| Back to Finding Aids | |
| Washington State University Libraries Manuscripts, Archives, and Special Collections Pullman, WA 99164-5610 USA (509) 335-6691 Inquiries |
Archives 106
Washington State University
Facilities Planning Building File, 1945-1980 (bulk, 1965-1970)
This portion of the University Architect/Facilities Planning building file was transferred to university archives in 1981 (UA81-11) and 1982 (UA82-09), in accordance with approved records schedules. The records were processed by Ann Klavano in March 1983, and the descriptions were expanded and enhanced by Brenda Jackson in September, 2000.
HISTORY
An University Architect has served as the construction officer of Washington State University from 1911 onward. The modern form of the office dates from 1947, when it became a full-time, staffed administrative department. In 1967, the office was renamed as Facilities Planning and later as Facilities Development. It is responsible for the major construction projects of the university.
ARRANGEMENT AND DESCRIPTION
Records of the University Architect/Facilities Planning are arranged according the building number system that identifies structures owned by Washington State University. The archival arrangement of the records follows the office practice without variance.
Locating records revenant to a specific project or building requires having the building number available.
The records consist of correspondence, reports, bidding records, and other documents related to architecture work and construction.
CONTAINER LIST
| Box | Folder | Description |
| Old Administration Building Remodeling (Foreign Language Building) - Bldg. 1 | ||
| 1 | 1 | Budget |
| 2 | DHEW Correspondence | |
| 3 | Rejected Bids | |
| 4 | Program | |
| 5 | General Correspondence, 1967-1972 | |
| 6 | DeNeff, Debble & Barton, Correspondence, 6/67-4/69 | |
| 7 | DeNeff, Debble & Barton, Correspondence, 5/69-1970 | |
| 8 | DeNeff, Debble & Barton, Contracts & Change Orders | |
| 9 | S.G. Morin & Son, Inc., Correspondence | |
| 10 | S.G. Morin & Son, Inc., Contracts, Payments, C.O.s | |
| Fulmer Hall Annex - Bldg. 3 | ||
| 11 | Building Vibration Report | |
| 12 | Marque, Clerc & Riley, Correspondence, 1971-1972 | |
| Bohler Gym, Remodeling of Coaches Offices - Bldg. 11 | ||
| 13 | Budget | |
| 14 | General Correspondence, 1968-1971 | |
| 15 | General Correspondence, 1970-1971 | |
| 16 | Paddock & Hollingbery, Archs., Corres., 1969-1971 | |
| 17 | Paddock & Hollingbery, Archs., Corresp., 1970 | |
| 18 | Paddock & Hollingbery, Archs., Contract & Change Orders | |
| 19 | Selkirk Company, Correspondence, 1968-1969 | |
| 20 | Selkirk Company, Contract & Change Orders | |
| 21 | Commercial Builders, Inc., Correspondence, 1970 | |
| 22 | Commercial Builders, Inc., Contract, Payments & C.O.s | |
| 23 | Warren, Little & Lund, Inc., Correspondence, 1968-1970 | |
| 24 | Warren, Little & Lund, Inc., Contract & Change Orders | |
| 25 | Mott Electric Co., Correspondence, 1968-1969 | |
| 26 | Mott Electric Co., Contract & Change Orders | |
