/1985 - 6/1985 | |
| Lydig Construction Contract, Payments, Change Orders File # 1 9/1985 - 2/1986 | |
| Building No. 0035 - Stimson Hall | |
| 3 | Budget 3/1982 - 4/1989 |
| Diary Reports 12/1985 - 4/1987 | |
| Affirmative Action Reports 12/1985 - 4/1987 | |
| Regents Reports 2/1984 - 6/1987 | |
| Concrete Testing 11/1985 - 5/1986 | |
| Mahan & Smith Consultants 6/1978 - 8/1978 | |
| Nelson Landscape, Inc. General Correspondence 3/1987 - 6/1987 | |
| Nelson Landscape, Inc. Contract, Payments, Change Orders 3/1987 - 6/1987 | |
| Landscaping General Correspondence 8/1986 - 7/1988 | |
| General Correspondence File # 5 12/1986 - 4/1990 | |
| Warren C. Heylman, Architect General Correspondence 7/1989 - 11/1989 | |
| Warren C. Heylman, Architect Contract, Payments, Change Orders 12/1983 - 6/1987 | |
| Lydig Construction, Inc. General Correspondence File # 5 11/1985 - 9/1989 | |
| Lydig Construction, Inc. Contract, Payments, Change Orders # 2 9/1986 - 5/1987 | |
| General Correspondence File # 4 6/1986 - 11/1986 | |
| General Correspondence File # 3 10/1985 - 5/1986 | |
| General Correspondence File # 2 5/1983 - 10/1985 | |
| General Correspondence File # 1 11/1964 - 4/1983 | |
| Warren C. Heylman, Architects General Correspondence File # 4 8/1986 - 7/1989 | |
| Warren C. Heylman, Architects General Correspondence File # 3 10/1985 - 7/1986 | |
| Warren C. Heylman, Architects General Correspondence File # 2 7/1984 - 9/1985 | |
| Warren C. Heylman, Architects General Correspondence File # 1 3/1982 - 6/1984 | |
| 4 | Lydig Construction, Inc. Contract, Payments, Change Orders # 1 10/1985 - 9/1986 |
| Pending Change Proposals 11/1985 | |
| Rejected Bids 3/1987 | |
| Rejected Bids - Mechanical 10/1985 | |
| Rejected Bids - Electrical 10/1985 | |
| Rejected Bids General 10/1985 | |
| Building Program 8/1982 | |
| Design Development Phase Cost Estimate Doyle Engineering, Inc. 5/1985 | |
| Warren C. Heylman & Partners Design Development Phase 3/1984 - 4/1984 | |
| Warren C. Heylman & Partners Proposal 4/1984 | |
| Warren C. Heylman & Partners Construction Cost Estimate Schematic Design # 3 5/1983 | |
| Warren C. Heylman & Partners 95% Completion of Contract Documents 8/1985 | |
| Warren C. Heylman & Partners Seismic Analysis 4/1986 | |
| Stimson Hall Montezuma Club - Hall Residents' Proposal 3/1983 | |
| Warren C. Heylman & Partners Schematic Design Submittal 12/1982 | |
| Warren C. Heylman & Partners Comparison Floor Plan Changes Design Development Phase 3/1984 | |
| Miscellaneous Building Files | |
| Lab Animal Resource Center - Building No. 811; General Correspondence 9/1970 - 1/1975 | |
| Troy Hall Remodel - Building No. 36; General Correspondence 9/1970 - 7/1971 | |
| Troy Hall Remodel - Building No. 36; Cost Estimate 6/1971 - 8/1972 | |
| Edgar K. Murrow Building (Arts Hall) - Building No. 33W; General Correspondence Phase II 11/1971 - 5/1973 | |
| Heald Hall Phase II - Building # 82; Decker, Kolb & Stansfield Architects Presentation for Schematic Outline Specification and Space Analysis 10/1970 | |
| Science Hall Remodeling for Electron Microscope - Building No. 32: General Correspondence 4/1970 - 7/1970 | |
| McCoy Hall Addition North - Building No. 44; General Correspondence 5/1970 - 3/1971 | |
| Fulmer Hall Addition - Building No. 3; Miscellaneous Correspondence 5/1970 - 3/1971 | |
| Wood Technology - Building No. 95; Miscellaneous Correspondence 6/1970 - 7/1971 | |
| Miscellaneous File | |
| Dog Runs - Budget Code and Architectural Fee Expense 7/1969 |