| 27 | Rejected Bids | |
| Smith Gym Remodeling - Bldg. 12 | ||
| 28 | Renaming, 1961 | |
| 29 | General Correspondence, 1968-1970 | |
| 30 | Paddock & Hollingbery, Archs., Corres., 1969-1970 | |
| 31 | Paddock & Hollingbery, Archs., Contract & Change Orders | |
| 32 | Selkirk Co., Correspondence, 1968-1969 | |
| 33 | Selkirk Co., Contract & Change Orders | |
| 34 | Warren, Little & Lund, Inc., Corres., 1968-1969 | |
| 35 | Warren, Little & Lund, Inc., Contract & Change Orders | |
| 36 | Mott Electric Co., Correspondence, 1968-1969 | |
| 37 | Mott Electric Co., Contract & Change Orders | |
| McCroskey Hall - Bldg. 19 | ||
| 38 | General Correspondence, 1971 | |
| Carpenter Hall - Bldg. 20 | ||
| 39 | General Correspondence, 1970 | |
| Maintenance Building - Bldg. 21 | ||
| 40 | General Correspondence, 1966 | |
| President's Residence Remodel - Bldg. 31 | ||
| 41 | Budget | |
| 42 | Prospectus | |
| 43 | Correspondence, 1946-1952 | |
| 44 | General Correspondence, 1967-1968 | |
| 45 | Trogdon & Smith, Archs., Corres., 1967-1968 | |
| 46 | Trogdon & Smith, Archs., Construction Reports | |
| 47 | Trogdon & Smith, Archs., Contract & Change Orders | |
| 48 | Sceva Construction Co., Correspondence, 1967-1968 | |
| 49 | Budget, Sprinkler System & Landscaping | |
| 50 | Sceva Construction Co., Contract & Change Orders | |
| 51 | L. Keith Hellstrom, Lands. Arch., Corres., 1967 | |
| 52 | Nelson Landscape Service, Corres., 1967-1968 | |
| 53 | Nelson Landscape Service, Contract & Change Orders | |
| 54 | Rejected Bids, 1967 | |
| 55 | Rejected Bids, Mechanical | |
| 56 | Rejected Bids, Electrical | |
| 57 | Rejected Bids, Landscaping | |
| Troy Hall Elevator - Bldg. 36 | ||
| 58 | General Correspondence, 1961 | |
| 59 | Budget | |
| 60 | General Correspondence, 1969-1970 | |
| 61 | Douglas C. Durkoop, Arch., Corres., 1969-1970 | |
| 62 | Douglas C. Durkoop, Arch., Contract, Payments & C.O.s | |
| 63 | C&S Builders, Inc., Contract, Payments & C.O.s | |
| 64 | C&S Builders, Inc., General Correspondence | |
| 65 | Rejected Bids | |
| Van Doren Hall - Bldg. 37 | ||
| 66 | General Correspondence, 1960-1967 | |
| Wilson Hall Alterations - Bldg. 40 | ||
| 67 | Budget | |
| 68 | General Correspondence, 1960-1970 | |
| 69 | General Correspondence, 1967-1969 | |
| 70 | General Conditions for Rural Sociology & Sociology | |
| 71 | Musgrove & Marshall, Archs., General Corres., 1967-1970 | |
| 72 | Musgrove & Marshall, Contract & Change Orders | |
| 73 | Vern W. Johnson & Sons, Corres., 1968-1969 | |
| 74 | Vern W. Johnson & Sons, Contract & Change Orders | |
| 75 | Rejected Bids | |
| Wegner Hall - Bldg. 45 | ||
| 2 | 76 | General Correspondence, 1960 |
| Engineering Lab Building - Bldg. 46 | ||
| 77 | General Correspondence, 1963 | |
| Endoparasite Vector Laboratory - Bldg. 47 | ||
| 78 | General Correspondence, 1964-1968 | |
| Sewage - Bldg. 51 | ||
| 79 | Correspondence, Contract & Payments, 1946-1951 | |
| Todd Hall - Bldg. 55 | ||
| 80 | General Correspondence, 1963-1967 | |
| Shock Dynamics Laboratory - Bldg. 56 | ||
| 81 | General Correspondence, 1967 | |
| 82 | L.C. Campbell, Contract & Change Orders | |
| Mining Experiment Station - Bldg. 57 | ||
| 83 | General Correspondence, 1960 | |
| W.J. Spillman Hall - Bldg. 59 | ||
| 84 | General Correspondence, 1960-1961 | |
| 85 | General Correspondence, 1971-1973 | |
| Ernest Holland Library - Bldg. 62 | ||
| 86 | General Correspondence, 1961-1969 | |
| 87 | General Correspondence, 1968 | |
| 88 | Barnard & Holloway, Archs., Corres., 1970 | |
| Student Bookstore - Bldg. 64 | ||
| 89 | Dedicatory Plaque, General Corres., 1965-1966 | |
| Kreugel, McAllister, Neill Halls - Bldg. 69 | ||
| 90 | General Correspondence, 1970-1971 | |
| Nuclear Radiation Center - Bldg. 74 | ||
| 91 | General Correspondence, 1980 | |
| Johnson Hall - Bldg. 76 | ||
| 92 | General Correspondence, 1972 | |
| Gannon-Goldsworthy Hall - Bldg. 79 | ||
| 93 | Shower Floors, 1964-1970 | |
| Streit-Perham Hall - Bldg. 81 | ||
| 94 | Architect's Correspondence, 1959 | |
| Safety Building Renovation - Bldg. 84 | ||
| 95 | Program | |
| 96 | General Correspondence, 1969 | |
| 97 | Douglas C. Durkoop, Arch., Corres., 1969 | |
| 98 | Douglas C. Durkoop, Arch., Contract, Payments, C.O.s | |
| Comparative Behavior Lab. Addition - Bldg. 90 | ||
| 99 | Budget | |
| 100 | NIH Application & Correspondence, 1965-1967 | |
| 101 | General Correspondence, 1965-1969 | |
| 102 | General Correspondence, 1970-1971 | |
| 103 | Victor L. Wulff, Arch., Corres., 1965-4/66 | |
| 104 | Victor L. Wulff, Arch., Corres., 5/66-1969 | |
| 105 | Victor L. Wulff, Arch., Corres., 1970-1971 | |
| 106 | Victor L. Wulff, Arch., Contract & Change Orders | |
| 107 | Victor L. Wulff, Arch., Inspection Reports | |
| 108 | Diary Inspection Reports | |
| 109 | Commercial Builders, Inc., Corres., 1968-1971 | |
| 110 | Commercial Builders, Inc., Contract, Payments, C.O.s | |
| 111 | Finish Hardware & Keying Schedule | |
| 112 | University of Idaho, Testing, 1963 | |
| 113 | Pittsburgh Testing Lab., Concrete Testing, 1970 | |
| 114 | Weston Mechanical Contractors, Corres., 1968-1971 | |
| 115 | Weston Mechanical Contractors, Contracts, Payments, C.O.s | |
| 116 | Ray Dillon Electric Co., Inc., Corres., 1968-1971 | |
| 117 | Ray Dillon Electric Co., Inc., Contract, Payments, C.O.s | |
| 118 | Rejected Bids, General | |
| 119 | Rejected Bids, Electrical | |
| 120 | Rejected Bids, Mechanical | |
| Publications Court - Bldg. 91 | ||
| 121 | Washington Testing Labs., Soils Investigation | |
| 122 | Budget | |
| 123 | Program | |
| 124 | General Correspondence, 1969-1971 & Diary Inspec. Reports | |
| 125 | Douglas C. Durkoop, Arch., Corres., 1969-1970 | |
| 126 | Douglas C. Durkoop, Arch., Contract, Payments & C.O.s | |
| 127 | Commercial Builders, Corres., 1970-1971 | |
| 128 | Commercial Builders, Contract, Payments, C.O.s | |
| 129 | Rejected Bids | |
| C. Clement French Administration Bldg. - Bldg. 92 | ||
| 130 | Budget | |
| 131 | Program | |
| 132 | General Correspondence, 1962-6/65 | |
| 133 | General Correspondence, 7/65-1966 | |
| 134 | General Correspondence, 1967 | |
| 135 | General Correspondence, 1968-1974 | |
| 136 | Shannon & Wilson, Inc., Soils Eng., Pile Driving | |
| 137 | Shannon & Wilson, Inc., Soils Eng., Rept. on Found. Invest. | |
| 138 | Kirk, Wallace, McKinley, Archs., Corres., 1963-1965 | |
| 139 | Kirk, Wallace, McKinley, Archs., Corres., 1/66 - 5/66 | |
| 140 | Kirk, Wallace, McKinley, Archs., Corres., 6/66 - 10/70 | |
| 3 | 141 | Kirk, Wallace, McKinley, Archs., Job Conference Notes |
| 142 | Kirk, Wallace, McKinley, Archs., Contract & C.O.s | |
| 143 | James B. Notkin, Mech. Eng., Corres., 1965-1968 | |
| 144 | Thomas E. Sparling., Elec. Eng., Corres., 1965-1966 | |
| 145 | HEFA Correspondence, 1966 | |
| 146 | Christiansen Brothers, Inc., Corres., 1966-1969 | |
| 147 | Christiansen Brothers, Inc., Contract & C.O.s | |
| 148 | Finish Hardware | |
| 149 | General Corres., Testing, 1965-1967 | |
| 150 | Pittsburgh Testing Labs., Concrete Testing | |
| 151 | Washington Testing Labs., Concrete Testing | |
| 152 | Warren, Little & Lund, Mech. Eng., Corres., 1966-1968 | |
| 153 | Warren, Little & Lund, Mech. Eng., Contract & C.O.s | |
| 154 | Kehne-Crabtree Electric Co., Contract & C.O.s | |
| 155 | Kehne-Crabtree Electric Co., Corres., 1966-1968 | |
| 156 | Bank & Office Interiors, Inc., Corres & P.O.s | |
| 157 | Richard Haag Assoc., Lands. Arch., Corres., 1965-1968 | |
| 158 | Stanek's Nurseries, Inc., Corres., 1966-1969 | |
| 159 | Stanek's Nurseries, Inc., Contract, Payments, C.O.s | |
| 160 | Rejected Bids, General Construction | |
| 161 | Rejected Bids, Mechanical | |
| 162 | Rejected Bids, Electrical | |
| 163 | Rejected Bids, Landscape | |
| President's Office Completion - Bldg. 92 | ||
| 164 | Budget | |
| 165 | General Correspondence, 1968-1970 | |
| 166 | Walter, Dorwin, Teague, Archs., Contract, Payments, C.O.s | |
| 167 | Walter, Dorwin, Teague, Archs., Corres., 1968-1969 | |
| Stephenson Residence Center, Bldg. "D" - Bldg. 93 | ||
| 168 | Budget | |
| 169 | HHFA Project Summary | |
| 170 | General Correspondence, 1964-1969 | |
| 171 | General Correspondence, 1969-1973 | |
| 172 | General Correspondence, Architects | |
| 173 | Walker, McGough, Foltz, Archs., Corres. 1967 | |
| 174 | Walker, McGough, Foltz, Archs., Corres., 1/68 - 7/69 | |
| 175 | Walker, McGough, Foltz, Archs., Contract, Payments, C.O.s | |
| 176 | Construction Conference Notes | |
| 4 | 177 | Diary-Inspection Reports |
| 178 | Electrical Consultants, Corres., 1964-1968 | |
| 179 | Alfred Brown Co., Extra Work Reports | |
| 180 | Alfred Brown Co., Contract, Payments, C.O.s | |
| 181 | Alfred Brown Co., Corres., 1968-1970 | |
| 182 | Finish Hardware | |
| 183 | Testing | |
| 184 | Shannon & Wilson, Inc., Soils Eng., Found. Investigation | |
| 185 | United States Testing Co., Concrete Testing | |
| 186 | Snelson, Inc., Mech. Contractor, Contract & C.O.s | |
| 187 | Snelson, Inc., Mech. Contractor, Corres., 1967-1970 | |
| 188 | Kehne-Crabtree Electric Co., Corres., 1968-1969 | |
| 189 | Kehne-Crabtree Electric Co., Contract & C.O.s | |
| 190 | Furnishings, Correspondence, 1968-1970 | |
| 191 | Spokane Dry Goods, Inc., Contract, Payments & C.O.s | |
| 192 | Serta Mattress Co., Contract, Payments & C.O.s | |
| 193 | Walker & McGough, Daily Inspec. Reports, 3/68-12/68 | |
| 194 | Magna Design, Inc., Contract, Payments, C.O.s | |
| 195 | Nelson Landscape Service, Corres., 1968-1970 | |
| 196 | Nelson Landscape Service, Contract & Change Orders | |
| 197 | Rejected Bids, General | |
| 198 | Rejected Bids, Mechanical | |
| 199 | Rejected Bids, Electrical | |
| 200 | Rejected Bids, Landscaping | |
| 201 | Rejected Bids, Furnishings | |
| 202 | Rejected Bids, Furnishings, 1967 | |
| Parking Area South of Forest - Bldg. 93 | ||
| 203 | HHFA, 1965-1966 | |
| 204 | General Correspondence, 1965-1966 | |
| 205 | Kenneth W. Brooks, Arch., Contract & C.O.s | |
| 206 | Kenneth W. Brooks, Arch., Corres., 1965-1966 | |
| 207 | Max J. Kuney Co., Corres., 1965-1966 | |
| 208 | Max J. Kuney Co., Contract & Change Orders | |
| 209 | V. Eugene Cameron, Surveying | |
| 210 | Rejected Bids | |
| Johnson Tower - Bldg. 94 | ||
| 211 | General Correspondence, 1964 | |
| Wood Technology - Bldg. 95 | ||
| 212 | Budget | |
| 213 | General Correspondence, 1969-1971 | |
| 214 | Carlson & James, Archs., Corres., 1970-1971 | |
| 215 | Carlson & James, Archs., Contract, Payments, C.O.s | |
| 216 | Commercial Builders, Inc., Corres., 1971 | |
| 217 | Commercial Builders, Inc., Contract, Estimates, C.O.s | |
| 218 | Rejected Bids | |
| Physical Education Building - Bldg. 96 | ||
| 219 | Budget | |
| 220 | HEFA Correspondence, 1967-1971 | |
| 221 | Shannon & Wilson, Foundation Invest. Correspondence | |
| 222 | Shannon & Wilson, Foundation Investigation | |
| 223 | Program Statement | |
| 224 | General Correspondence, 1963-1967 | |
| 225 | General Correspondence, 1968-4/69 | |
| 226 | General Correspondence, 5/69 - 6/70 | |
| 227 | General Correspondence, 7/70 - 1973 | |
| 5 | 228 | Paddock & Hollingbery, Archs., Corres., 7/66 - 12/67 |
| 229 | Paddock & Hollingbery, Archs., Corres., 1/68 - 4/69 | |
| 230 | Paddock & Hollingbery, Archs., Corres., 5/69 - 6/70 | |
| 231 | Paddock & Hollingbery, Archs., Corres., 7/70 - 1972 | |
| 232 | Weekly Employment Record | |
| 233 | Paddock & Hollingbery, Archs., Contract & C.O.s | |
| 234 | Esvelt & Saxton, Consulting Engineers | |
| 235 | Valentine, Fisher, Tomlinson, Consulting Engineers | |
| 236 | Selkirk Co., Corres., 1968-1970 | |
| 237 | Selkirk Co., Contract & Change Orders | |
| 238 | Keying Schedule | |
| 239 | Pittsburgh Testing Lab., Concrete Testing | |
| 240 | Warren, Little & Lund, Inc., Corres., 1968-1971 | |
| 241 | Warren, Little & Lund, Inc., Contract & C.O.s | |
| 242 | Mott Electric Co., Inc., Corres., 1968-1970 | |
| 243 | Mott Electric Co., Inc., Contract & C.O.s | |
| 244 | Rejected Bids, General | |
| 245 | Rejected Bids, Mechanical | |
| 246 | Rejected Bids, Electrical | |
| New Fine Arts Building - Bldg. 97 | ||
| 247 | Phase 2 Space Requirements | |
| Insect Flight Room - Bldg. 111A | ||
| 248 | Budget | |
| 249 | General Correspondence, 1969-1971 | |
| 250 | Douglas C. Durkoop, Arch., Contract, Payments, C.O.s | |
| 251 | Douglas C. Durkoop, Arch., Corres., 1969-1970 | |
| 252 | Valley Builders, Corres., 1970-1971 | |
| 253 | Valley Builders, Contract, Payments, C.O.s | |
| 254 | Rejected Bids | |
| Controlled Environment Facilities - Bldg. 114 | ||
| 255 | Budget | |
| 256 | General Correspondence, 1966 - 6/68 | |
| 257 | General Correspondence, 7/68 - 1974 | |
| 258 | ADSCO Construction Co., Corres., 1968-1970 | |
| 259 | ADSCO Construction Co., Contract & C.O.s | |
| 260 | Concrete Testing | |
| 261 | D. Bingham Mechanical Co., Corres., 1968-1970 | |
| 262 | D. Bingham Mechanical Co., Contract & C.O.s | |
| 263 | Spence Electric Co., Corres., 1968-1969 | |
| 264 | Spence Electric Co., Contract & C.O.s | |
| 265 | Rejected Bids, General | |
| 266 | Rejected Bids, Electrical | |
| 267 | Rejected Bids, Mechanical | |
| 268 | Rejected Bids, Electrical | |
| 269 | Rejected Bids, Mechanical | |
| USDA Greenhouse - Bldg. 114H | ||
| 270 | General Correspondence, 1963-1970 | |
| 271 | General Correspondence, 1963-1964 | |
| 272 | General Correspondence, 1967-1970 | |
| 273 | C&S Builders, Contract, C.O.s, Correspondence | |
| 274 | General Machinery Co., Contract, C.O.s, Correspondence | |
| 275 | B&W Utility Co., Contract, C.O.s, Correspondence | |
| Seed House - Bldg. 115 | ||
| 276 | General Correspondence, 1972 | |
| Hilltop Stables - Bldg. 151 | ||
| 277 | General Correspondence, 1946-1952 | |
| Bee Research Labs - Bldg. 194 | ||
| 278 | General Correspondence, 1961-1962 | |
| 279 | Walter N. Varnum, Corres., 1964-1965 | |
| 280 | General Correspondence, 1964-1965 | |
| 281 | Walter N. Varnum, Contract & C.O.s | |
| 282 | Rejected Bids | |
| Fur Farm and Apiary Relocation - Bldg. 197 | ||
| 283 | Budget | |
| 284 | General Correspondence, 1961-1971 | |
| 285 | Boyington & Reed, Archs., Corres., 1969-1970 | |
| 286 | Boyington & Reed, Archs., Contract, Payments, C.O.s | |
| 287 | J.J. Dodgen, Corres., 1969-1970 | |
| 288 | J.J. Dodgen, Contract, Payments, C.O.s | |
| 289 | Rejected Bids | |
| Horse Disease Lab - Bldg. 197L | ||
| 6 | 290 | Budget |
| 291 | General Correspondence, 1966-1967 | |
| 292 | Neal Builders, Inc., Corres., 1967 | |
| 293 | Neal Builders, Inc., Contract & C.O.s | |
| 294 | Rejected Bids | |
| Troposcatter Transmitter Facility - Bldg. 312 | ||
| 295 | Budget | |
| 296 | General Correspondence, 1967 | |
| 297 | C&S Builders, Corres., 1967 | |
| 298 | C&S Builders, Contract & Change Orders | |
| 299 | Rejected Bids | |
| Intramural Fields - Bldg. 314 | ||
| 300 | Budget | |
| 301 | General Correspondence, 1968-1970 | |
| 302 | Robt. L. Woerner, Lands. Arch., Corres., 1969-1970 | |
| 303 | Robt. L. Woerner, Lands. Arch., Contract, Payments, C.O.s | |
| 304 | Warren, Little & Lund, Inc., Corres., 1969-1971 | |
| 305 | Warren, Little & Lund, Inc., Contract, Payments, C.O.s | |
| Golf Course - Bldg. 365 | ||
| 306 | Budget | |
| 307 | General Correspondence, 1968-1971 | |
| 308 | Robt. Muir Graves, ASGCA, Corres., 1969-1972 | |
| 309 | Robt. Muir Graves, ASGCA, Contract, Payments, C.O.s | |
| 310 | Progress Report | |
| 311 | Nelson Landscape Service, Corres., 1969-1971 | |
| 312 | Nelson Landscape Service, Contract, Payments, C.O.s | |
| Golf Course & Intramural Service Bldgs. - Bldg. 365A | ||
| 313 | Budget | |
| 314 | General Correspondence, 1971-1972 | |
| 315 | Adkison Architects, Corres., 1971 | |
| 316 | Adkison Architects, Contract, Payments, C.O.s | |
| 317 | Sceva Construction, Corres., 1971-1972 | |
| 318 | Sceva Construction, Contract, Payments, C.O.s | |
| 319 | Rejected Bids | |
| 320 | Rejected Bids | |
| 321 | Golf Course Screens, Corres., 1966 | |
| Sheaf Storage Building - Bldg. 401F | ||
| 322 | Budget | |
| 323 | Correspondence, 1968-1970 | |
| 324 | Sceva Steel Buildings, Corres., 1968 | |
| 325 | Sceva Steel Buildings, Contract & Change Orders | |
| 326 | Rejected Bids | |
| Rogers-Orton Dormitory - Bldg. 802 | ||
| 327 | General Correspondence, 1968-1969 | |
| 328 | Building Program | |
| 329 | Lea, Pearson & Richards, Archs., Corres., 1968 | |
| Humanities Building - Bldg. 803 | ||
| 330 | Budget | |
| 331 | Richard Haag Assoc., Lands. Arch., Corres., 1969 | |
| 332 | General Correspondence, 1967-1970 | |
| 333 | Facilities Planning, Phase I | |
| 334 | Facilities Planning, Correspondence | |
| 335 | Fred Bassetti & Co., Arch., Corres., 1968-1972 | |
| 336 | George C. Izenour & Assoc., Corres., 1969-1970 | |
| 337 | Fred Bassetti & Co., Arch., Contract & C.O.s | |
| Child & Family Studies Center - Bldg. 804 | ||
| 338 | Budget | |
| 339 | Warren, Cummings, Heylman, Archs., Schematic Design | |
| 340 | Building Program | |
| 341 | General Correspondence, 1968-1969 | |
| 342 | Warren, Cummings, Heylman, Archs., Corres., 1968-1969 | |
| 343 | Warren, Cummings, Heylman, Archs., Contract & C.O.s | |
| Poultry Building-Puyallup - Bldg. 1000 | ||
| 344 | General Correspondence, 1964-1966 | |
| 345 | General Correspondence, 1968-1969 | |
| 346 | Brudevold & Putnam, Archs., Corres., 1968-1969 | |
| 347 | Brudevold & Putnam, Archs., Contract & C.O.s | |
| 348 | Prime Construction Co., Corres., 1968-1969 | |
| 349 | Prime Construction Co., Contract, Payments, C.O.s | |
| 350 | Office & Lab Penthouse Louvers, Prime Cons., Contract, Payments, C.O.s | |
| 351 | Rejected Bids | |
| Sewer Extention - Puyallup | ||
| 352 | General Correspondence, 1967-1973 | |
| 353 | L.R. Steele Construction, Correspondence | |
| 354 | L.R. Steele Construction, Contract & C.O.s | |
| 355 | Rejected Bids | |
| SW Washington Experiment Station, Vancouver | ||
| 356 | General Correspondence, 1948-1958 | |
| Two Pre-Fab Storage Sheds, SWWES, Vancouver | ||
| 357 | Correspondence, 1963 | |
| 358 | Rose City Pre-Cut Buildings, Inc., Corres., 1963 | |
| 359 | Rose City Pre-Cut Buildings, Inc., Contract & C.O.s | |
| 360 | Rejected Bids | |